ATTACHMENT 1 Consumers Power Company Palisades Plant Docket 50-255 REMOVAL OF HYDRAZINE TANK TECHNICAL SPECIFICATIONS 9206250219 920612 PDR ADOCK 05000255~
- p PDR Proposed Pages June 12, 1992 2 Pages
3.19* IODINE REMOVAL SYSTEM Specification:
3.19 The Iodine Removal System shall be OPERABLE with:
- a.
The Sodium Hydroxide Tank (T-103) containing a minimum 4,200 +/- 300 gallons of 30.0 +/- 0.5 percent by weight sodium hydroxide solution.
- b.
T-103 capable of supplying sodium hydroxide solution to the containment spray pump suction headers.
Applicability Specification 3.19 is applicable during POWER OPERATION.
Action With the Iodine Removal System inoperable:
- a.
Restore the system to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or
- b.
Be in HOT SHUTDOWN within the next 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
The Iodine Removal System acts in conjunction with the containment spray system to reduce the post-accident level of fission products in the containment atmosphere.
Sodium Hydroxide is added to the recirculated water after a LOCA to establish a neutral pH.
References FSAR, Section 6.4.
FSAR, Section 14.22.
3-84 Amendment No. 4G
4.0 Table 4.2.2 (Contd)
Minimum Frequencies for Equipment Tests
- 12.
Iodine Removal System The Iodine Removal System shall be demonstrated operable:
- a.
At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed or otherwise secured in position, is in its correct position.
- b.
At least once per 6 months by:
- 1.
Verifying the volume of sodium hydroxide in tank T-103.
- 2.
Verifying the concentration of sodium hydroxide in T-103.
- 13.
Containment Purge and Ventilation Isolation Valves The Containment Purge and Ventilation Isolation Valves shall be determined closed:
- a.
At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by checking the valve position indicator in the control room
- b.
At least once every 6 months by performing a leak rate test between the valves.
4-15b Amendment SI-, 9G
ATTACHMENT 2 Consumers Power Company Palisades Plant Docket 50-255 REMOVAL OF HYDRAZINE TANK TECHNICAL SPECIFICATIONS Existing Pages Marked to Show Change June 12, 1992 2 Pages
3.19-IODINE REMOVAL SYSTEM
~ r b"~it n:: ~:: i~e operatioAal status of the IodiAe Removal System Objective To defi AC those coAditi OAS ~~heA it is Aecessary to have the Iodi Fie Removal System operable.
Specification:
3.19.-l-Duriflg pm~er operatioFI the Iodine Removal System shall be operable with:
- a.
The IodiFle Removal Hydrazifle TaFlk (T 102) coF1taiF1iF1g 270 +/- 17
~iUe:s c:!e!s g~s l P~~~s~;~c:~t 1 ~~ 2 ~~1i ~h:s~:. hydrazi Fie sel uti 0F1 bi. The IediFle Removal Make Up Sodium Hydroxide Tank (T-103) containing a minimum 4,200 +/- 300 gallons of 30.0 +/- 0.5 percent by weight sodium hydroxide solution.
- c. H 0
~ 1 ~~~:~!~ t~ ~~r~t1-~br~~~~~,r~~~*~~
i:~ID.~~!fbeiH~~FI u t~~n ce~tai ~m~~~ ~~~P ;~d e~h~::,.::::§:'~\\;,yi~~:4!=i:~,g~:t::~::~~:!9:¥
~-~*
111 1~
1 1lllll~l!~ill,:::::!::~::~:1:::::::,1::il::~:tla1::1::~:1~1:i:i1µ:r:u~9::ig1111:i11111m:~:m1m m~:~!~~th the Iodine Removal System inoperable,
!]:
restore the system to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or b.]JHJI!be in hot shutdown condition within the next 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> tmt4-l-
.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,. e per ab l e status i s a ch i eve d.
Bases The Iodine Removal System acts in conjunction with the containment spray system to reduce the post-accident level of fission products in the containment atmosphere.
Hydrazifle is added te the ~~ater from the SIRW taFll< after a LOCA te provide fer iediFle reteF1ti0F1.
Sodium Hydroxide is added to the recirculated water after a LOCA to establish a neutral pH.
References FSAR, Section 6.4.
FSAR, Section 14.22.
C0F1sumers Power CempaAy Report, "Palisades Plaflt IediAe Removal System, EvaluatieA," December 1977.
C0F1sumers Power CempaAy Report, "A Hydraulic EvaluatieA ef the Prepesed MedificatieA te the HydraziAe IAjectieFI System at the Palisades PlaAt," March 6, 1978.
3-84 Amendment No. 4G April 12, 1978
4.2 '
Table 4.2.2 (Contd)
Minimum Frequencies for Equipment Tests
- 12.
Iodine Removal System The Iodine Removal System shall be demonstrated operable:
- a.
At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path, that is not locked, sealed or otherwise secured in position, is in its correct position.
- b.
At least once per 6 months by:
- 1.
Verifying that tanks T 102 aAd T-103 contain!s the minimum requiied volumes.
~
- 2.
Verifying the concentration of hydraziAe iA T 102 aAd sodium hydroxide in T-103.
- c.
At least oAce per refueliA~ cycle, duriAg shutdo\\~A, by verifyiAg that each automatic valve lA the flow path actuates to its correct positioA.
- 13.
Containment Purge and Ventilation Isolation Valves The Containment Purge and Ventilation Isolation Valves shall be determined closed:
- a.
- b.
At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by checking the valve position indicator in the control room At least once every 6 months by performing a leak rate test between the valves.
4-15b Amendment 81-, 9G August 26, 1985