Notice of Violation from Insp on 980706-24.Violation Noted: Testing Program Not Developed Until 971201,after 44 of 72 Molded Case Circuit Breakers Failed to Trip During Testing
ML18068A428
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/02/1998
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML18068A427 List:
References
50-255-98-12, NUDOCS 9809090207
Download: ML18068A428 (1)


Text

NOTICE OF VIOLATION Consumers Energy Company Palisades Nuclear Generating. Plant Docket No. 50-255 License No. DPR-20 During an NRC inspection conducted from July 6 through July 24, 1998, one violation of NRC requirements was identified. In accordance with the "General Statement of Policy and Procedure for NRC EnforcementActions," NUREG-1600, the violation is listed below:

Title 10 of the Code of Federal Regulations, Part 50, Appendix B, Criterion XVI, "Corrective Action," requires, in part, that measures shall be established to assure that conditions adverse to quality are promptly identified and corrected.

Contrary to the above, although the licensee had identified the need for testing molded case circuit breakers on April 28, 1993, and was aware of the failure history of molded case breaker through reviews of industry operating experience information, a testing program was not developed until December 1, 1997, after 44 of 72 molded case circuit breakers failed to trip during testing.

This is a Severity Level IV violation (Supplement I). (50-255/98012-01 (DRS)).

The NRC has concluded that information regarding the reason for the violation, the corrective actions taken and planned to correct the violation and prevent recurrence and the date when full compliance was achieved is already adequately addressed on the docket in LER 96-013 and Inspection Report No. 50-255/94002. However, you are required to submit a written statement or explanation pursuant to 10 CFR 2.201 if the description therein does not accurately reflect your corrective actions or your position. In that case, or if you choose to respond, clearly mark your response as a "Reply to a Notice of Violation," and send it to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.c: 20555 with a copy to the

.Regional Administrator, Region Ill, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice. of Violation (Notice).

If you contest this enforcement action,. you should also provide a copy of your response to the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001.

If you choose to respond, your response will be placed in the NRC Public Document Room (PDR), to the extent possible, it should not include any personal privacy, proprietary, or

  • safeguards information so that it can be placed in the PDR without redaction. If personal privacy or proprietary information is necessary to provide an acceptable response, then please provide a bracketed copy of your response that identifies the information that should be protected and a redacted copy of your response that deletes such information. If you request withholding of such material, you must specifically identify the portions of your response that you seek to have withheld and provide in detail the bases for your claim of withholding (e.g.,

explain why the disclosure of information will create an unwarranted invasion of personal privacy or provide the information required by 10 CFR 2. 790(b) to support a request for withholding confidential commercial or financial information). If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.

9809090207 980902 PDR ADOCK 05000255 G