consumers Power PDWERINli MICHlliAN'S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 December 4, 1989 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of November, 1989.
~~
George Goralski Reactor Engineer CC: DPHoffman, P26-117B KMHaas, Palisades ABDavis, USNRC KWBerry/RRFrisch, P24-614A DMOnken, Palisades Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI SLHall, Michigan Dept of Labor, Lansing, MI RCallen, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades HRSnider, P-21-129 Administrator, USNRC Document Control, 950*22*35*10/L MGM89*032 OC0185-0001A-OP03 A CMS ENERGY COMPANY
OPERATING DATA REPORT OPERATING STATUS
- 1.
Unit Name: Palisades
~~~~~~~~~~~~~~~~~~~
- 2.
Reporting Period:
891101-891130
- 3.
Licensed Thermal Power (MWt):
2530
- 4.
Nameplate Rating (Gross MWe):
811.7
- 5.
Design Electrical Rating (Net MWe):
805
- 6.
Maximum Dependable Capacity (Gross MWe): -k-k770
- 7.
Maximum Dependable Capacity (Net MWe):
-k-k730 DOCKET NO DATE 50-255 12/04/89 COMPLETED BY MGMlynarek TELEPHONE (616)764-8913 NOTES
- 8.
If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:
- 9.
Power Level to Which Restricted, if any (Net MWe):
625 (80%)
- 10.
Reasons for Restrictions, if any:
80% power limitation implemented based upon administrative guidelines with intent to improve steam generator reliability (not based upon regulatory requirements).
This Month Yr-to-Date Cumulative
- 11.
Hours In Reporting Period 720.0 8 2016.0 157 2359.0
- 12.
Number of Hours Reactor Was Critical o.o 5 2 781.1 84 2788.5
- 13.
Reactor Reserve Shutdown Hours
- 14.
Hours Generator On-Line o.o 5 2755.2 80 2877.3
- 15.
Unit Reserve Shutdown Hours
- 16.
Gross Thermal Energy Generated (MWH) o.o 11 2562 2 168 170 2113 2173
- 17.
Gross Electrical Energy Generated (MWH) o.o 3 2716 2 700 53 2261 2185
- 18.
Net Electrical Energy *Generated (MWH) o.o 3 2486 2110 50 2138 2359
- 19.
Unit Service Factor o.o 71.8 51.4
- 20.
Unit Availability Factor o.o 71.8 51.4
- 21.
Unit Capacity Factor (Using MDC Net) 0.0 59.6
- 48.7
- 22.
Unit Capacity Factor (Using DER Net) 0.0 54.0 39.6
- 23.
Unit Forced Outage Rate 15.6 13.6 33.9
- 24.
Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of Each):
30 day schedule Maintenance Outage in preparation for fall 1989 Steam Generator replacement to start March 2 2 1989.
- 25.
If Shut Down at End of Report Period, Estimated Date of Start Up:
December 23 2 1989
- 26.
Units in Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on condenser backpressure Forecast
- Weighted Average (635 MWe used as MDC Net prior to October 1985)
OC0185-0001B-OP03 Achieved
A~GE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 12-04-89 COMPLETED BY MGMlynarek TELEPHONE (616)764-8913 MONTH NOVEMBER 1989
~~~~~~~~~~
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
16 0
INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
OC0185-0001C-OP03
REPORT MONTH __
N"""""O-'VE_M_BE_R---'-'19'-'8-"-9 __
No.
Date Type1 04 891001 s
05 891126 F
- 1.
- 2.
F:
Forced S: Scheduled OC0185-0001D-OP03 Duration Reason2 (Hours) 608 B
112 A
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee System Component Shutting Event Code4 Code5 Down Reactor3 Report #
1 Not Yet Written
- 3.
Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)
- 4.
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
DOCKET NO.
50-255 UNIT NAME ____
P-'-a_l 1"'""'*
s-'-a~de'-"-s DATE 12-04-89 COMP LE TED BY ____
M_GM_l-"-y--'na-'-r--'e_k TELEPHONE (616)-764-8913 Cause & Corrective Action to Prevent Recurrence Scehduled Maintenance Outage - Steam Generator Repair Investigation and Resolution of PORV Malfunction (Cause and Corrective Action To be Determined)
- 5.
Exhibit I - Same Source
I
SUMMARY
OF OPERATING EXPERIENCE FOR NOVEMBER, 1989 Palisades remained shutdown during the reporting period.
Due to problems encountered November 21 with a PORV, (reference Palisades Event Report E-PAL-89-053), a scheduled online date of Novembe~ 26 was not realized.
The present Maintenance Outage duration subsequent to this November 26 date has been reclassified as forced.
OC0185-0001E-OP03
,