Notice of Violation from Insp on 910924-1104.Violation Noted:Pressure Switch Made Inoperable on 910827 When Electrical Links Opened as Part of Ground Fault Isolation & Remained Inoperable Until 910912 in Violation of TS
ML18057B396
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/25/1991
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML18057B395 List:
References
50-255-91-18, NUDOCS 9112060048
Download: ML18057B396 (1)


Text

NOTICE OF VIOLATION Consumers Power Company Docket No. 50-255 License No. DPR-20 Palisades Nuclear Generating Plant During an NRC inspection performed from September 24 through November 4, 1991, a violation of NRC requirements was identified.

In accordance with the 11General Statement of Policy and Procedure for NRC Enforcement Actions,"

(10 CFR Part 2, Appendix C, (1991)), the violation is listed below.

Palisades Final Safety Analysis Report, Section 9.3.2.3.3, "Component Cooling System Emergency Operations," describes low pump discharge pressure as an interlock required to automatically start Component Cooling Water Pump P52C during accident conditions if the other pumps have not started *. Pressure switch PS-0918 provides this function.

Palisades Technical Specification 3.4.1 requires, in part, Component Cooling Water Pump P52C shall be operable, as shall all associated heat exchangers, valves, piping and interlocks required to function during accident conditions. This includes pressure switch PS-0918.

Technical Specification 3.4.2 allows one component specified in Technical Specification 3.4.1 to be inoperable, but restricts the duration to 10.5 days unless the reactor is in cold shutdown.

Contrary to the above, Pressure Switch PS-0918 was made inoperable on August 27, 1991, when electrical links were opened as part of a ground fault isolation, and it remained inoperable until September 12, 1991, a period of sixteen days.

This is a Severity Level IV violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, Consumers Power Company is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region III, 799 Roosevent Road, Glen Ellyn, Illinois 60137, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice).

This reply should be clearly marked as a "Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.

If an adequate reply is not received within the time specified in this Notice, an order may be issued to show cause why. the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken.

Where good cause is shown, consideration will be gi.ven to extending the response time.

Da~ed at, Glen ElJyn, Illinois th1 s 8 -5"1Clay of AloveM~f}--., 1991

~i1~n6no49 911126 F~DR~-~66cK 05000255 F'DR G!