ML18081A428
| ML18081A428 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 08/29/1979 |
| From: | Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Schneider F Public Service Enterprise Group |
| Shared Package | |
| ML18081A426 | List: |
| References | |
| NUDOCS 7910290095 | |
| Download: ML18081A428 (2) | |
See also: IR 05000272/1979007
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I.
631 PARK AVENUE
KING OF PRUSSIA, PENNSYLVANIA 19406
Docket No. 50-272
Public Service Electric and Gas Company
ATTN:
Mr. F. W. Schneider
Vice President - Production
80 Park Place
Newark, New Jersey
07101
Gentlemen:
Subject:
Inspection 50-272/79-07
AUG 2 9 1979
This refers. to the inspection conducted by Mr. J. R. White of this offke
on February 6-9, 1979 at the Salem Nuclear Generating Station, Unit l of
activities authorized by NRC License No~ DPR-70 and to the discussions of
our findings held by Mr. White with Mr. H.
J~ Midura of your staff at the
conclusion of the inspection, and to a subsequent telephone discussion
between Mr. J. Gueller of your staff and Mr. White on May 22, 1979.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
W.ithin these areas, .the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, measurements
made by the inspector,. and observations by the inspector.
Our inspector also verified the steps you have taken to correct the item of
.noncompliance brought to* your attention in a letter dated January 2, 1979.
We have no fu.rther questions regarding your action at this time.
Based on the results.of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as
set forth in*the Notice of Violation, enclosed herewith as Appendix A.
These items of noncompliance have been categorized into the levels as
described in our correspondence to you dated December 31, 197.4.
This
notice is sent to you pursuant to the provisions of Section 2.201 of the
NRC
1s
11 Rules of Practice,
11 Part 2, Title 10,.Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within twenty (20)
days of your receipt of th.is notice, a written statement or explanation in
reply including:. (l) corrective steps which have been taken by you and the
results a.chieved; (2) corrective steps Which will be taken to avoid further
items of noncompliance; and (3) the date when full compliance will be
achieved~
Public Service Gas and Electric
Company
2
.In a.ccordance with Section.2.790 of the NRC's uRules of Practice," Pa.rt 2,
Title 10, Code of Federal* Regulati,ons.,. a copy of this *1etter and the enclosures
will* be pla.ced in the. NRC's**public**oocument* Room.
If this*report* conta,ins
any information that you (or your contractor) believe to be proprietary, it
____
,-i_s_neces.sar-y~tha~t-y.o~make---a-wr-i.-tten-appt-i-ca:tion-:-wi*thin~O-days to tli i-=,_s ______ _
- office to withhold such information from public disclosure. Any such application
must be accompanied by an affidavit executed by the owner of the information,
which identifies the document or part sought to be withheld, and which , * *
contains a statement of reasons which addresses with specificity the items
which will be cons.idered by. :the Corrmission as listed in subparagraph {b)
(4) of Section 2.790.
The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If
we do not hear* from you. in this regard within the specified period,. the
report will be placed. in the Public Document Room.
Should you have any ques'tions concerning. this. inspection, we will be pleased
to discuss them with you.
Enclosures:*
1.
Appendix A, Notice of Violation
2.
Office of Inspection. and: Enforcement Inspection
Report Number 50-272/79-:-07
cc w/encls:
. F. P .- Li bri*zzi, Genera.l Manager - Electric Production
E .. N. Schwa l j e, Ma.n_ager - Quality Assurance
R .. L. Mittl, General Manager - Licensing and Environment
H. J. Midura, Man.ager - *salem Generatfng Station