ML18057A633
| ML18057A633 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 11/30/1990 |
| From: | Handlovits S, Mlynarek M CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9012170079 | |
| Download: ML18057A633 (5) | |
Text
..
consumers Power POW ERi Nii MICHlliAN'S PRDliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 December 5, 1990 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of November 1990.
If you have any questions or concerns please feel free to contact me at (616) 764-8913, extension 0113.
Sincerely, MG Mlynarek Reactor Engineer CC:
DPHoffman, P26-117B TABuczwinski, Palisades ABDavis, USNRC JLKuemin, Palisades Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI SLHall, Michigan Dept of Labor, Lansing, MI RCallen, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades HRSnider, P21-129 Administrator, USNRC Document Control, 950*22*35*10/L File SMH90*016
-ro 121 ?oc>?'il -*?!)I 136 - ---
, PDR ADOCK 05000255 R*
PDR A CMS EIVERGY COMPANY J_ l '.': *'*l ** r :****
OPERATING STATUS:
- l.
UNIT NAME
- 2.
REPORTING PERIOD:
OPERATING DATA REPORT Palisades 901101-901130
- 3.
LICENSED THERMAL POWER (MWt) 2530.0
- 4.
NAMEPLATE RATING (GROSS MWe) 811.7
- 5.
DESIGN ELECTRICAL RATING (NET MWe) 805.0
- 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)
- 770
- 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWe)
- 730
- 8.
IF CHANGES OCCUR IN CAPCITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
- 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
- 11. HOURS IN REPORTING PERIOD
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-LINE
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERGY GENERATED (MWH)
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
- 19. UNIT SERVICE FACTOR
- 20. UNIT AVAILABILITY FACTOR
- 21. UNIT CAPACITY FACTOR (USING MDC NET)
- 22. UNIT CAPACITY FACTOR '(USING DER NET)
- 23. UNIT FORCED OUTAGE RATE
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MO~THS (TYPE, This Month 720.0 0.0 0.0 0.0 0.0 0.0 0.0%
0.0%
0.0%
0.0%
0.0%
DATE AND DURATION OF EACH):
Five month Refueling/Steam Generator Replacement Outage started September 15, Yr-to-Date 8016.0 5143.l 5075.2 10137072.0 3212350.0 3008095.0 63.3%
63.3%
- 51. 4%
46.6%
5.4%
1990.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: February 14, 1991
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
Forecast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on condenser backpressure
- Weighted Average (635 MWe used as MDC Net prior to October 1985)
DOCKET NO 50-255 DATE 11-30-90 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 NOTES:
Cumulative 166119.0 90201.1 86217.6 180752445.0 56636535.0 53298123.0 51.9%
- 51. 9%
48.7%*
39.9%
32.8%
Achieved
AVERAGE DAILY UNIT POWER LEVEL MONTH NOVEMBER 1990 DAY AVERAGE DAILY POWER LEVEL (MWe Net)
- 1.
0
- 2.
0
- 3.
0
- 4.
0
- 5.
0
- 6.
0
- 7.
0
- 8.
0
- 9.
0
- 10.
0
- 11.
0
- 12.
0
- 13.
0
- 14.
0
- 15.
0
- 16.
0 INSTRUCT IONS:
DAY
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
- 23.
- 24.
- 25.
- 26.
- 27.
- 28.
- 29.
- 30.
DOCKET NO ___
5=....;:0;._-=-2 5~5 UNIT Palisades DATE ---=1'-=21
...... 0'"""5'-'/ 9~0 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 AVERAGE DAILY POWER LEVEL (MWe Net) 0 0
0 0
0 0
- o 0
0 0
0 0
0 0
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.
Compute to the nearest whole megawatt.
REPORT MONTH NOVEMBER 1990 No.
Date Type 1 05 900915 s
- 1.
- 2.
F:
Forced S:
Scheduled Duration Reason2 (Hours) 720.0 c
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refue ling 0-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Event Shutting Down Reactor3 Report #
1 N/A
- 3.
- 4.
Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)
System Code4 Component Code5 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Cause & Corrective Action to Prevent Recurrence N/A
- 5.
DOCKET NO 50-255 UNIT Palisades DATE 12/05/90 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 Exhibit I - Same Source a
SUMMARY
OF OPERATING EXPERIENCE FOR NOVEMBER 1990 The Plant remained shutdown for refueling during the entire month of November.