I ,

consumers

.Power POWERiNii MICHlliAN"S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 March 3, 1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed isa copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of February, 1995.

If you have any questions or concerns, please feel free to contact me at (616) 764-8913, exten~ion 0113.

c Sincerely,*

~.£~

A L Wi 11 i ams Reactor Engineer CC: RAVi ncent, Pali sades Senior Resident Inspector, Palisades DRHahn, -o;v df Rad ~ealth ~ervices, Lansing, MI_

  • awJorgensen-, Michigan Dept of Labor, Lansing, Ml JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA GMKatt, Palisades
  • SMMcintyre, Pl3-121 Region III Administrator, USNRC Do~ument Lontrol; 950*22*35*10/L Cycle 11 Reports

~ .:: ~ r . ~~ _...: . ,.

9503100393 950228 ,'

I PDR 'ADOCK 05000255

  • t R . . PDR  !-*

A CMS' ENERGY COMPANY

OPERATING DATA REPORT DOCKET NO 50*255 DATE 03-03*95 COMPLETED BY BWBerles TELEPHONE (616)764-89i3 OPERATING STATUS:

NOTES:

1. UNIT NAME Palisades
2. REPORTING PERIOD: 95D201-950228
3. LICENSED THERMAL POWER (MWt) 2530. 0
4. NAMEPLATE RATING (GROSS MWe) 811.7
5. DESIGN ELECTRICAL RATING (NET MWe) 805.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) **770
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730
8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3. THROUGH 7AND 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY CNET MWe):
10. REASONS FOR RESTRICTIONS, IF ANY:

This Month Yr* to-Date Cumulative

11. HOURS IN REPORTING PERIOD 672.0 1416.0 203343.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1416.0 115728.0
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE 672.0 1416.0 111078. 1
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED CMWH) 1655688.0 3529992.0 241820643.0
17. GROSS ELECTRICAL ENERGY GENERATED CMWH) 541870.0 1154990.0 76519781.0
18. NET ELECTRICAL ENERGY GENERATED CMWH) 515599.0 1099451.0 72196012.0
19. UNIT SERVICE FACTOR 100.0X 100.0X 54.6%
20. UNIT AVAILABILITY FACTOR 100.0X . 100.0% 54.6%
21. UNIT CAPACITY FACTOR (USING MDC NET) 105. 1X 106.4% .52. 5%*
22. UNIT CAPACITY FACTOR (USING DER NET) 95.3X 96.5% 44. 1%
23. UNIT FORCED OUTAGE *RATE o.ox 0.0% 29. 5%
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE.- DATE AND DURATION OF EACH):

Refueling, 5/28/95, 100 Days

25. IF SHUTDOWN AT END OF REPoRT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS..IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser baclcpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 03/03/95 COMPLETED BY BWBerles MONTH ---'F-=e=b"'""'ru=a:..:..r..._y_ TELEPHONE (616)764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net)

1. 785 17. 782
2. 786 18. 784
3. 786 19. 784
4. 784 20. 784
5. 785 21. 787
6. 784 22. 785
7. 781 23. 787
8. 789 24. 787
9. 784 25. 787 JO. 788 26. 789
11. 745 27. 787
12. 364 28. 789
13. 730 29.
14. 787 30.
15. 787 31.
16. 787 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the repqrting month. Compute to the nearest whole megawatt.

J

SUMMARY

OF OPERATING EXPERIENCE FOR FEBRUARY 1995 The unit began the month at full power. On 2/11/95 at 2140 hours0.0248 days <br />0.594 hours <br />0.00354 weeks <br />8.1427e-4 months <br />, Cooling Tower Pump P-39A tripped and an emergency power reduction was initiated.

Reactor power was stabilized at 48%, and on 2/12/95 at 1715 hours0.0198 days <br />0.476 hours <br />0.00284 weeks <br />6.525575e-4 months <br /> power escallation was commenced. The unit was returned to full power by 2/14/95 at 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />.

I .

DOCKET NO 50-255 UNIT Palisades DATE 03/oQ3/95 COMPLETED BY ----'B""'W=B=er:....l:..::e~s REPORT MONTH ---'-F-=E=BR"'"'U~A'-'-RY'--"1=99""'5~-- TELEPHONE (616)764-8~13 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type 1 Duration Reason 2 Method of Licensee System Component Cause &Corrective (Hours) Shutting Event Code 4 Code 5 Action to 3

Down Reactor Report # Prevent Recurrence 2/11/95 F 50 A Cooling tower pump trip forced power reduction to 48% power

1. 2. 3. 4. 5.

F: Forced Reason: Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data 8-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refue 1i ng 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-0ther (Explain) (NUREG-0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other. (Explain)