ML18059B086

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1994 for Palisades Nuclear Plant
ML18059B086
Person / Time
Site: Palisades 
Issue date: 06/30/1994
From: Banks M, Berles B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9407110298
Download: ML18059B086 (5)


Text

  • .

consumers Power PDWERIN&

/f/llCHl&AN'S PRD&RESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, *Ml 49043

  • July 5, 1994 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555*

LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of June, 1994.

If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.

Sincerely, M L Banks Reactor Engineer

.CC:

RAFenech, Pali sades JMartin, USNRC JLKuemin, Palisades Resident Inspector, Palisades DRHahn, Div of Rad Health Services, L~nsin~, MI BWJorgensen, Michigan Dept of Labor, Lansing, Ml JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades*

JDStafford, Palisades SMMcintyre, Pl3-121 Region III Administrator, USNRC Document Control, 950*22*35*10/L Cycle 11 Reports 9407110298 940630

  • v~

PDR ADOCK 05000255 PDR ____. (

R

~ -i \\.../ 'v '-I f -*i A CMS' ENER5Y COMPANY

OPERATING DATA REPORT OPERATING STATUS:

1.

UNIT NAME

2.

REPORTING PERIOD:

Palisades 940601-940630

3.

LICENSED THERMAL POWER (MWt)

4.

NAMEPLATE RATING (GROSS MWe)

5.

DESIGN ELECTRICAL RATING (NET MWe)

6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)

7.

MAXIMUM DEPENDABLE CAPACITY (NET MWe) 2530.0 811. 7 805.0

    • 770
    • 730
8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEM NUMBERS 3 AND 7) SINCE LAST REPORT GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

10. REASONS FOR RESTRICTIONS, IF ANY:
11. HOURS IN REPORTING PERIOD
12. NUMBER OF HOURS REACTOR WAS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL.ENERGY GENERATED (MWH)
17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
18. NET ELECTRICAL ENERGY GENERATED (MWH)
19. UNIT SERVICE FACTOR
20. UNIT AVAILABILITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET)
22. UNIT CAPACITY FACTOR (USING DER NET)
23. UNIT FORCED OUTAGE RATE This Month 720.0 304.9 294.2 666768.0 214660.0 20240D.O 40.9%

40.9%

38.5%

34.9%

59.1%

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

.Yr-to-Date 4343.0 1{+55.0 1443.5 3515568.0 1152150.0 1095190.0 33.2%

33.2%

34.5%

31.3%

66.8%

Forecast DOCKET NO 50-255 DATE 07-02-94 COMPLETED BY BWBerles TELEPHONE (616)764-8913 NOTES:

Cumulative 197510.0 109895.0 105245.1 227178387.0 71770653.0 67677925.0 53.3%

53.3%

51.0%*

42.6%

30.7%

Achieved

AVERAGE DAILY UNIT POWER LEVEL MONTH --"""""J-=-un=e=----

DAY AVERAGE DAILY POWER LEVEL DAY (MWe Net)

1.

0

17.
2.

0

18.
3.

0

19.
4.

0

20.
5.

0

21.
6.

0

22.
7.

0

23.
8.

0

24.
9.

0

25.
10.

0

26.
11.

0

27.
12.

0

28.
13.

0

29.
14.

0

30.
15.

0 16..

0 INSTRUCTIONS:

DOCKET NO 50-255 UNIT Palisades DATE 07/05/94 COMPLETED BY BWBerles TELEPHONE (616)764-8913 AVERAGE DAILY POWER LEVEL (MWe Net) 0 49 199 472 753 779 786 767 782 774 781 776 776 775 On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole megawatt.

I.

SUMMARY

OF OPERATING EXPERIENCE FOR JUNE 1994 The unit began the month shutdown, but went critical at 0708 on June 18, 1994 and was on-line at 1746 hours0.0202 days <br />0.485 hours <br />0.00289 weeks <br />6.64353e-4 months <br />.

Full power was reached by 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> on June 22, and the plant operated at full power for the remainder of the month.

REPORT MONTH --~J~U'"""NE=--~19~9~4 __

No.

Date NONE L

F:

s:

Forced Scheduled Type 1

2.

Duration Reason 2 -

(Hours)

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refue ling*

D-Regulatory Restriction E-Operator Training & License

  • Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Shut_t i ng Down Reactor3

3.

Method:

  • 1-Manual Licensee Event Report #

2-Manual Scram 3-Automatic Scram 4-0ther (Explain)

4.

System Code4 Component Code6 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

DOCKET NO 50-255 UNIT Palisades DATE 07/05/94

  • COMPLETED BY __
.:BW.:.:B"'e'-r l.,...e=s TELEPHONE (616)764-8913 Cause & Corrective Action to Prevent Recurrence 5_

Exhibit I *- Same Source