ML18064A521

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Nov 1994 for Palisades Nuclear Plant
ML18064A521
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/30/1994
From: Berles B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18064A520 List:
References
NUDOCS 9412280218
Download: ML18064A521 (4)


Text

OPERATING STATUS:

1.

UNIT NAME

2.

REPORTING PERIOD:

3.

LICENSED THERMAL POWER CMWt)

4.

NAMEPLATE RATING (GROSS MWe)

5.

DESIGN ELECTRICAL RATING (NET MWe)

6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)

7.

MAXIMUM DEPENDABLE CAPACITY (NET MWe)

OPERATING DATA REPORT Palisades 941101-941130 2530.0 811. 7 805;0

    • no
    • 730
8.

IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, iF ANY CNET*MWe):

10. REASONS FOR RESTRICTIONS, IF ANY:
11. HOURS IN RE~ORTING PERIOD.
12. NUMBER OF HOURS REACTOR WAS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE
15. UNIT RESERVE'SHUTDOWN HOURS 16, GROSS THERMAL ENERGY GENERATED CMWH)

.17. GROSS ELECTRICAL ENERGY GENERATED CMWH)

18. NET ELECTRICAL ENERGY GENERATED CMWH)
19. UNIT SERVICE FACTOR
20. UNIT AVAILABILITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET)

This Month Yr-to-Date 720.0 8016.0 720.0 5128.0 720.0 5116.5 1813872.0 12760464.0 592240.0 4135080.0 563596.0 3932092.0 100.0%

63.8%

100.0%

63.8%

107.2%

67.2%

DOCKET NO 50-255 DATE 12-02-94 COMPLETED BY.

BWBerles TELEPHONE (616)764-8913 NOTES:

Cumulative 201183.0 113568. 0 108918. 1 236423283.0.

74753583.0 70514827.0

.54.1%

54. 1%

52.0%*

22. UNIT CAPACITY FACTOR (USING DER N:OT) 97.2%

60.9%""

43.5%

23. UNIT FORCED OUTAGE RATE
24. SHUTDOWNS -SCHEDULED OVER THE NEXT 6 MONTHS CTYPE, DATE AND DURATION OF 25.* IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

. INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • We(i ah.ted_~verage (635 MWe ~sect 'as MOC Net prior to October

. 9412280218 94120'7

°")

I PDR ADDCK 0500Q255 i

R PDR 1985) 0.0%

'36.2%

29.9%

EACH):

Forecast Achieved

AVERAGE DAILY UNIT POWER LEVEL MONTH --~N=o~ve=m=b=er'---

DAY AVERAGE DAILY POWER LEVEL DAY

{MWe Net)

1.

781

. 17.

2.

783

18.
3.

716

19.
4.

776

20.
5.

'778

21.
6.

779

22.
7.

783

23.
8.

780 24..

9.

. 783.

25.
10.

784

26.

.. 11.

786

27.
12.

783

28.
13.

777

29.
14.

779

30.
15.

788

31.
16.

782 INSTRUCTIONS:

DOCKET NO.

50-255 UNIT Palisades DATE 12/07/94 COMPLETED BY BWBerles TELEPHONE (616)764-8913 AVERAGE DAILY POWER LEVEL

{MWe Net).

781 780 785 784 780 786 783 786 787 788 786 787 785 788 On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole megawatt.

SUMMARY

OF OPERATING EXPERIENCE FOR NOVEMBER 1994 The unit ran at full power for the entire month of November.

RE PORT MONTH --'--~N.::...OV:...:E"""MB=E=R__,1=9=94-'-----

No.

Date None

1.

F:

Forced S:

Scheduled Type1 Duration (Hours)

2.

Reason:

Rea~on 2

A-Equipment. Failure (Explain)

  • B-Ma i.ntenance or lest C-Refue ling*

D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explai~)

H-Other (Explain)

UNIT ~HUTOOWNS ANO POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor 3

Report #

3.

Method:

.1-Manua l 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)

'System Compc;inent Code4 Coae5

4.

. Exhibi.t G - Instructions for Preparation of Data Entry Sheets for Licensee

£vent Report (LER) File (NUREG-0161)

  • ~.

Cause & Corrective Action to Prevent Recurrence

5.

)I DOCKET NO 50-255 UNIT Palisades DATE 12/07/94,

COMPLETED BY

..,.--..,.."-'~W~B~e~r~le=s TELEPHONE (616)764-8913 Exhibit I - Same Source