ML18065A704
| ML18065A704 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 04/30/1996 |
| From: | Kobiata K, Anthony Williams CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9605080082 | |
| Download: ML18065A704 (5) | |
Text
'\\..*
.. r.*
(
I consumers
.*Power POWERINli MICHlliAN"S. PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043
- May 2, 1996 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy.of the Monthly Operating Data and Summary' of Operating Experience for the Palisades Nuclear Plant for the month of April 1996.
If you have any questions or concerns, please feel free to contact me at (616) 764-2113.
Sincerely,
()Jb,.f_ d-A L Williams.
ReaCtor Eogineering Supervisor CC: RA Vincent, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, Ml
. BWJorgensen, Michigan Dept of Labor, Lansing, Ml Jf>adgett, Michigan Public Service Commission Records Center, INPO, Atlanta. GA CWMain, Palisades SMMclntyre, P13-121 Region Ill Administrator, USNRC Document Control, 950*22*35*10/L Cycle 12 Reports 9605080082 960430 PDR ADOCK 05000255 R
PDR l
A CMS' ENERGY COMPANY
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 05/02/96 COMPLETED BY KAKobiata MONTH April TELEPHONE (616)764-2572 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
/
(MWe Net)
(MWe Net)
- 1.
781
- 17.
779
- 2.
779.
18:*.
770
- 3.
777
- 19.
771
- 4.
780
- 20.
772
- 5.
781
- 21.
777
- 6.
781
- 22.
775
- 7.
781
- 23.
777
- 8.
781
- 24.
776
- 9.
779
- 25.
771
- 10.
780
- 26.
776
- 11.
774
- 27.
779
- 12.
774
- 28.
778
- 13.
779
- 29.
776
- 14.
780
- 30.
778
- 15.
778
- 31.
- 16.
779 INSTRUCTIONS:
- On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.
Compute to the nearest whole megawatt.
SUMMARY
OF OPERATING EXPERIENCE FOR APRIL 1996 The Unit operated at -~I 00 percent power for the entire hlonth. -
OPERATING STATUS:
- l.
UNIT NAME
- 2.
REPORTING PERIOD:
- 3.
LICENSED THERMAL POWER (MWt)
- 4.
NAMEPLATE RATING (GROSS MWe)
- 5.
DESIGN ELECTRICAL RATING (NET MWe)
- 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)
- 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWe)
OPERATING DATA REPORT Palisades 960401-960430 2530 811. 7 805
- 770
- 730
- 8.
IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH ?AND 7) SINCE LAST REPORT, GIVE REASONS:
- 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
- 11. HOURS IN REPORTING PERIOD
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-LINE
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERGY GENERATED (Milll)
- 17. GROSS ELECTRICAL ENERGY GENERATED {MWH)
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
- 19. 'UNIT SERVICE FACTOR
- 20. UNIT AVAILABILITY FACTOR
- 21. UNIT CAPACITY FACTOR (USING MDC NET)
- 22. UNIT CAPACITY FACTOR (USING DER NET)
- 23. UNIT FORCED OUTAGE RATE This Month 719.0 z19.o 719.0 1811246. 3 586960 558917 100.0\\'
100.0\\'
10'6. 5\\'
96.6\\'
- 0. O!f
- 24. -SHUTDOWNS SCHEDULED OVER THE NEXT 6 IUlN'raS !TYPE, DATE AND DURATION OF EACH):
A 51 day refueling outage is scheduled to begin on November 2, 1996.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on condenser backpressure
- Weighted Average ( 635 MWe used as MDC Net* prior to Oc.tober 1985)
Yr-to-Date 2903.0 2582.3 2573.6 6379991. 8 2067074 1967284 88.7\\'
88.7\\'
92.8\\'
84.2\\'
11.3\\'
Forecast DOCKET NO 50-25~
DATE 04-02-96.
COMPLETED BY KAKobiata TELEPHONE (616)764-891 NOTES:
Cumulative 213590.0 123533.6 118728. 3 260498682.3 82543328 77920703 55.6\\'
55.6\\'
- 53. 7\\'*
45.3\\
28.4\\'
Achieved
REPORT MONTH APRIL 1996 No.
Date NONE
- 1. '
F: Forced S: Scheduled Type1
- 2.
Reason Duration (Hours)
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS Reason2 Method of Licensee Shutting Event
- Down Reactor Report#
- 3.
4..
Method:
Exhibit G - Instructions 1-Manual fur Preparation of Data 2-Manual Scram Entry Sheets for Licensee 3-Automatic Scram Event Report (LER) File 4-0ther (Explain)
- 5.
System Code' Component Code5 Exhibit I - Same Source it DOCKET NO 50-255 UNIT Palisades DA TE 05/02196 COMPLETED BY KAKobiata TELEPHONE 616-764-2572 Cause & Corrective Action to Prevent Recurrence