Docket No. 50-255 Serial No. PAL-90-013
- Mr. Kenneth W. Berry Director, Nuclear Licensing Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201
Dear Mr. Berry:
February 16, 1990 DISTRIBUTION Docket Fi 1 e NRC & Local PDRs PD31 Reading JZwolinski MRShuttleworth ADeAgazio r'k ~
. - /t;t2,
EJordan ACRS(lO)
SUBJECT:
TRANSMITTAL OF DRAFT REPORT RELATED TO BLOCK VALVE AND PILOT-OPERATED RELIEF VALVE TESTS (TAC 75926)
Enclosed is a draft copy of a Technical Evaluation Report prepared for the NRC by the Idaho National Engineering Laboratory (INEL).
The report presents an analysis of the testing performed on the Palisades Plant pilot-operated relief valve and block valve at the Wylie Laboratories in December 1989.
This is the report that I committed to provide to Consumers Power Company in my letter dated February 9, 1990 (PAL-90-011).
Enclosure:
Sincerely, Original ~gne<J by Albert W. De Agazio, Sr. Project Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V & Special Projects Office of Nuclear Reactor Regulation INEL Technical Evaluation Report cc w/enclosure:
See next page PM/PD311 ADeAgazio 02/y/90
~Jr!y/
(A)D/PD3l:D~...
JThoma 02/l'?'/90
1_
'.l UNITED STATES
- NUCLEAR REGULATORY COMMISSION Docket No. 50-255 Serial No. PAL-90-013 Mr. Kenneth W. Berry Director, Nuclear Licensing Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201
Dear Mr. Berry:
WASHINGTON, D. C. 20555 February 16, 1990
SUBJECT:
TRANSMITTAL OF DRAFT REPORT RELATED TO BLOCK VALVE AND PILOT-OPERATED RELIEF VALVE TESTS (TAC 75926)
Enclosed is a draft copy of a Technical Evaluation Report prepared for the NRC by the Idaho National Engineering Laboratory (INEL).
The report presents an analysis of the testing performed on the Palisades Plant pilot-operated relief valve and block valve at the Wylie Laboratories in December 1989.
This is the report that I committed to provide to Consumers Power Company in my letter dated February 9, 1990 (PAL-90-011).
Enclosure:
INEL Technical Evaluation Report cc w/enclosure:
See next page Sincerely, A~~ct Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V & Special Projects Office of Nuclear Reactor Regulation
Mr. Kenneth W. Berry Consumers Power Company cc:
M. I. Miller, Esquire Sidley & Austin 54th Floor One First National Plaza Chicago, Illinois 6060~
Mr. Thomas A. McNish, Secretary Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Judd L. Bacon, Esquire Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Regional Administrator, Region III U~S. Nuclear Regulatory Corrmissfon 799 Roosevelt Road Glen Ellyn, Illinois 60137 Jerry Sarno Township Supervisor Covert Township 36197 M-140 Highway Covert, Michigan 49043 Office of the Governor Room 1 - Capitol Building Lansing, Michigan 48913 Mr. Gerald B. Slade Plant General Manager Palisades Plant 27780 Blue Star Memorial Hwy.
Covert, Michigan 49043 Resident Inspector c/o U.S. Nuclear Regulatory Corrmission Palisades Plant 27782 Blue Star Memorial Hwy.
Covert, Michigan 49043 Palisades Plant Nuclear Facilities and Environmental Monitoring Section Office.
Division of Radiological Health P.O. Box 30035 Lansing, Michigan 48909