Monthly Operating Rept for Sept 1994 for Palisades Nuclear Plant
ML18064A405
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/30/1994
From: Berles B, Anthony Williams
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9410110122
Download: ML18064A405 (5)


Text

  • '

consumers Power POWERINli

. MICHlliAN'S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043 October 4, 1994 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

f.

LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of September, 1994.

If you have any questions or concerns, please feel free to contact me at (616) 764-8913,

~xtension 0113.

Sincerely, A L Wi 11 i ams*

Reactor Engineer

  • CC:

RAFenech, Palisades JMartin, USNRC RAVincent, Palisades Resident Inspector, Palisades DRH~hn~*Div of Rad Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Publtc Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades JDStafford, Palisades SMMcintyre, Pl3-121 Region III Administrator, USNRC Document Control, 950*22*35*10/L Cycl~ *11 Reports

.

  • 1....,,. 'r-..,

~I 1

  • 941o11 o f2~:_L9*~~')~9-3_0 __

...... : ~.

1 PDR ADOCK 05000255 I

R PDR I '

A CM5 ENERGY COMPANY

OPERATING STATUS:

1.

UNIT NAME

2.

REPORTING PERIOD:

3.

LICENSED THERMAL POWER (MWt)

4.

NAMEPLATE RATING (GROSS MWe)

5.

DESIGN ELECTRICAL RATING (NET MWe)

6.

MAXIMUM DEPENDABLE CAPACITY (GROSS ~We)

7.

MAXIMUM DEPENDABLE CAPACITY (NET MWe)

OPERATING DATA REPORT Palisades

.940901-940930 2530.0 811. 7 805.0

    • 770
    • 730
8.

IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH ?AND 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

10. REASONS FOR RESTRICTIONS, IF ANY:
11. HOURS IN REPORTING PERIOD
12. NUMBER OF HOURS REACTOR WAS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH)
17. GROSS ELECTRICAL ENERGY GENERATED CMWH)
18. NET ELECTRICAL ENERGY GENERATED (MWH)
19. UNIT SERVICE FACTOR
20. UNIT AVAILABILITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET)
22. UNIT CAPACITY FACTOR (USING DER NET)
23. UNIT FORCED OUTAGE RATE This Month 720.0 720.0 720.0 1812408.0 585110.0
  • 556582.0 100.0%

100.0%

105.9%

96.0%

0.0%

24. SHUTDOWNS SCHF.DULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND*DUiV\\TICN OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

Yr-to-Date 6551.0 3663.0 3651.5 9076632.0 2934180.0 2789308.0 55.7%

55.7%

58.3%

52.9%

44.3%

Forecast DOCKET NO 50-255 DATE 10-04-94 COMPLETED BY BWBerles TELEPHONE (616)764-8913 NOTES:

cLimulative 199718.0 112103.0 107453. 1 232739451. 0 73552683.0 69372043.0 53.8%

53.8%

51.6%*

43.1%

30.2%

Achieved

AVERAGE DAILY UNIT POWER LEVEL MONTH ___

S~e""""p~te=m=b~er~

DAY AVERAGE DAILY POWER LEVEL DAY (MWe Net)

1.

782

17.
2.

778

18.
3.

783

19.
4.

781

20.
5.

784

21.
6.

784

22.
7.

784

23.
8.

758

24.
9.

774

25.
10.

769

26.
11.

773

27.
12.

767

28.
13.

766

29.
14.

761

30.
15.

"761

31.
16.

765 INSTRUCTIONS:

DOCKET NO 50-255 UNIT Palisades DATE 10/04/94 COMPLETED BY BWBerles TELEPHONE (616)764-8913 AVERAGE DAILY POWER LEVEL (MWe Net) 768 775 770 771 769 771 772 773 777 778 775 775 776 772 On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole megawatt.

SUMMARY

OF OPERATING EXPERIENCE FOR SEPTEMBER 1994 The unit ran at full power until September 29.

Due to the need to saturate a new demineralizer with boron, there was a potential for an inadvertent dilution of the PCS.

As a precautionary measure, reactor power was lowered to 99% on September 29th and 30th for this process.

REPORT MONTH --~S=E~PT~E~M=BE~R~19~9~4 __

No.

Date Type1 Duration Reason2 (Hours)

UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Shutting Down Reactor3 Licensee Event Report #

System Code4 Component Code5 Cause & Corrective Action to Prevent Recurrence DOCKET NO 50-255 UNIT Palisades DATE 10/04/94 COMPLETED BY --~BW~B~e~r~le~s TELEPHONE (616)764-8913 09/29/30 40 Precautionary Measure.

Reactor power was reduced to 99% as a precaution against an inadvertent dilution during the saturation of

1.

F:

Forced S:

Scheduled

2.

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

3.

Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain) a new demineralizer filter

4.

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

5.

Exhibit I - Same Source