(j
5
b .. The following procedures were also reviewed to verify that
adequate testing is planned in order to satisfy regulatory
guidance and licensee commitments.
SUP 11 Rev. 0 Approved June 6, 1978.
Component Cooling System-Cold.
SUP 17.l Rev. O Approved July 27, 1978.
Manipulator Crane Indexing.
SUP 17.2 Rev. 0 Approved August 1, 1978. *
Fuel Handling Crane Indexing.
.
SUP 17.3 Rev. 0 Approved June 20, 1978.
Fuel Handling Tools and Fixtures - Fuel
Handling Building.
SUP 17.4 Rev. 0 Approved August 22, 1978.
Fuel Handling Equipment and Tools.
SUP 17.5 Rev. 0 Approved August 1, 1978.
Fuel Transfer System.
SUP 23 Rev. 0 Approved August 9, 1978.
Communication System.
SUP 26 Rev. 0 Approved August 3, 1978.
Computer Input and Data Printout Verification.
SUP 33 Rev~ 0 Approved June 9, 1.978.
Condenser Air. Removal.
SUP 33A Rev. 0 Approved August 3, 1978.
c. **Findings
No discrepancies were noted in the review of these procedures
and the inspector had no- further questions at this time.
d.
The following procedures were requested by the inspector and
received for review.
SUP 27.lA Rev. 0 Approved June 20, 1978.
2A 28VDC System
SUP 27.18 Rev. 0 Approved June 20, 1978.
28 28VDC System
--
SUP 27.2A Rev. 0 Approved June-*20, 1978.
2A T25VDC System
SUP 27.2C Rev. 0 Approved June 20, 1978.
2C 125VDC System
SUP 27.20 Rev. 0 Approved March 27, 1978 ..
2A & 28 125VDC System
SUP 27.3 Rev. 2 Approved July 11, 1978.
No. 2 250VDC System
I
---
- --
__ _,_ ____ -* -
6
5.
Local Leak Rate Test Witnessing
6.
Local leak rate testing was witnessed on Wednesday, August 30,
1978. Three items concerning leak rate testing were addressed to
licensee's representatives during the- inspection. The items are as
follows:
-LRT instrument range accuracy. -This item will be left as an
unresolved item.
Containment sump suction valve.
This item will be left as an
unresolved item.
Containment weld channels. This item will be left as an
Inspector Followup Item.
The three preceding items covered in detail, will appear in In-
spection Report 311/78-29.
- unresolved.and Open Items
Unresolved items are matters about which more information is re-
quired in order to ascertain whether they are acceptable items,
items of noncompliance or deviations.
The unresolved items are
identified in Paragraphs. 2 and 5.
Open items are matters about which additional information is re-
quired to complete the review of preliminary or draft procedures.
The open items are identified in Paragraphs 2, 3 and 5.
Exit Interview
At the conclusion of the site inspection on August 3T, 1978, an
- exit meeting was conducted with the licensee
1 s senior site repre-_
sentatives (denoted in paragraph 1).
The findings were identified
and the open and unresolved items were discussed *