OPERATING DATA REPORT DOCKET NO 50-255 DATE 03-08-88 COMPLETED BY GCPackard TELEPHONE (616)764-8913 OPERATING STATUS NOTES

1.

Unit Name: Palisades

--:---~..;;._;;_.;;;.___ ____________

~

2.

Reporting Period:

880201-880229

3.

Licensed Thermal Power (MWt):

2530

4.

Nameplate Rating (Gros~ MWe):

811.7

5.

Design Electrical Rating (Net MWe):

805

6.

Maximum Dependable Capacity (Gross MWe):

~-k770

7.

Maximum Dependable Capacity (Net MWe):

~'*730

8.

If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:

9.

Power Level to Which Restricted, if any (Net MWe):

10.

Reasons for Restrictions, if any:

This Month

11.

Hours In Reporting Period 696.0

12.

Number of Hours Reactor Was Critical 696.o

13.

Reactor Reserve Shutdown Hours

14.

Hours Generator On-Line 696.0.

15.

Unit Reserve Shutdown Hours

16.

Gross Thermal Energy Generated (MWH) lz484z904

17.

Gross Electrical Energy Generated (MWH) 480z525

18.

Net Electrical Energy Generated (MWH) 453z316

19.

Unit Service Factor 100.0

20.

Unit Availability Factor 100.0

21.

Unit Capacity Factor (Using MDC Net) 89.2

22.

Unit Capacity Factor (Using DER Net) 80.9

23.

Unit Forced Outage Rate o.o

24.

Shutdowns Scheduled Over Next Six Months (Type, Date and Yr-to-Date lz440.0 830.2 800.8 lz689z480 546zl65 514z513 55.6 55.6 48.9 44.4 44.4 Duration of

25.

If Shut Down at End of Report Period, Estimated Date of Start Up:

26.

Units in Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure Forecast
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

OC0185-0001B-OP03 Cumulative 14lz999.0 74z847.2 71 z067.0 148 z877 z397 46z459z685 43 2731 2547 50.0 50.0

  • 47.8 38.3 36.0 Each):

Achieved

~VERAGE DAILY UNIT POWER LEVEL ~

DOCKET NO 50-255 UNIT Palisades DATE 03-08-88 COMPLETED BY GCPackard TELEPHONE (616)764-8913 MONTH February 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 779 17 725 2

588 18 224 3

267 19 228 4

725 20 268 5

777 21 335 6

778 22 336 7

778 23 406 8

778 24 754 9

778 25 779 10 779 26 780 11 781 27 782 12 781 28 779 13 782 29 779 14 780 15 781 16 780 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

OC0185-0001C-OP03

REPORT MONTH FEBRUARY 1988


~

No.

Date Type1 16 88020?

F 17 880217 s

1.
2.

F:

Forced S:

Scheduled OC0185-0001D-OP03 Duration Reason2 (Hours) 24.6 A

68.5 H

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor3 4

4

3.

Report #

Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)

4.

System Code4 Component Code5 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

DOCKET NO.

50-255 UNIT NAME Palisades DATE 03-08-88 COMPLETED BY GCPackard TELEPHONE (616)-764-8913 Cause & Corrective Action to Prevent Recurrence Power reduction due to steam e

leak on vent line from MSR-E-9C.

Power reduction due to boric acid chemistry soak to steam generators.

5.

Exhibit I - Same Source

l __

SUMMARY

OF OPERATING EXPERIENCE FOR FEBRUARY 1988 The plant was operating at 100 percent power when on February 2 at 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> the plant reduced power to 35 percent power to repair a steam leak on a vent line from MSR-E-9C.

The plant returned to 100 percent power on February 4.

On February 17, the plant reduced power to 35 percent for a boric acid chemistry soak to the steam generators.

The plant returned to 100 percent power on February 24 and remained at this power through the end of the reporting period.

OC0185-0001E-OP03

consumers

!?lower POW ERIN&

MICHl&AN'S PROGRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 March 8, 1988 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of February, 1988.

~~-

George Goralski Reactor Engineer CC: KMHaas, Palisades ABDavis, USNRC KWBerry, P24-614B CSKozup, Palisades Resident Inspector, Palisades DLHackett, Pll-420B MALapinski, P21-332 GWBruckmann, Div of Radiological Health Services, Lansing, Michigan SLHall, Michigan Dept of Labor RCallen, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades LLBumb, P21-324 GBSzczotka, P-21-311B HRSnider, P-21-326 Administrator, USNRC Document Control, 950*22*35*10/L GCP88-009 OC0185-0001A-OP03 A CMS ENERGY COMPANY