ML18057A518

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1990 for Palisades Nuclear Plant
ML18057A518
Person / Time
Site: Palisades 
Issue date: 09/30/1990
From: Handlovits S, Mlynarek M
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9010160099
Download: ML18057A518 (5)


Text

consumers Power POW ERIN&

MICHl&AN'S PRO&RESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 October 4, 1990 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of September 1990.

If you have any questions or concerns please feel free to contact me at (616) 764-8913, extension 0113.

Sincerely, MG Mlynarek Reactor Engineer CC: DPHoffman, P26-117B TABuczwinski, Palisades ABDavis, USNRC JLKuemin, Palisades Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI SLHall, Michigan Dept of Labor, Lansing, MI RCallen, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades HRSnider, P21-129 Administrator, USNRC Document Control, 950*22*35*10/L File SMH90*011 A CMS ENERGY COMPANY

OPERATING DATA REPORT DOCKET NO 50-255 DATE 09-30-90 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 OPERATING STATUS:

NOTES:

1.

UNIT NAME Palisades

2.

REPORTING PERIOD:

900901-900930

3.

LICENSED THERMAL POWER (MWt) 2530.0

4.

NAMEPLATE RATING (GROSS MWe) 811.7

5.

DESIGN ELECTRICAL RATING (NET MWe) 805.0

6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)

    • 770
7.

MAXIMUM DEPENDABLE CAPACITY (NET MWe)

    • 730
8.

IF CHANGES OCCUR IN CAPCITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

10. REASONS FOR RESTRICTIONS, IF ANY:

625 (80%)

80% power limitation implemented based upon administrative guidelines with intent to improve steam generator reliability.

This Month Yr-to-Date Cumulative

11. HOURS IN REPORTING PERIOD 720.0 6551.0 164654.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 350.4 5143.1 90201.1
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE 350.l 5075.2 86217.6
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH) 704184.0 10137072.0 180752445.0
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 218330.0 3212350.0 56636535.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 204028.0 3008095.0 53298123.0
19. UNIT SERVICE FACTOR 48.6%

77.5%

52.4%

20. UNIT AVAILABILITY FACTOR 48.6%

77.5%

52.4%

21. UNIT CAPACITY FACTOR (USING MDC NET) 38.8%

62.9%

49.2%*

22. UNIT CAPACITY FACTOR (USING DER NET) 35.2%

57.0%

40.2%

23. UNIT FORCED OUTAGE RATE 0.0%

5.4%

32.8%

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

Five month Refueling/Steam Generator Replacement Outage started September 15, 1990.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: February 14, 1991
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

REPORT MONTH SEPTEMBER 1990 No.

Date 05 900915

1.

F:

Forced S:

Scheduled Type1 Duration Reason2 s

2.

(Hours) 369.9 c

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor3 Report 1; 1

N/A

3.

Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)

4.

System Component Code4 Code5 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report CLER) File (NUREG-0161)

DOCKET NO ---~50~-~2~5~5 UNIT ~~P~a=l=i~s=a=d~e=s DATE ---=lc:.0._/0""'1""/-=9"'-0 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 Cause & Corrective Action to Prevent Recurrence N/A

5.

Exhibit I - Same Source

MONTH SEPTEMBER 1990 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 10/01/90 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe Net)

I.

589

17.

0

2.

588

18.

0

3.

593

19.

0

4.

588

20.

0

5.

582

21.

0

6.

580

22.

0

7.

587

23.

0

8.

597

24.

0

9.

594

25.

0

10.

586

26.

0

11.

591

27.

0

12.

587

28.

0

13.

587

29.

0

14.

588

30.

0

15.

265

16.

0 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole megawatt.

SUMMARY

OF OPERATING EXPERIENCE FOR SEPTEMBER 1990 Power was maintained at 80% until September 15 when at 0816 the reactor power was decreased at 12% per hour to shutdown for a scheduled 150 day outage to refuel the reactor and replace the steam generators.

The plant was offline by 1404 and the reactor was subcritical at 1423.