Forwards IE Inspec Rept 50-311/78-30 on 780828-31 During Which No Items of Noncompliance Were Noted
ML18078A356
Person / Time
Site: Salem PSEG icon.png
Issue date: 09/19/1978
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Marton T
Public Service Enterprise Group
Shared Package
ML18078A357 List:
References
NUDOCS 7811080290
Download: ML18078A356 (2)


See also: IR 05000311/1978030

Text

(j

5

b .. The following procedures were also reviewed to verify that

adequate testing is planned in order to satisfy regulatory

guidance and licensee commitments.

SUP 11 Rev. 0 Approved June 6, 1978.

Component Cooling System-Cold.

SUP 17.l Rev. O Approved July 27, 1978.

Manipulator Crane Indexing.

SUP 17.2 Rev. 0 Approved August 1, 1978. *

Fuel Handling Crane Indexing.

.

SUP 17.3 Rev. 0 Approved June 20, 1978.

Fuel Handling Tools and Fixtures - Fuel

Handling Building.

SUP 17.4 Rev. 0 Approved August 22, 1978.

Fuel Handling Equipment and Tools.

SUP 17.5 Rev. 0 Approved August 1, 1978.

Fuel Transfer System.

SUP 23 Rev. 0 Approved August 9, 1978.

Communication System.

SUP 26 Rev. 0 Approved August 3, 1978.

Computer Input and Data Printout Verification.

SUP 33 Rev~ 0 Approved June 9, 1.978.

Condenser Air. Removal.

SUP 33A Rev. 0 Approved August 3, 1978.

c. **Findings

No discrepancies were noted in the review of these procedures

and the inspector had no- further questions at this time.

d.

The following procedures were requested by the inspector and

received for review.

SUP 27.lA Rev. 0 Approved June 20, 1978.

2A 28VDC System

SUP 27.18 Rev. 0 Approved June 20, 1978.

28 28VDC System

--

SUP 27.2A Rev. 0 Approved June-*20, 1978.

2A T25VDC System

SUP 27.2C Rev. 0 Approved June 20, 1978.

2C 125VDC System

SUP 27.20 Rev. 0 Approved March 27, 1978 ..

2A & 28 125VDC System

SUP 27.3 Rev. 2 Approved July 11, 1978.

No. 2 250VDC System

I

---

- --

__ _,_ ____ -* -

6

5.

Local Leak Rate Test Witnessing

6.

Local leak rate testing was witnessed on Wednesday, August 30,

1978. Three items concerning leak rate testing were addressed to

licensee's representatives during the- inspection. The items are as

follows:

-LRT instrument range accuracy. -This item will be left as an

unresolved item.

Containment sump suction valve.

This item will be left as an

unresolved item.

Containment weld channels. This item will be left as an

Inspector Followup Item.

The three preceding items covered in detail, will appear in In-

spection Report 311/78-29.

  • unresolved.and Open Items

Unresolved items are matters about which more information is re-

quired in order to ascertain whether they are acceptable items,

items of noncompliance or deviations.

The unresolved items are

identified in Paragraphs. 2 and 5.

Open items are matters about which additional information is re-

quired to complete the review of preliminary or draft procedures.

The open items are identified in Paragraphs 2, 3 and 5.

Exit Interview

At the conclusion of the site inspection on August 3T, 1978, an

  • exit meeting was conducted with the licensee

1 s senior site repre-_

sentatives (denoted in paragraph 1).

The findings were identified

and the open and unresolved items were discussed *