C[lnsumers Power POWERINli MICHlliAN'S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 September 7, 1989 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of.August,_ 1989.

~~

George Goralski Reactor Engineer CC: DPHoffman, P26-117B KMHaas, Palisades ABDavis, USNRC KWBerry/RRFrisch, P24-614B CSKozup, Palisades Resident Inspector, Palisades DLHackett, Pll-4208 DRHahn, Div of Rad Health Services, Lansing, MI SLHall, Michigan Dept of Labor, Lansing, MI RCallen, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades LLBumb, P21-135 GBSzczotka, P-21-135A HRSnider, P-21-129 Administrator, USNRC Document Control, 950*22*35*10/L MGM89*024 OC0185-0001A-OP03 A CMS ENERGY COMPANY

OPERATING DATA REPORT DOCKET NO 50-255

~~~~~~-

DATE 09-07-89

~~~~~~-

COMPLETED BY MGMlynarek TELEPHONE (616)764-8913 OPERATING STATUS NOTES

1.

Unit Name: Palisades

~~~~~~~~~~~~~~~~~~~

2.

Reporting Period:

890801-890831

3.

Licensed Thermal Power (MWt):

2530

4.

Nameplate Rating (Gross MWe):

811.7

5.

Design Electrical Rating (Net MWe):

805

6.

Maximum Dependable Capacity (Gross MWe): *'k770

7.

Maximum Dependable Capacity (Net MWe):

~'*730

8.

If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:

9.

Power Level to Which Restricted, if any (Net MWe):

623 (80%)

10.

Reasons for ~estrictions, if any:. 80% power limitation implemented based upon administrative guidelines with intent to improve steam generator reliability (not

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.

based upon regulatory requirements).

Hours In Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours This Month 744.0 687.6 679.2 Yr-to-Date 5,831.0 5,059.5 5,034.2 Gross Thermal Energy Generated (MWH) 1,341,864 10,108,320 Gross Electrical Energy Generated (MWH) 425,250 3,249,250 Net Electrical Energy Generated (MWH) 397,517 3,047,505 Unit Service Factor 91.3 86.3 Unit Availability Factor 91.3 86.3 Unit Capacity Factor (Using MDC Net) 73.2 71.6 Unit Capacity Factor (Using DER Net) 66.4 64.9 Unit Forced Outage Rate 8.7 13.7 Cumulative 155,174.0 84,066.9 80,156.3 168,659,325 52,793,735 49,699,754 51.7 51.7

  • 49.0 39.8 34.1 Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of Each):

45 day scheduled maintenance outage for steam generator repair to start October 1 1989.

If Shut Down at End of Report Period, Estimated Date of Start Up:

Units in Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure Forecast
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

Achieved OC0185-0001B-OP03

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 09-07-89 COMPLETED BY MGMlynarek TELEPHONE (616)764-8913 MONTH AUGUST 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 603 17 608 2

602 18 611 3

592 19 609 4

482 20 599 5

0 21 602 6

0 22 595 7

66 23 596 8

325 24 607 9

609 25 609 10 604 26 609 11 609 27 603 12 603 28 601 13 605 29 595 14 601 30 603 15 603 31 602 16 612 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

OC0185-0001C-OP03

REPORT MONTH ___

A_UG_U_S_T _1_98_9 __ _

No.

Date Type1 03 890804 F

1.
2.

F:

Forced S: Scheduled OC0185-0001D-OP03 Duration Reason2 (Hours) 64.8 A

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor3 Report #

3

3.

Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)

System Component Code4 Code5

4.
    • Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

DOCKET NO.

50-255 UN IT NAME ____

.:....P=-a l.:...:i:..::s.:::ad=-e=s DATE ____

0_9_-0'--7--8'-9 COMP LET ED BY ---'--MG'--M'""l y"-'nc.:.a.:....re=-k TELEPHONE (616)-764-8913 Cause & Corrective Action to Prevent Recurrence Blown fuse in 118 11 Steam Generator level control circuit

5.

Exhibit I - Same Source

SUMMARY

OF OPERATING EXPERIENCE FOR AUGUST, 1989 Palisades began the month of August with power maintained at 80%.

On August 4 at 1949 hours0.0226 days <br />0.541 hours <br />0.00322 weeks <br />7.415945e-4 months <br />, the reactor underwent an automatic trip while DC ground trouble-shooting was being performed.

During transfer of preferred AC Bus Y20 to the Bypass Regulator, a fuse blew in the "B" Steam Generator level control circuit resulting in a loss of feed to the "B" Steam Generator.

Consequently, the reactor tripped 9n "B" Steam Generator low level.

The reactor was returned to critical at 10-4% power on August 7 at 0415 hours0.0048 days <br />0.115 hours <br />6.861772e-4 weeks <br />1.579075e-4 months <br /> with the main generator being synchronized to the grid at 1238 hours0.0143 days <br />0.344 hours <br />0.00205 weeks <br />4.71059e-4 months <br />.

Reactor power reached 80% on August 9 at approximately 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />, and this level was maintained for the remainder of the month.

OC0185-0001E-OP03