Monthly Operating Rept for Oct 1989 for Palisades Nuclear Plant
ML18054B098
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/31/1989
From: Goralski G, Mlynarek M
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8911170090
Download: ML18054B098 (5)


Text

consumers Power POW ERi Nii MICHIGAN'S PRDliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway. Covert, Ml 49043 November 2, 1989 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of October, 1989.

~~-

George Goralski Reactor Engineer CC: DPHoffman, P26-117B KMHaas, Palisades ABDavis, USNRC KWBerry/RRFrisch, P24-614A DMOnken, Palisades Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI SLHall, Michigan Dept of Labor, Lansing, MI RCallen, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades HRSnider, P-21-129 Administrator, USNRC Document Control, 950*22*35*10/L MGM89*030 OC0185-0001A-OP03 A CMS EIVERGY COMPANY

OPERATING DATA REPORT OPERATING STATUS

1.

Unit Name: Palisades

~~~~~~~~~~~~~~~~~~~

2.

Reporting Period:

891001-891031

3.

Licensed Thermal Power (MWt):

2530

4.

Nameplate Rating (Gross MWe):

811.7

5.

Design Electrical Rating (Net MWe):

805

6.

Maximum Dependable Capacity (Gross MWe):

~-k770

7.

Maximum Dependable Capacity (Net MWe):

~'"*730 DOCKET NO DATE 50-255 11/02/89 COMPLETED BY MGMlynarek TELEPHONE (616)764-8913 NOTES

8.

If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:

9.

Power Level to Which Restricted, if any (Net MWe):

623 (80%)

10.

Reasons for Restrictions, if any:

80% power limitation implemented based upon administrative guidelines with intent to improve steam generator reliability (not based upon regulatory reguirements).

This Month Yr-to-Date Cumulative

11.

Hours In Reporting Period 745.0 72296.0 1562639.0

12.

Number of Hours Reactor Was Critical 1.6 52781.1 842788.5

13.

Reactor Reserve Shutdown Hours

14.

Hours Generator On-Line 1.0 52755.2 80 2877.3

15.

Unit Reserve Shutdown Hours

16.

Gross Thermal Energy Generated (MWH) 504.0 1125622168 1 70 2113 21 73

17.

Gross Electrical Energy Generated (MWH) 80.0 32 7162 700 5322612185

18.

Net Electrical Energy Generated (MWH) o.o 324862110 5021382359

19.

Unit Service Factor 0.1 78.9 51.6

20.

Unit Availability Factor 0.1 78.9 51.6

21.

Unit Capacity Factor (Using MDC Net) o.o 65.5

  • 48.9
22.

Unit Capacity Factor (Using DER Net) o.o 59.4 39.8

23.

Unit Forced Outage Rate o.o 12.2 33.9

24.

Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of Each):

25.

If Shut Down at End of Report Period, Estimated Date of Start Up:

November 21, 1989

26.

Units in Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure Forecast
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

OC0185-0001B-OP03 Achieved

AVERAGE DAILY UNIT POWER LEV~

DOCKET NO 50-255 UNIT Palisades DATE 11-02-89 COMPLETED BY MGMlynarek TELEPHONE (616)764-8913 MONTH OCTOBER 1989

~~~~~~~~~~

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

16 0

INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

OC0185-0001C-OP03

REPORT MONTH OCTOBER 1989

~---------

No.

Date Type1 04 891001 s

1.
2.

F:

Forced S: Scheduled OC0185-0001D-OP03 Duration Reason2 (Hours) 744 B

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor3 Report #

1

3.

Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)

4.

System Code4 Component Code5 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

DOCKET NO.

50-255 UNIT NAME Palisades DATE ----=11-"----"0"""2---'8~9 COMP LET ED BY ___

M_G_M~l y~n_a_re_k TELEPHONE (616)-764-8913 Cause & Corrective Action to Prevent Recurrence Scehduled Maintenance Outage - Steam Generator Repair

5.

Exhibit I - Same Source

_,\\

SUMMARY

OF OPERATING EXPERIENCE FOR OCTOBER, 1989 Palisades was taken offline at 0057 hours6.597222e-4 days <br />0.0158 hours <br />9.424603e-5 weeks <br />2.16885e-5 months <br /> on October 1 with the reactor sub-critical at 0135 hours0.00156 days <br />0.0375 hours <br />2.232143e-4 weeks <br />5.13675e-5 months <br /> starting the fifty-two day scheduled Maintenance Outage for steam generator repair.

Palisades remained offline at the end of the reporting period.

OC0185-0001E-OP03