Forwards Insp Rept 50-255/94-04 on 940129-0314.No Violations Noted.Unresolved Item Concerning Missing Separation Barriers for Reactor Protection Sys Channels 1 & 3 Cables Located in Same Cable Tray Noted
ML18059A927
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/30/1994
From: Kropp W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Thomas J. Palmisano
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18059A928 List:
References
NUDOCS 9404140122
Download: ML18059A927 (5)


See also: IR 05000255/1994004

Text

'*

Docket No. 50-255

License No. DPR-20

Consumers Power Com~any

ATTN:

Thomas J. Palmisano

General Manager

27780 Blue Star Memorial Highway

Covert, MI

49043-9530

Dear Mr. Palmisano:

MA~ 3 0 1994

SUBJECT:

NRC INSPECTION REPORT.NO. 50-255/94004

This refers to the routine safety inspection conducted by Messrs.

M. E. Parker, D. G. Passehl, K. Salehi, and J. H. Neisler of this office from

January 29, 1994, through March 14, 1994.

The inspection included a review of

activities at your Palisades Nuclear Generating Facility.

At the conclusion

of the inspection, the findings were disc~ssed with those members of your

staff identified in the enclosed report.

Areas examined during the inspection are identified in the repo~t. Within

these areas, the inspection consisted of a selective exami~ation of procedures

and representative records, ob~ervations, and interviews with personnel.

While no violatirins of NRC requirements were identified during the course of

this inspection, an unresolved item was identified conc~rning missing

separation barriers for Reactor Protection System (RPS) channels 1 a.nd 3

cables located in the same cable tray. Although your initial operability

determination found the RPS channels to be operable, your subse~uent review at

our request found that the RPS channels may not have b~en operable as

. required. This indicates that weaknesses in engineering.reviews of system

design requirements still exist, despite your efforts to improve in this area.

In addition, this inspection identified some long-standing material condition

deficiencies that were not corrected in a timely manner, including the "A" air

start motor for Emergency Diesel Generator (EDG) 1-2, and a problem

annunciator associated with lube oil level switch LS 1487 on EDG 1-2.

We will

continue to evaluate y6ur actions in regard to these issues.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC*

Public Document Room.

9404140122 940330

PDR

ADOCK 05000255

0

PDR

    • 0.* -r<

........ \\,.,. *..., .. .) v

.ArJ'-n\\ I

-J*V

I

.,

Consumers Power Company

2

We will gladly discuss any questions you have conc~rhing this inspection.

Enclosure:

Inspection Report No.

50-255/94004(DRP)

Distribution

cc w/enclosure:

Robert A. Fenech, Vice President

Nuclear Operations

David W. Rogers, Safety

and 'Licensing Director

OC/LfDCB

Resident Inspector, RIII

James_ R. Padgett, Michigan Publii

Service Commission

Michigan Department of

Public Health

Palisades, LPM, NRR

SRI, Big Rock Point

G. E. Graht, RIII */

bee:

PUBLIC (IEOl) *L./""

~tJ

<°° Orsyi

R~I I

eJ-'1. 6Jd1.

Gardner

Ak.~.

'?J/Jr/'f4-

Sincerely,

w. J. Kropp, Chief

.

Reactor Projects Branch 2A

uP11

Kropp*

cl

\\ \\_*

. .,

,. r: \\

  • )(~. 'J

.

,.

.

/

Consumers Power Company

2

We will gladly discuss ~ny questions you have concerning this inspection.

Enclosure:

Inspection Report

No. 50-255/94004(DRP)

Distribution

cc w/enclosure:

Robert A. Fenech, Vice President,

Nuclear Operations

David W. Rogers, Safety

and Licensing Director

OC/LFDCB

Resident Inspector, Riii

James R. Padgett, Michigan Public

Service Commission

Michigan Department of

Public Health

Palisades, LPM, NRR

SRI, Big Rock Point

G. E. Grant, Riii *

(see attached concurrence)

'

~RI.II;.?*

Riii

Riii

.._.....

n

Gardner

Burgess

(para 2)

(para 6)

.

  • Sincerely,

W. J. Kropp, Chief

Reactor Projects Section 2A

R~;b

rfi~k .

Riii

Kropp

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION 111

Docket No. 50-255

Consumers Power Company

ATTN:

Thomas J. Palmisano

. General Manager .

801 WARRENVlLLE ROAD

LISLE. ILLINOIS 60532-4351

MAR 3 0 1994

27780 Blue Star Memorial Highway

Covert, MI

49043-9530

Dear Mr. Palmisano:

SUBJECT:

NRC INSPECTION REPORT NO. 50-255/94004

This refers to the routine safety inspection conducted by Messrs.

M. E. Parker, D. G. Passehl, K.

Salehi~ and J. H. Neisler of this office from

January 29, 1994, through M~rch 14, 1994.

The inspection included~ review.of

activities at ybur Palisade~ Nuclear Generating Facility. At the ~onclusion

of the inspection, the findings were discussed with those members of your

staff identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of a selective examination of procedures

and .representative records, observations, and interviews with personnel.

While no viol~tions of NRC requirements were identified duiing the course of

this inspection, an unresolved item was identified concerning missing

cabl~s located in the same ~able tray.

Although your initial operability

determination found the RPS channels to be operable, your subsequent review at

our request found that the RPS channels may not have been operable as

required.

This iridicates that weaknesses in engineering reviews of system

design requirements still exist, despite your efforts to 1mprove in this area.

In addition, this inspection identified some long~standing material condition

deficiencies that were not corrected in a timely manner, including the "A" air

start motor for Emergency Diesel Generator (EOG) 1-2, and a problem

annunciator associated with lube oil level switch LS 1487 on EOG 1-2.

We will

continue to evaluate your acti~ns in: regard to th~se issues.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room .

Consumers Power Company

2

. MAR 3 0 199.4

  • We will gladly discuss any questiqns you have concerning this inspection.

Enclosure:

Inspectiqn Report No.

50-255/94004(DRP)

Distribution

cc w/enclosure:

Robert A. Fenech, Vice President

Nuclear Operations

David W. Rogers, Safety'

and Licensing Director

OC/LFDCB

Re~ioent Inspector, RIII

James R. Padgett, Michigan Public

Service Commission

Michigan Departmerit of *

Public Health

Palisades, LPM, NRR

SRI~ B~g Rock Point

G. E. Grant, RIII

Sincer~ly,

/JI.

.*

W. J.

ropp, Chief

Reactor Projects Branch iA