Forwards Insp Rept 50-255/97-09 on 970708-0827.No Violations Noted.Licensee Performed Prompt & Thorough Reviews of Several Operational Issues,Including Increase in Main Turbine Vibration & Repetive Failures of Thermal Monitor
ML18067A725
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/14/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Thomas J. Palmisano
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18067A726 List:
References
50-255-97-09, 50-255-97-9, NUDOCS 9710280049
Download: ML18067A725 (4)


See also: IR 05000255/1997009

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION Ill

Mr. Thomas J. Palmisano

Site Vice President

Palisades Nuclear Generating Plant

27780 Blue Star Memorial Highway

Covert, Ml 49043-9530

801 WARRENVILLE ROAD

LISLE. ILLINOIS 60532-4.351

October 14, 1997

SUBJECT:

NRC INSPECTION REPORT NO. 50-255/97009(DRP)

Dear Mr. Palmisano:

On August 27, 1997, the NRC completed an inspection at your Palisades Nuclear Generating

Plant. The enclosed report presents the results of that inspection.

The inspection covered a 7-week period. Areas examined during the inspection are identified in

the report. Within these areas, the inspection consisted of a selective examination of procedures

and representative records, inte.rviews with personnel, and observation of activities in progress ..

The purpose of the inspection effort was to determine whether activities authorized by the license

were conducted safely and in accordance with NRC requirements. The summary contained in

the report provides an overview of our assessment of your performance.

During this inspection period the licensee performed prompt and thorough reviews of several

operational issues, including an increase in main turbine vibration, repetitive failures of the

thermal margin monitor, and the availability of emergency diesel generator lube oil. However,

resident inspector review of these issues revealed additional opportunities for early discovery and

resolution by existing licensee programs. In contrast, system engineering has demonstrated that

it can proactively identify problems by performing a critical review of system performance. An

example. is the review performed by the system engineer of the high pressure safety injection

system and high pressure air system. This review identified several component failures that

were not classified as maintenance preventable functional failures but required increased

attention due to the frequency of the component failures.

In accordance with 1 O CFR 2. 790 of the NRC's "Rules of Practice," a copy of this letter, and the

enclosed inspection report, will be placed in the NRC Public Document Room (PDR).

9710280049 971014

PDR

ADOCK 05000255

G

PDR

Docket No. 50-255

License No. DPR-20

Sincere!y,

Geoffrey E. Grant, Director

Division of Reactor Projects

Enclosure: Inspection Report No. 50-255/97009(DRP)

See Attached Distribution

I llllll lllll lllll lllll lllll lllll llll llll

'*117514*

1.- **-*-

T. Palmisano

Distribution:

cc w/encl:

Robert A. Fenech, Senior Vice

President, Nuclear, Fossil

and Hydro Operations

Thomas C. Bordine, Manager

Licensing Department

James R. Padgett, Michigan

Public Service Commission

Michigan Department of

Environmental Quality

-2-

Department of Attorney General (Ml)

Mr. Thomas J. Palmisano

Site Vice President

Palisades Nuclear Generating Plant

27780 Blue Star Memorial Highway

Covert, Ml 49043-9530

October 14, 1997

SUBJECT:

NRC INSPECTION REPORT NO. 50-255/97009(DRP)

Dear Mr. Palmisano:

On August 27, 1997, the NRC completed an inspection at your Palisades Nuclear Generating

Plant. The enclosed report presents the results of that inspection.

The inspection covered a 7-week period. Areas examined during the inspection are identified in

the report. Within these areas, the inspection consisted of a selective examination of procedures

and representative records, interviews with personnel, and observation of activities in progress.

The purpose of the inspection effort was to determine whether activities authorized by the license

were conducted safely and in accordance with NRC requirements. The summary contained in

  • the report provides an overview of our assessment of your performance.

During this inspection period the licensee performed prompt and thorough reviews of several

operational issues, including an increase in main turbine vibration, repetitive failures of the

thermal margin monitor, and the availability of emergency diesel generator lube oil. However,

resident inspector review of these issues revealed additional opportunities for early discovery and

resolution by existing licensee programs. In contrast, system engineering has demonstrated that

it can proactively identify problems by performing a critical review of system performance. An

example is the review performed by the system engineer of the high pressure safety injection

system and high pressure air system. This review identified several component failures that

were not classified as maintenance preventable functional failures but required increased

attention due to the frequency of the. component failures.

In accordance with 10 CFR 2.790 of the NRC's ... Rules of Practice," a copy of this letter, and the

enclosed inspection report, will be placed in the NRC Public Document Room (PDR).

Docket No. 50-255

License No. DPR-20

Sincerely,

/s/Marc L. Dapas for

Geoffrey E. Grant, Director

Division of Reactor Projects

Enclosure: Inspection Repo~ No. 50-255/97009(DRP)

See Attached Distribution

DOCUMEN::r-NAME:-R:-lnsprpts\\powers\\pali\\pal97009.drp

To receive a copy of this document, indicate in the box "C" = Copy without attachmenUenclosure

"E" = Co

with attachment/enclosure "N" = No co

OFFICE

Rill

Riii

Riii

Rill

NAME

DATE

10~'()97

10V~97

OFFICIAL RECORD COPY

T. Palmisano

Distribution:

cc w/encl:

Robert A. Fenech, Senior Vice

President, Nuclear, Fossil

and Hydro Operations

Thomas C. Bordine, Manager

Licensing Department

James R. Padgett, Michigan

Public Service Commission

Michigan Department of

Environmental Quality

-2-

  • Department of Attorney Generai (Ml)

Docket File w/encl

DRP w/encl

Project Manager, NRR w/encl

Riii Enf. Coordinator w/encl

CAA 1 w/encl (E-mail)

DRS (2) w/encl

TSS w/encl

PUBLIC IE-01 w/encl

OC/LFDCB w/encl

SRI Palisades w/encl

A. B. Beach w/encl

Deputy RA w/encl

Riii PRR w/encl

DOCDESK (E-mail)

!

I

I

I

-t~

!

i

I

j

,I

I

'