ML18057B462

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1991 for Palisades Nuclear Plant
ML18057B462
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/31/1991
From: Handlovits S, Mlynarek M
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9201140235
Download: ML18057B462 (5)


Text

',

consumers Power POW ERi Nii MICHlliAN'S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 January 8, 1992 US Nuclear Regulatory Commission Document Control Desk Washirigton, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of December, 1991.

If you have any questions or concerns, plea~e feel free to contact me at (616) 764-8913,,exten~ion 0113.

Sincerely,

~..

MG Mlynarek

  • Reactdr Ehgineer CC:

DPHoffman, P26-ll7B RMRice, Palisades ABDavis, USNRC JLK~emin, Palisades Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service ~ommission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades MALapinski, Pl3-104 Administrator, USNRC Document Control, 950*22*35*10/L SMH92*02

. 9'201140235

. f:;bR ~* ADOCK 9112:31 05000255 PDR I

I

  • R L1 '

A CMS' ENERGY COMPANY

\\

OPERATING STATUS:

1.

UNIT NAME

2.

REPORTING PERIOD:

OPERATING DATA REPORT Palisades 911201-911231

3.

LICENSED THERMAL POWER (MWt) 2530.0

4.

NAMEPLATE RATING (GROSS MWe) 811.7

5.

DESIGN ELECTRICAL RATING (NET MWe) 805.0

6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)

    • 770
7.

MAXIMUM DEPENDABLE CAPACITY (NET MWe)

    • 730
8.

IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 AND 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

10. REASONS FOR RESTRICTIONS, IF ANY:
11. HOURS IN REPORTING PERIOD
12. NUMBER OF HOURS REACTOR WAS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH)
17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
18. NET ELECTRICAL ENERGY GENERATED (MWH)
19. UNIT SERVICE FACTOR
20. UNIT AVAILABILITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET)
22. UNIT CAPACITY FACTOR (USING DER NET)
23. UNIT FORCED OUTAGE RATE This Month Yr-to-Date 744.0 8760.0 628.4 6845.5 619.4 6693.9 1513368.0 15902168.0 496580.0 5142190.0 471674.0 4873835.0 83.3%

76.4%

83.3%

76.4%

86.8%

76.2%

78.8%

69.1%

16.7%

4.5%

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

60-Day Refueling Outage tentatively scheduled to begin February 22, 1992

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

Forecast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

DOCKET NO 50-255 DATE 12-31-91 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 NOTES:

Cumulative 175623.0 97046.6 92911. 5 196654613.0 61778725.0 58172008.0 52.9%

52.9%

49.9%

41.1%

31.4%

Achieved

./

MONTH DECEMBER 1991 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 01/08/92 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe Net)

1.

791

17.

791

2.

792

18.

793

3.

791

19.

794

4.

790

20.

788

5.

789

21.

796

6.

791

22.

792

7.

787

23.

792

8.

785

24.

791

9.

560

25.

790

10.

0

26.

791

11.

0

27.

792

12.

0

28.

792

13.

0

29.

783

14.

0

30.

796

15.

213

31.

797

16.

687 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole megawatt.

REPORT MONTH DECEMBER 1991 No.

Date Type I

08 911209 F

1.
2.

F:

Forced S:

Scheduled Duration Reason' (Hours) 124.6 A

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor' Report #

3 LER 92001

3.
4.

Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)

System Component Code' Code 5

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Cause & Corrective Action to Prevent Recurrence Main generator seal

µressure decrease

5.

DOCKET NO UNIT DATE COMPLETED BY TELEPHONE oi 1 Exhibit I - Same Source 50-255 Palisades 01/08/92 SMHandlovits (616)764-8913 r

SUMMARY

OF OPERATING EXPERIENCE FOR DECEMBER 1991 The unit began the month at full power.

On December 9 at 1710 hours0.0198 days <br />0.475 hours <br />0.00283 weeks <br />6.50655e-4 months <br />, the main generator seal oil pressure decreased such that the unit was removed from service (reactor trip occurred at 1722 hours0.0199 days <br />0.478 hours <br />0.00285 weeks <br />6.55221e-4 months <br />) to protect pl ant equipment.

After repairs were completed, the reactor was taken critical on December 14 at 1303 hours0.0151 days <br />0.362 hours <br />0.00215 weeks <br />4.957915e-4 months <br /> and the pl ant was pl aced on-1 i ne at 2202 hours0.0255 days <br />0.612 hours <br />0.00364 weeks <br />8.37861e-4 months <br />.

Full power was reached by December 16 after 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> and the unit remained at 100% power for the remainder of the month.