consumers Power POWERINli

. MICHlliAN'S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043 October 4, 1994 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555  : f.

LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of September, 1994.

If you have any questions or concerns, please feel free to contact me at (616) 764-8913, ~xtension 0113.

Sincerely, A L Wi 11 i ams*

Reactor Engineer

  • CC: RAFenech, Palisades JMartin, USNRC RAVincent, Palisades Resident Inspector, Palisades DRH~hn~*Div of Rad Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Publtc Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades JDStafford, Palisades SMMcintyre, Pl3-121 Region III Administrator, USNRC Document Control, 950*22*35*10/L Cycl~ *11 Reports *

. . *1 . . , . 'r- ..,

~I941o11 of2~:_L9*~~')~9-3_0_ _......: ~.1 ---

1

. PDR ADOCK 05000255 I  :

R PDR I '

A CM5 ENERGY COMPANY

OPERATING DATA REPORT DOCKET NO 50-255 DATE 10-04-94 COMPLETED BY BWBerles TELEPHONE (616)764-8913 OPERATING STATUS:

NOTES:

1. UNIT NAME Palisades
2. REPORTING PERIOD: .940901-940930
3. LICENSED THERMAL POWER (MWt) 2530.0
4. NAMEPLATE RATING (GROSS MWe) 811. 7
5. DESIGN ELECTRICAL RATING (NET MWe) 805.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS ~We) **770
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730
8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH ?AND 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
10. REASONS FOR RESTRICTIONS, IF ANY:

This Month Yr-to-Date cLimulative

11. HOURS IN REPORTING PERIOD 720.0 6551.0 199718.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 3663.0 112103.0
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE 720.0 3651.5 107453. 1
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH) 1812408.0 9076632.0 232739451 . 0
17. GROSS ELECTRICAL ENERGY GENERATED CMWH) 585110.0 2934180.0 73552683.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) *556582.0 2789308.0 69372043.0
19. UNIT SERVICE FACTOR 100.0% 55.7% 53.8%
20. UNIT AVAILABILITY FACTOR 100.0% 55.7% 53.8%
21. UNIT CAPACITY FACTOR (USING MDC NET) 105.9% 58.3% 51.6%*
22. UNIT CAPACITY FACTOR (USING DER NET) 96.0% 52.9% 43.1%
23. UNIT FORCED OUTAGE RATE 0.0% 44.3% 30.2%
24. SHUTDOWNS SCHF.DULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND*DUiV\TICN OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 10/04/94 COMPLETED BY BWBerles MONTH ___S~e""""p~te=m=b~er~ TELEPHONE (616)764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net)

1. 782 17. 768
2. 778 18. 775
3. 783 19. 770
4. 781 20. 771
5. 784 21. 769
6. 784 22. 771
7. 784 23. 772
8. 758 24. 773
9. 774 25. 777
10. 769 26. 778
11. 773 27. 775
12. 767 28. 775
13. 766 29. 776
14. 761 30. 772
15. "761 31.
16. 765 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.

SUMMARY

OF OPERATING EXPERIENCE FOR SEPTEMBER 1994 The unit ran at full power until September 29. Due to the need to saturate a new demineralizer with boron, there was a potential for an inadvertent dilution of the PCS. As a precautionary measure, reactor power was lowered to 99% on September 29th and 30th for this process.

DOCKET NO 50-255 UNIT Palisades DATE 10/04/94 COMPLETED BY --~BW~B~e~r~le~s REPORT MONTH --~S=E~PT~E~M=BE~R~19~9~4_ _ TELEPHONE (616)764-8913 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type 1 Duration Reason 2 Method of Licensee System Component Cause &Corrective 4 5 (Hours) Shutting Event Code Code Action to Down Reactor 3 Report # Prevent Recurrence 09/29/30 40 Precautionary Measure . Reactor power was reduced to 99% as a precaution against an inadvertent dilution during the saturation of a new demineralizer filter

1. 2. 3. 4. 5.

F: Forced Reason: Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-0ther (Explain) (NUREG-0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)