ML18059A429

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1993 for Palisades Nuclear Plant
ML18059A429
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/30/1993
From: Handlovits S, Kluskowski P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9310130225
Download: ML18059A429 (6)


Text

....

J..,,,

consumers Power_ __ _

POW ERi Nii MICHlliAN'S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 October 5, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of September, 1993.

If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.

Sincere~~~~

PJ Kl uskowski Reactor Engineer CC:

DPHoffman, P26-117B JMartin, USNRC JLKuemin, Palisades Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades MPKnopp, Palisades SMMclntyre, Pl3-121 Region III Administrator, USNRC Document Control, 950*22*35*10/L SMH93*19

'*\\

i.*.

~.

i' *.

A CMS' ENER5Y COMPANY

OPERATING STATUS:

1.

UNIT NAME

2.

REPORTING PERIOD:

3.

LICENSED THERMAL POWER CMWt)

4.

NAMEPLATE RATING (GROSS MWe)

5.

DESIGN ELECTRICAL RATING (NET MWe)

6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)

OPERATING DATA REPORT Palisades 930901-930930 2530.0 811. 7 805.0

    • 770
7.

MAXIMUM DEPENDABLE CAPACITY (NET MWe)

    • 730
8.

IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM* NUMBERS 3 THROUGH ?AND 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

10. REASONS FOR RESTRICTIONS, IF ANY:
11. HOURS IN REPORTING PERIOD
12. NUMBER OF HOURS REACTOR WAS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED CMWH)
17. GROSS ELECTRICAL ENERGY GENERATED CMWH)
18. NET ELECTRICAL ENERGY GENERATED CMWH)
19. UNIT SERVICE FACTOR
20. UNIT AVAILABILITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET)
22. UNIT C~PACITY FACTOR (USING OER NET)
23. UNIT FORCED OUTAGE RATE This Month 720.0 0.0 0.0 o.o 0.0 0.0 0.0%

0.0%

0.0%

.0.0%

0.0%

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS <TYPE, DATE AND DURATION OF EACH):

Refueling outage is currently in progress.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

October 15, 1993

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

Yr-to-Date 6551.0 3302.6 3293.0 8247903.0 2699400.0 2569273.0 50.3%

50.3%

53.7%

48.7%

11.4%

Forecast DOCKET NO 50-255 DATE 09-30-93 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 NOTES:

Cumulative 190958.0 107035.2 102499.6 220543875.0 69589583.0 65606353.0

53. 7"!.
53. 7"!.

51.2%*

42.7%

29.9%

Achieved

AVERAGE DAILY UNIT POWER LEVEL MONTH SEPTEMBER 1993 DAY AVERAGE DAILY POWER LEVEL (MWe Net)

1.

0

2.

0

3.

0

4.

0

5.

0

6.

0

7.

0

8.

0

9.

0

10.

0

11.

0

12.

0

13.

0

14.

0

15.

0

16.

0 INSTRUCTIONS:

DAY

17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.

DOCKET NO ___

5~0~-=25~5 UNIT Palisades DATE ---=l=O /<..-::0:...:.5......,/ 9'-=3 COMPLETED BY SMHandlovits TELEPHONE {616)764-8913 AVERAGE DAILY POWER LEVEL (MWe Net) 0 0

0 0

0 0

0 0

0 0

0 0

0 0

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole megawatt.

REPORT MONTH ~A~U~G~US~T~19~9~3 ____ _

No.

Date Type 1 02 930604 s

l.
2.

F:

Forced S:

Scheduled Duration Reason2 (Hours) 744.0 c

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor3 Report #

3.

Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)

4.

System Component Code4 Code6 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Cause & Corrective Action to Prevent Recurrence

5.

DOCKET NO UNIT DATE COMPLETED BY TELEPHONE Exhibit I - Same Source 50-255 Palisades 09/05/93 SMHandlovits (616)764-8913

i I

REPORT MONTH _S=E"'-P"'""'TE=M=B=ER..:......:.1=99""'3'-------

1 I

No.

Date 02 930604

1.

F:

Forced S:

Scheduled Type 1 s

2.

Duration Rea~on 2

(Hours) 720.0 c

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refue 1 i ng D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

UNIT SHUTDOWNS ANO POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor3 Report #

3.

Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)

4.

System Component Code4 Code6 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Cause & Corrective Action to Prevent Recurrence

5.

DOCKET NO UNIT DATE COMPLETED BY TELEPHONE Exhibit I - Same Source 50-255 Palisad~s 10/05/93 SMHandlovits (616)764-8913

.. c,.

SUMMARY

OF OPERATING EXPERIENCE FOR SEPTEMBER 1993 The unit was shutdown for the entire month.