Text
.,*
~~-- -
[f!omsumers
!f>>~wer POW ERi Nii MICHlliAN"S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 March 8, 1990 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of February 1990.
~
~.
George Goralski Reactor Engineer CC: DPHoffman, P26-117B TABuczwinski, Palisades ABDavis, USNRC KWBerry/RRFrisch, P24-614A Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI SLHall, Michigan Dept of Labor, Lansing, MI RCallen, Michigan Public Service Commission Records Center, INPO*, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades HRSnider, P-21-129 Administrator, USNRC Document Control, 950*22*35*10/L MGM90*008 A Cll/IS ENERGY COMPANY
OPERATING DATA REPORT DOCKET NO 50-255 DATE 02-28-90 COMPLETED BY MGMlynarek TELEPHONE (616)764-8913 OPERATING STATUS:
NOTES:
- 1.
UNIT NAME Palisades
- 2.
REPORTING PERIOD:
900201-900228
- 3.
LICENSED THERMAL POWER (MWt) 2530.0
- 4.
NAMEPLATE RATING (GROSS MWe) 811.7
- 5.
DESIGN ELECTRICAL RATING (NET MWe) 805.0
- 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)
- 770
- 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWe)
- 730
- 8.
IF CHANGES OCCUR IN CAPCITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
- 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
- 10. REASONS FDR RESTRICTIONS, IF ANY:
625 (80%)
80% power limitation implemented based upon administrative guidelines with intent to improve steam generator reliabilit~
This Month Yr-to-Date Cumulative
- 11. HOURS IN REPORTING PERIOD 672.0 1416.0 159519.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 666.4 1378.4 86436.4
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS, GENERATOR ON-LINE 666.4 1365.2 82507.6
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1352352.0 2725200. 0 173340573.0
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 439390.0 882600.0 54305805.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 412602.D 827620.0 51117648.0
- 19. UNIT SERVICE FACTOR 99.2%
96.4%
- 51. 7%
- 20. UNIT AVAILABILITY FACTOR 99.2%
96.4%
- 51. 7%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 84.1%
80.1%
48.9%*
- 22. UNIT CAPACITY FACTOR (USING DER NET) 76.3%
72.6%
39.8%
- 23. UNIT FORCED OUTAGE RATE 0.8%
3.6%
33.7%
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
30 day Scheduled Maintenance Outage to start April 16, 1990 in preparation for Fall 1990 Steam Generator replacement.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
03/03/90
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on condenser backpressure
- Weighted Average (635 MWe used as MDC Net prior to October 1985)
~VERAGE DAILY UNIT POWER LEVEL tit DOCKET NO 50-255 UNIT Palisades DATE 03-08-90 COMPLETED BY MGMlynarek TELEPHONE (616)764-8913 MONTH __
F_E_BR_U_AR_Y--'19""""9.....;.0 __ _
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 618 17 620 2
626 18 620 3
621 19 621 4
621 20 620 5
617 21 620 6
617 22 619 7
617 23 620 8
620 24 619 9
616 25 620 10 621 26 617 11 621 27 618 12 620 28 467 13 618 14 620 15 620 16 620 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
OC0185-0001C-OP03
REPORT MONTH FEBRUARY 1990 No.
Date Type1 02 900228 -
F
- 1.
- 2.
F:
Forced S: Scheduled OC0185-0001D-OP03 Duration Reason2 (Hours) 5.6 H
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor3 Report #
3 LER 90007
- 3.
Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)
- 4.
System Code4 Component Code5 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
DOCKET NO.
50-255 UNIT NAME Palisades DATE ____
0;...;;.3_-0"""8--9~0 COMPLETED BY ___
M_G_M~ly~n_ar_e_k TELEPHONE (616)-764-8913 Cause & Corrective Action to Prevent Recurrence Automatic Variable High Power -
trip following trip of 'B' train main feedwater pump (PlB)
- 5.
Exhibit I - Same Source
SUMMARY
OF OPERATING EXPERIENCE FOR FEBRUARY 1990 Palisades began the month of February with reactor power being maintained at 80%.
On February 28 at 1820 hours0.0211 days <br />0.506 hours <br />0.00301 weeks <br />6.9251e-4 months <br /> PlB (B-main feedwater pump) tripped offline and at 1825 hours0.0211 days <br />0.507 hours <br />0.00302 weeks <br />6.944125e-4 months <br /> an automatic Variable High Power Trip (VHPT) occurred from 59% power resulting in Palisades being in Hot Shutdown at the end of the month.
OC0185-0001E-OP03