ML18064A605

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1995 for Palisades Nuclear Plant
ML18064A605
Person / Time
Site: Palisades 
Issue date: 01/31/1995
From: Berles B, Anthony Williams
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9502100174
Download: ML18064A605 (5)


Text

consumers Power POW ERi Nii MICHlliAN'S PROliRESS Palisades Nuclear Plant: 27780 Slue Star Memorial Highway. -Covert, Ml 49043 February 2, 1995 US Nuclear Regulatory Commission Document-Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisade~ Nuclear Plant for the month of January, 1995.

If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.

Sincerely, m~

4 4ltJ A L Wi 11 i ams Reactor Engineer CC:

RAVincent, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI BWJorgensen, Michigan D~pt of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA GMKatt, Palisades SMMclntyre, P13-121 Region III Administrator, USNRC Document Control, 950*22*35*10/L Cycle 11 Reports 9502100174 950131 PDR ADOCK 05000255.

-----~-~~~~~~~PDR '

A CMS' ENERGY COMPANY lor1r_* 1fA*,

  • (

OPERATING STATUS:

1.

UNIT NAME

2.

REPORTING. PERICO:

. 3.

LICENSED THERMAL.POWER (MWt)

4.

NAMEPLATE RATING (GROSS MWe)

5.

DESIGN ELECTRICAL RATING CNET MWe)

OPERATING DATA REPORT Palisades 950101-950131.

2530.0 811. 7 805.0.

6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)

    • 770 7..

MAXIMUM.DEPENDABLE CAPACITY (NET MWe)

    • 730 DOCKET NO DATE 50--255 02-02-95 COMPLETED 'BY, BWBerles TELEPHONE (616)764-8913, NOTES:
8.

IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH ?AND 7) SINCE LAST REF'ORT, GIVE REASONS:

9.

POW~R LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

. 10. REASONS FOR RESTRICTIONS, IF ANY:

11. HOURS IN REPORli NG PER !OD
12. NUMBER OF HOURS REACTOR WAS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE
  • 15. UNIT RESERVE, SHUTDOWN HOURS 16.. GROSS THERMAL ENERGY GENERATED (MWH)
17. GROSS.ELECTRICAL ENERGY GENERATED (MWH)
18. NET ELECTRICAL ENERGY GENERATED CMWH)
19. UNIT SERVICE FACTOR
20. UNIT.AVAILABILITY FACTOR 2f: UNIT.CAPACITY FACTOR (USING MOC NET)
22. UNIT CAPACITY FACTOR (USING DER NET)
23. UNIT FORCED OUTAGE,RATE -*

This.Month 744.0 744.0

. 744.0

. 1874304.0 613120.0 583852.0 100.0%

1o.o.0%

107.5%

97.5%

0.0%

24. SHUTDOWNS SCHEDULEo:**oVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

~: *--*. -

Refueling, 5/20/95,.100 Days

25. IF SHUTDOWN AT END O.F REPORT PER I OD, EST I MA TED DA.TE OF STARTUP:

.26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

I NI.T !AL CRITICALITY INITIAL ELECTRICITY

  • COMMERCIAL OPERATION
    • Based on.condenser backp.ressure
    • weighted Average (635 MWe used as MDC Net prior to October 1985)

Yr-to-Date 744.0 744.0 744.0.

1874304.0 613120.0 583852.0 100.0%.*

J00.0% -

107.5%

97.5%

0.0%

Forecast cumurative 202671.0.*

115056.0 110406.1.

240164955.0 759779i 1. 0..

71680413.0,

54.5%.

-- 54.5%

_52.4%*

.43:9%

29.7%

Achieved

.AVERAGE DAILY UNIT POWER LEVEL

. MONTH --~J~a~nu~a~r_y_

DAY AVERAGE DAILY POWER LEVEL DAY (MWe Net)

1.

783

17.
2.

787

. 18.

3.

785

19.

4.

787

20.

. 5.

789

21.
6.

783

22.
7.

785

23.
8.

786

24.
9.

786

25.
10.

786

26.
11.

783

27.
12.

781

28.
13.

783.

29.
14.

782

30.
15.

785

31.
16.

786 INSTRUCTIONS:

DOCKET NO 50-255 UNIT Palisades DATE 02/02/95 COMPLETED BY BWBerles TELEPHONE (616)764-8913 AVERAGE DAILY POWER LEVEL (MWe Net) 784 785 783 776 785 783 785.

788 790 783 788 791 784 787 782 On this form~t, list the average daily unit power level in MWe-NET for each day tn the reporting month.

Compute t6 the nearest whole megawatt.

. J

SUMMARY

OF OPERATING EXPERIENCE FOR JANUARY 1995 The unit ran at full power for the entire month of January.

REPORT MONTH __

_,J""A"'"NU=A=R..:..Y-=1=9=-9 5=----

No.

Date Type 1 none

1.

F:

Forced S:

Scheduled Duration (Hours)

2.

Reason:

A-Equipment Failure.(Explain)

B-Maintenance or Test C-Refueling

.a-Regulatory Restriction E-Operat6r Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS Method of

. Licensee Shutting Event Down Reactor3 Report #

3.

Method:

1-Mamia l 2-Manua l Scram.

3-Automatic.Scram 4-0ther (Explain)

4.

System Code 4

Component Code5 Exhibit G - *Instructions for Preparation of Data Entry Sheets for.Licensee Event Report (LER) File (NUREG-0161)

Cause & Corrective

  • Action to Prevent Recurrence
5.

DOCKET NO 50-255 UNIT Palisades DATE 02/02/95 COMPLETED BY --~BW~B=e~r~le=s TELEPHONE (616)764-8913 Exhibit I - Same Source

,_.