Monthly Operating Rept for Oct 1994 for Palisades Nuclear Plant
ML18064A459
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/31/1994
From: Berles B, Anthony Williams
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9411100208
Download: ML18064A459 (5)


Text

...... *--;""'

, I

\\

consumers Power PDWERINli MICHlliAN'S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043 November ~' 1994 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of October, 1994.

If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.

  • sincerely,

. ~

  • _,/_.1i1JJk A L Wi 11 i ams Reactor Engineer*

CC:

RAFenech, Palisades JMartin, USNRC RAVincent, Palisades

_Reside.nt lns_pecto_r, Palis_ade$ _

DRHahn, Div-of Rad Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades JDStafford, Palisades SMMclntyre, Pl3-121 Region.III Ad~inistrator, USNRC Document Control, 950*22*35*10/L Cycle 11 Reports 100039 9411100208'941031.

P. DR ADOCK 05000255 PDR R

L 1 A CMS' ENERGY COMPANY

~*,

OPERATING STATUS~

1.

UNIT NAME

2.

REPORTING PERIOD:

3.

LICENSED THERMAL POWER (MWt)

4.

NAMEPLATE RATING (GROSS MWe)

5.

DESIGN ELECTRICAL RATING (NET MWe)

6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)

OPERATING DATA REPORT Palisades 941001-941031 2530.0 811. 7 805.0

    • 770
7.

MAXIMUM DEPENDABLE CAPACITY (NET MWe)

    • 730
8.

IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH ?AND 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

10. REASONS FOR RESTRICTIONS, IF ANY:
11. HOURS IN REPORTING PERIOD
12. NUMBER OF HOURS REACTOR WAS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENE~GY GENERATED CMWH)
17. GROSS ELECTRICAL ENERGY GENERATED CMWH)
18. NET ELECTRICAL ENERGY GENERATED CMWH)
19. UNIT SERVICE FACTOR
20. UNIT AVAILABILITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET)
22. UNIT CAPACITY FACTOR (USING DER NET)
23. UNIT FORCED OUTAGE RATE This Month 745.0 745.0 745.0 1869960.0 608660.0 579188.0 100.0%

100.0%

106.5%

96.6%

0.0%

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

Yr-to-Date 7296.0 4408.0 4396.5 10946592.0 3542840.0 3368496.0 60.3%

60.3%

63.2%

57.4%

39. ?"-'

Forecast DOCKET NO DATE 50-255 11-02-94 COMPLETED BY BWBerles TELEPHONE (616)764-8913 NOTES:

Cumulative 200463.0 112848.0 108198. 1 234609411.0 74161343. 0 69951231. 0 54.0%

54.0%

51.8%*

43.3%

30. 1%

Achieved

AVERAGE DAILY UNIT POWER LEVEL MONTH ___

0::....:c=-=t=o=be=r-DAY AVERAGE DAILY POWER LEVEL DAY (MWe Net)

1.

774

17.
2.

780

18.

3..

779

19.
4.

783

20.
5.

775

21.
6.

774

22.
7.

772

23.
8.

769

24.
9.

775

25.
10.

780

26.
11.

777

27.
12.

778

28.
13.

776

29.
14.

775

30.
15.

777

31.
16.

772 INSTRUCTIONS:

DOCKET NO 50-255 UNIT Palisades DATE 11/03/94 COMPLETED BY BWBerles TELEPHONE (616)764-8913 AVERAGE DAILY POWER LEVEL (MWe Net) 773 771 773 779 780 780 778 782 783 782 782 781 778 782 782 On this format, list the average daily unit power level in MWe-NET for each day in the reporting*month.

Compute to the nearest whole megawatt.

SUMMARY

OF OPERATING EXPERIENCE FOR SEPTEMBER 1994 The unit ran at 99% power while saturation of a demineralizer was completed.

On October 19, saturation was completed and the unit brought back to full power.

RE PORT MONTH ---=O-=-CT.:....:O=B=ER'"'"-"1-=-99=--4'----

No.

Date Type 1 None

1.

F:

Forced S:

Scheduled Duration Reason 2 (Hours)

2.

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refue ling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Shutting Down Reactor3

3.

Method:

I-Manual Licensee Event Report #

2-Manual Scram 3-Automatic Scram 4-0ther (Explain)

4.

System Code 4

Component Code 5

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Cause & Corrective Action to Prevent 1Recurrence

5.

DOCKET NO UNIT DATE COMPLETED BY TELEPHONE Exhibit I - Same Source 50-255 *~.

Palisades' 11/03/,94,,

BWBerles *

(616)764-8913