ML18069A001

From kanterella
Jump to navigation Jump to search
SMR DC RAI - Request for Additional Information No. 382 Erai No. 9402 (Ch. 18)
ML18069A001
Person / Time
Site: NuScale
Issue date: 03/10/2018
From:
NRC
To:
NRC/NRO/DNRL/LB1
References
Download: ML18069A001 (3)


Text

NuScaleDCRaisPEm Resource From: Chowdhury, Prosanta Sent: Saturday, March 10, 2018 7:29 PM Cc: Lee, Samuel; Cranston, Gregory; Murray, Demetrius; Rivera-Varona, Aida; NuScaleDCRaisPEm Resource

Subject:

Request for Additional Information No. 382 eRAI No. 9402 (Ch. 18)

Attachments: Request for Additional Information No. 382 (eRAI No. 9402).pdf Attached please find NRC staffs request for additional information (RAI) concerning review of the NuScale Design Certification Application.

Please submit your technically correct and complete response within 60 days of the date of this RAI to the NRC Document Control Desk.

If you have any questions, please contact me.

Thank you.

Prosanta Chowdhury, Project Manager Licensing Branch 1 (NuScale)

Division of New Reactor Licensing Office of New Reactors U.S. Nuclear Regulatory Commission 301-415-1647 1

Hearing Identifier: NuScale_SMR_DC_RAI_Public Email Number: 410 Mail Envelope Properties (BN7PR09MB260933592851887B369E43B39EDC0)

Subject:

Request for Additional Information No. 382 eRAI No. 9402 (Ch. 18)

Sent Date: 3/10/2018 7:29:00 PM Received Date: 3/10/2018 7:29:07 PM From: Chowdhury, Prosanta Created By: Prosanta.Chowdhury@nrc.gov Recipients:

"Lee, Samuel" <Samuel.Lee@nrc.gov>

Tracking Status: None "Cranston, Gregory" <Gregory.Cranston@nrc.gov>

Tracking Status: None "Murray, Demetrius" <Demetrius.Murray@nrc.gov>

Tracking Status: None "Rivera-Varona, Aida" <Aida.Rivera-Varona@nrc.gov>

Tracking Status: None "NuScaleDCRaisPEm Resource" <NuScaleDCRaisPEm.Resource@nrc.gov>

Tracking Status: None Post Office: BN7PR09MB2609.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 556 3/10/2018 7:29:07 PM Request for Additional Information No. 382 (eRAI No. 9402).pdf 73522 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Request for Additional Information No. 382 (eRAI No. 9402)

Issue Date: 03/10/2018 Application

Title:

NuScale Standard Design Certification 048 Operating Company: NuScale Power, LLC Docket No.52-048 Review Section: 18 - Human Factors Engineering Application Section:

QUESTIONS 18-20 Title 10 of the Code of Federal Regulations (10 CFR) Section 52.47(a)(8) requires an applicant for a design certification to provide a final safety analysis report (FSAR) that must include the information necessary to demonstrate compliance with any technically relevant portions of the Three Mile Island requirements set forth in 10 CFR 50.34(f), except paragraphs (f)(1)(xii),

(f)(2)(ix), and (f)(3)(v). Section 10 CFR 50.34(f)(2)(iii) requires an applicant to "Provide, for Commission review, a control room design that reflects state-of-the-art human factor principles prior to committing to fabrication or revision of fabricated control room panels and layouts. Chapter 18, Human Factors Engineering, of NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition, and NUREG-0711, "Human Factors Engineering Program Review Model, identify criteria the staff uses to evaluate whether an applicant meets the regulation. The FSAR, Tier 2, Section 18.0, "Human Factors Engineering - Overview," indicates that the HFE program incorporates the applicable guidance provided in NUREG-0711, Revision 3.

Chapter 18, Human Factors Engineering, of NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition, lists NUREG-0711, "Human Factors Engineering Program Review Model, and NUREG-0700, Human-System Interface Design Review Guidelines, as the sources of acceptance criteria the staff uses to evaluate whether an applicant meets the regulation.

NUREG-0711, Section 8.4.4.6(1), states that, The applicant should describe the basis for deciding which HSIs will be included in the MCR design, and which will be provided locally.

The staff reviewed the application and could not find where NuScale addressed this criterion. Describe the basis NuScale used for deciding which HSIs to include in the MCR and which to provide locally or why this criterion does not apply to the NuScale design.