ML18054B379
| ML18054B379 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 01/18/1990 |
| From: | De Agazio A Office of Nuclear Reactor Regulation |
| To: | Berry K CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| References | |
| GL-88-20, PAL-90-009, PAL-90-9, TAC-74444, NUDOCS 9001230204 | |
| Download: ML18054B379 (3) | |
Text
January 18, 1990 DISTRIBUTION:
Docket No. 50-255 PAL-90-009 Dockef"Fi 1 e NRC & Local PDRs PD31 Reading JZwolinski PShuttleworth ADeAgazio ACRS(lO)
MBoyle JFlack Mr. Kenneth
~J. Berry Director, Nuclear Licensing Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201
Dear Mr. Berry:
OGC EJordan
SUBJECT:
REVIEW OF 60-DAY RESPONSE TO GENERIC LETTER 88-20, INDIVIDUAL PLANT EXAMINATIONS (IPE) (TAC NO. 74444)
Re:
Palisades Plant Generic Letter 88-20 requires, in parts that each operating reactor licensee and construction permit holder:
(1) identify the approach and method selected for performing the IPE, (2) describe the method to be used~ and (3) identify the schedule for performing the IPE and submitting the results to the NRC.
This information was to be submitted to the NRC within 60 days of issuance of Supplement 1 of the generic letter.
We have reviewed your letter dated October 27, 1989, submitted in response to the reporting requirements of the generic letter.
We conclude that your IPE approach, methodology, and schedule are acceptable.
We anticipate that any possible additional analysis or reporting requirements 9 such as those from external events or from the Containment Performance Improvement Program, will not have any adverse effect on your schedule.
However 9 if your schedule should change, please notify the NRC of the proposed change and the reason for the change.
Should you have any questions concerning the requirements of the generic letter, please contact Mr. Michael L. Boyle, NRR at (301) 492-1308 or Mr. John H. Flack, RES at (301) 492-3979.
Sincerely, Origlnar Sigoed bY A. De Agazio, Sr. Project Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V & Special Projects Office of Nuclear Reactor Regulation
_ / cc: See next page
!)P/
~0f/1 (4)) PM/PD31: DRSP: CH
~!!/;'/ ADeAgaz10 1/ /90 (lU0/~31 :DRSP
.n::fio' l/J? I o
-~
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Docket No. 50-255 PAL-90-009 Mr. Kenneth W. Berry Director, Nuclear Licensing Consumers Power Company 1945.West Parnall Road Jackson, Michigan 49201
Dear Mr. Berry:
January 18, 1990 REVIEW OF 60-DAY RESPONSE TO GENERIC LETTER 88-20, INDIVIDUAL PLANT EXAMINATIONS (IPE) (TAC NO. 74444)
Re:
Palisades Plant Generic Letter 88-20 requires, in part, that each operating reactor licensee and construction permit holder:
(1) identify the approach and method selected for performing the IPE, (2) describe the method to be used, and (3) identify the schedule for performing the IPE and submitting the results to the NRC.
This informatior1 was to be submitted to the NRC within 60 days of issuance of Supplement 1 of the generic letter.
We have reviewed your letter dated October 27, 1989, submitted in response to the reporting requirements of the generic letter.
We conclude that your IPE approach, methodology, and schedule are acceptable.
We anticipate that any possible additional analysis or reporting requirements, such as those from external events or from the Containment Performance Improvement Program, will not have any adverse effect on your schedule.
However, if your schedule should change, please notify the NRC of the proposed change and the reason for the change.
Should you have any questions concerning the requirements of the generic letter, please contact Mr. Michael L. Boyle, NRR at (301) 492-1308 or Mr. John H. Flack, RES at (301) 492-3979.
cc: See next page Sincerely,
~~
A. De Agazio, Sr. Project Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V & Special Projects Office of Nuclear Reactor Regulation
l Mr. Kenneth W. Berry Consumers Power Company cc:
M. I. Miller, Esquire Sidley & Austin 54th Floor One First National Plaza Chicago, Illinois 60603 Mr. Thomas A. McNish, Secretary Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Judd L. Bacon, Esquire Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Regional Administrator, Region III U.S. Nuclear Regulatory Co1Ttnission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Jerry Sarno Township Supervisor Covert Township 36197 M-140 Highway Covert, Michigan 49043 Office of the Governor Room 1 - Capitol Building Lansing, Michigan 48913 Mr. Gerald B. Slade Plant General Manager Pa 11 sades Pl ant 27780 Blue Star Memorial Hwy.
Covert, Michigan 49043 Resident Inspector c/o U.S. Nuclear Regulatory ColTITiission Pa 1i sades Pl ant 27782 Blue Star Memorial Hwy.
Covert, Michigan 49043 Palisades Plant Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health P.O. Box 30035 Lansing, Michigan 48909