ML18059B133

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1994 for Palisades Nuclear Plant
ML18059B133
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/31/1994
From: Banks M, Berles B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9408100340
Download: ML18059B133 (5)


Text

....

~

consumers Power POWERIN&

MICHl&AN'S PRO&RESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 August 3, 1994 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of July, 1994.

If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.

Sincerely, M L Banks Reactor Engineer CC:

RAFenech, Palisades JMartin, USNRC JLKuemin, Palisades Resident Inspector, Palisades DRHahn, Div of Rad Health ~ervices, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades JDStafford, Palisades SMMclntyre, Pl3-121 Region III Administrator, USNRC Document Control, 950*22*35*10/L Cycle 11 Reports GOri n rI u l/ L* C.:i*

9408100340 940731m:

i i PDR ADOCK 05000255 '

I R

-PDR' I

~----

  • ---*- --~-

j

'--~

A CM5 ENERGY COMPANY

OPERATING STATUS:

1.

UN I T NiU!E

2.

REPORTING PERIOD:

3.

LICENSED THERMAL POWER (MWt)

4.

NAMEPLATE RATING (GROSS MWe)

5. *DESIGN ELECTRICAL RATING (NET MWe)

OPERATING DATA REPORT Palisades 940701-940731 2530.0 811. 7 805.0

6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)

    • 770
7.

MAXIMUM DEPENDABLE CAPACITY CNET MWe)

    • 730
8.

IF CHANGES OCCUR IN CAPC!TY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY CNET MWe):

10. REASONS FOR RESTRICTIONS, IF ANY:
11. HOURS IN REPORTING PERIOD*
12. NUMBER OF HOURS REACTOR WAS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED CMWH)
17. GROSS ELECTRICAL ENERGY GENERATED CMWH)
18. NET ELECTRICAL ENERGY GENERATED CMWH)
19. UNIT SERVICE FACTOR
20. UNIT AVAILABILITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET)
22. UNIT CAPACITY FACTOR (USING DER NET)
23. UNIT FORCED OUTAGE RATE This Month 744.0 744.0 744.0 1874208.0 596340.0 566651.0 100.0%

100.0%

104.3%

94.6%

0.0%

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURA T j()N OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

Yr-to-Date 5087.0 2199.0 2187.5 5389776.0 1748490.0 1661841.0 43.0%

43.0%

44.8%

40.6%

57.0%

Forecast QOCKET NO DATE 50-255 08-04-94 COMPLETED BY BWBerles TELEPHONE (616)764-8913 NOTES:

ClilJ.Jlative 198254.0 110639.0 105989. 1 229052595.0 72366993.0 68244576.0 53.5%

53.5%

51. 2%*

42.8%

30.5%

Achieved

AVERAGE DAILY UNIT POWER LEVEL MONTH ___

J~u"'-'l........ v __

DAY AVERAGE DAILY POWER LEVEL DAY (MWe Net)

1.

766

17.
2.

772

18.
3.

769

19.
4.

762

20.
5.

757

21.
6.

761

22.
7.

759

23.
8.

756

24.
9.

763

25.
10.

770

26.
11.

767

27.
12.

761

28.
13.

759

29.
14.

763

30.
15.

767

31.
16.

767 INSTRUCTIONS:

DOCKET NO 50-255 UNIT Palisades DATE 08/03/94 COMPLETED BY BWBerles TELEPHONE

{616)764~8913 AVERAGE DAILY POWER LEVEL (MWe Net) 761 761 756 750 753 750 758 754 757 765 765 766 772 767 754 On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole megawatt.

SUMMARY

OF OPERATING EXPERIENCE FOR JULY 1994 The unit ran at full power for the entire month of July.

REPORT MONTH ---=J=U=-L Y'--=19=9....:.4 __

No.

Date NONE

1.

F:

S:

Forced Scheduled Type1

2.

Duration Reason2 *

(Hours)

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS.

Method of Licensee Shutting Event 3

Down Reactor Report #

3.

Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)

4.

System Code4 Component Code5 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Cause & Corrective Action to Prevent Recurr~nce

5.

DOCKET NO 50-255' UNIT Palisades DATE 08/03/94 COMPLETED BY -,---,-B=W""B""'e'-r l""'e'""'s TELEPHONE (616)764-8913 Exhibit I - Same Source

...: