ML18064A496
| ML18064A496 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 11/30/1994 |
| From: | Berles B, Anthony Williams CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9412120197 | |
| Download: ML18064A496 (5) | |
Text
consumers Power POW ERi Nii MICHlliAN"S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043 December 5, 1994 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of November, 1994.
If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.
Sincerely,
~t<W-A L Wi 11 i ams Reactor Engineer CC:
RAFenech, Palisades JMartin, USNRC RAVincent, Palisades Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPad'gett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA JDStafford, Palisades SMMcintyre, Pl3-121 Region III Administrator, USNRC Document Control, 950*22*35*10/L Cyc.l e 11 Reports 120141 9412120197 941130 PDR ADOCK 05000255.
OPERATING STATUS:
- 1.
UNIT NAME
- 2.
REPORTING PERIOD:
- 3.
LICENSED THERMAL POWER (MWt)
- 4.
NAMEPLATE RATING (GROSS MWe)
- 5.
DESIGN ELECTRICAL RATING (NET MWe)
- 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)
OPERATING DATA REPORT Palisades
- 941101-941130 2530.0 811.7 805.0
- no
- 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWe)
- 730 DOCKET NO 50-255 DATE 12-02-94 COMPLETED BY BWBerles TELEPHONE (616)764-8913 NOTES:
- 8.
IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3, THROUGH 7AND 7) SINCE LAST REPORT, GIVE REASONS:
- 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
- 11. HOURS IN REPORTING PERIOD
- 13. REACTOR RESERVE SHUTDOWN HOURS
. 14. HOURS GENERATOR ON-LINE
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERGY GE~ERATED (MWH)
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
- 18. NET ELECTRICAL ENERGY GENERATED. (MWH)
- 19. UNIT SERVICE FACTOR 20.. UNIT AVAILABILITY FACTOR
- 21. UN!T CAPACITY FACTOR (USING MDC NET)
- 22. UNIT CAPACITY FACTOR (USING DER NET)
- 23. UNIT FORCED OUTAGE RATE This Month no:o 720.0 720.0 1813872.0 592245.0 563601.0 100.0%
100.0%
107.2%
97.2%
0,0%
- 24. SHUTDOWNS SCHEDULED* OV~R THE NEXT 6 MONTHS :TYPE, DATE AND DURATION OF EACH):.
- 25. IF SHUTDOWN AT END.OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS.IN.TEST. STATUS (PRIOR TO COMMERCIAL.OPERATION):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on condenser backpressure
- Weighted Average (635 MWe used as MDC Net prior to October 1985)
Yr-to-Date 8016.0 5128.0 5116.5 12760464.0 4135085.0 3932097.0 63.8%
63.8%
67.2%
60.9%
. 36~2%
Forecast *
- *curulative*
201183.0 113568.0 108918. 1 236423283.0 74753588.0 70514832.0 54.1%
54.1%
52.0%*
43.5%
29.9%
Achieved i
AVERAGE DAILY UNIT POWER LEVEL MONTH --~N~o~ve=m=b~er~
DAY AVERAGE DAILY POWER LEVEL DAY (MWe Net)
- 1.
781
- 17.
- 2.
783
- 18.
- 3.
776
- 19.
- 4.
776
- 20.
- 5.
778
- 21.
- 6.
779
- 22.
- 7.
783 23...
- 8.
- 780
- 24.
- 9.
783
- 25.
- 10.
784
- 26.
- 11.
786
- 27.
- 12.
783
- 28.
- 13.
777.
~
- 29.
- 14.
779
- 30.
- 15.
788
- 31.
- 16.
783 INSTRUCTIONS:
DOCKET NO 50-255 UNIT Palisades DATE 12/05/94 COMPLETED BY BWBerles TELEPHONE (616)764-8913 AVERAGE DAILY POWER LEVEL (MWe Net) 781 780 785 784 780 786 783 786 787 788 786 787 785 788 On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.
Compute to the nearest whole megawatt.
r" :* ~*
. 'J
. ~
SUMMARY
OF OPERATING EXPERIENCE FOR NOVEMBER 1994 The unit ran at full power for the entire month of November.
REPORT MONTH ---"N-=-OV=E"""MB=E=R-'1=9-=-94-'----
No.
Date Type 1 None
- 1.
F:
Forced S:
Scheduled Ii ;
~
Duration (Hours)
- 2.
Reason:
Reason2 A-Equipment Failure (Explain)
B-Maintenance or Test C-Refue 1 i ng D-Regulatory.Restriction
- E-Operator Trainin~ & Licehse Examination F-Administrative G-Operational Error (Explain)
H-Other (Ex~lain)
UNIT SHUTDOWNS ANO.POWER REDUCTIONS Method-. of Shutting Down Reactor3
- 3.
Method:
1-Manual Licensee Event Report l 2-Manual Scram 3-Automatic Scram.
4-0ther (Explain)'
- 4.
System Code4 Component' Code5 Exhibit G ~ Instructions for Preparation of Data '
Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Cause & Corrective Action to Prevent Recurrence
- 5.
DOCKET NO 50-255 UN IT Pa 1 i sades DATE 12/05/94 COMPLETED BY --=BW~B~e~r~le=s TELEPHONE (616)764-8913 Exhibit I~ Same Source.