1.
2.

TABLE 2. 3.-1 Reactor Protective System Trip -Setting Limits Varia~tJ High

. Power Primary Coolant Flow ( 2)

Four Primary Coolant

- - - Pumps Operating -

~10% above core power, with a minimum setpoint of ~30% of rated power and a maximum of :ii106. 5%

of rated power

!?:95% of Primary Coolant Flow With Four Pumps Operating Three Primary Coot~yt

-- -Pumps Operating

~10% above ~,qrn power with a minimum setpoint of ~15% rat~.d.:: power and a maxim~.nu ~f :ii4 9%

of rated power

!?:60% of PriJ!l.a~y Cool-ant Flow With Four Pumps Operating

3.

High Pressure Pressurizer

~2255 Psia

ii2255 Psia
4.

Thermal ¥2r§fn/Low Pressure Ptrip !?: Applicable Limits Replaced by )l;a;iable High Power Trip and 1750 Psia Minimum Low-Pressure Setting

5.
6.
7.

(1)

(2)

(3)

(4)

Steam Generator Not Lower Than the Cen-Not Lower Than the Cen-Low Water Level ter Line of Feed-Water ter Line of Feed-Water Ring Ring Steam Generat~)

!?:500 Psia 1?:500 Psia Low Pressure Containment High

ii3.70 Psig
ii3.70 Psig Pressure The VHPT can be 30% of rated power for power levels :ii 20% of iz,q_t~d power.

_4 May be bypassed below 10

% of rated power provided auto bypass removal circuitry is operable.

For low power physics tests, thermal margin/low pressure, primary coolant flow and low steam generator pressure trips may be bypassed until their react points are reached (approximately 1750 psia and SQ~ psia, respectively), provided automatic bypass removal circuitry at 10

% rated power is operable.

Minimum trip setting shall be 1750 psia.

Operation with three pumps for a maximum of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is permitted to provide a limited time for repair/pump restart, to provide for an orderly shutdown or to provide for the conduct of reactor internals noise monitoring test measurements.

90083001 so 90082

) {

  • ~I

~DR ADOCK 05000~ssLJ* _,j_.

  • PNU

~ ~ -

2-5 Amendment No it, S0, llS TSP0690-0181-NL04 I

I I

TSP0690-0181-NL04 ATTACHMENT Consumers Power Company Palisades Plant Docket 50-255 MARKED UP TECHNICAL SPECIFICATION PAGE August 21, 1990 1 Page

..t

l.
2.
3.
4.

TABLE 2.3.l Reactor Protective System Trip Setting Limits Varia~t1 High.

Power Primary

  • Coolant Flow<2>

High Pressure Pressurizer Thermal ¥!r§fn/Low Pressure Four Primary Coolant Pumps Operating

iil0% above core power, with a minimum setpoint of S30% of rated power and a maximum of :iil06.5%

of rated power

~95%. of Primary Coolant Flow With Four Pumps Operating

ii2255 Psia P

~ Applicable Limits trip Three Primary Cootft~t Pumps Operating S10% above core power with a minimum setpoint of Sl5% rated power and a maximum of :ii49%

of rated power

~60% of Primary Cool-ant Flow With Four Pumps Operating

ii2255 Psia Replaced by Variable High Power Trip and 1750 Psia Minimum Low-*

Pressure Setting

5.

Steam Generator Low Water Level Not Lower Than the Cen-ter Line of Feed~Water Ring Wltieh Is Located 6' 9" Below No1mal Water LeJJel Not Lower Than the Can-*

ter Line of Feed-Water Ring Which Is te6ated

/

6' 9" Belew Nemal.

f Water Level

/

6.

Steam Generaf~j Low Pressure

~500 Psia

~500 Psia

7.

Containment High Pressure SJ. 70 Psig SJ.70 Psig (1)

(2)

(3)

(4)

The VHPT can be 30% of rated power.for power levels :ii 20% of rated power.

_4 May be bypassed below 10 % of rated power provided auto bypass removal circuitry is operable. For lov power physics tests, thermal margin/low.

pressure. primary coolant flov and lov steam generator pressure trips ma,--*

be bypa*aed until their react points are reached (approximately 1750 psia and 5~ p*ia. respectively), provided automatic bypass removal circuitry at 10 I rated power is operable.

Minimua trip setting shall be 1750 psia.

  • Operation with.three pumps for a maximum of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is permitted to provide a limited time for repair/pump restart, to provide for an orderly shutdown or to provide for the conduct of reactor internals noise monitoring test measurements.

2-5 Amendment No Jt, 89, /_tj, Novambe!' U, 1988