Monthly Operating Rept for May 1988 for Palisades Nuclear Plant
ML18053A411
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/31/1988
From: Goralski G, Packard G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8806160324
Download: ML18053A411 (5)


Text

OPERATING DATA REPORT OPERATING STATUS

1.

Unit Name: Palisades

~~~~~~~~~~~~~~~~~~-

2.

Reporting Period:

880501-880531

3.

Licensed Thermal Power (MWt):

2530

4.

Nameplate Rating (Gross MWe):

811.7

5.

Design Electrical Rating (Net MWe):

805

6.

Maximum Dependable Capacity (Gross MWe): *"k770

7.

Maximum Dependable Capacity (Net MWe):

~'*730 DOCKET NO DATE 50-255 06-08-88 COMPLETED BY GCPackard TELEPHONE (616)764-8913 NOTES

8.

If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:

9.

Power Level to Which Restricted, if any (Net MWe):

10.

Reasons for Restrictions, if any:

This Month

11.

Hours In Reporting Period 744.0

12.

Number of Hours Reactor Was Critical 722.7

13.

Reactor Reserve Shutdown Hours

14.

Hours Generator On-Line 715.4

15.

Unit Reserve Shutdown Hours

16.

Gross Thermal Energy Generated (MWH) 1 2731 2336

17.

Gross Electrical Energy Generated (MWH) 554 2590

18.

Net Electrical Energy Generated (MWH) 525 2784

19.

Unit Service Factor 96.2

20.

Unit Availability Factor 96.2

21.

Unit Capacity Factor (Using MDC Net) 96.8

22.

Unit Capacity Factor (Using DER Net) 87.8

23.

Unit Forced Outage Rate 3.8

24.

Shutdowns Scheduled Over Next Six Months (Type, Date and Refueling 2 Se Et ember 9z 1988 2 86 days Yr-to-Date 3 2647.0 2 2937.2 2 2897.4 6 z 821 2472 2 2 199 2865 2 z 083 2471 79.4 79.4 78.3 71.0 20.6 Duration of

25.

If Shut Down at End of Report Period, Estimated Date of Start Up:

26.

Units in Test Status (Prior to Commercial Operation):

\\

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure Forecast
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

OC0185-0001B-OP03 8G:0-6 l6ti:-=:*'::*4 -- -=*--=*ric:-;-; 1- -

PDR AD. =-:::-

.1uc:K n~nno* -:.c:-...

F~

DC:D I I Cumulative 144 2206.0 76 2954.2 73 2163.6 154 2009 2389 48z113 2385 45 2300 2505 50.7 50.7

  • 48.5 39.0 35.4 Each):

Achieved

't.:.

...VERAGE DAILY UNIT POWER LEVEL e DOCKET NO 50-255 UNIT __

P_a_l_i_s_a_d_e_s DATE 06-08-88 COMPLETED BY GCPackard TELEPHONE (616)764-8913 MONTH MAY 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 773 2

145 18 774 3

269 19 774 4

716 20 771 5

773 21 769 6

770 22 765 7

772 23*

76 7 8

767 24 773 9

771 25 778 10 770 26 768 11 776 27 768 12 757 28 769 13 784 29 765 14 773 30 762 15 768 31 761 16 773 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole,megawatt.

OC0185-0001C-OP03

REPORT MONTH ____

M-'AY---'-l-'--98'""""8 __ _

No.

Date Type1 19 880427 F

1.
2.

F:

Forced S: Scheduled OC0185-0001D-OP03 Duration Reason2 (Hours) 28.6 A

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor3 Report #

1

3.

Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)

4.

System Component Code4 Code5 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

DOCKET NO.

50-255 UNIT NAME Palisades DATE 06-08-88 COMPLETED BY GCPackard TELEPHONE (616)-764-8913 Cause & Corrective Action to Prevent Recurrence e

Control Rod #6 dropped into the core due to failure of CROM #6.

5.

Exhibit I - Same Source

SUMMARY

OF OPERATING EXPERIENCE FOR MAY 1988 The reactor returned to critical at 2120 hours0.0245 days <br />0.589 hours <br />0.00351 weeks <br />8.0666e-4 months <br /> on 05/01/88 and was placed on line at 0439 hours0.00508 days <br />0.122 hours <br />7.258598e-4 weeks <br />1.670395e-4 months <br /> 05/02/88.

The plant escalated to 100 percent power and remained at this power level through the end of the reporting period.

OC0185-0001E-OP03

consumers Power POWERINli MICHlliAN'S PRDliRESS Palisades Nuclear Plant: 27780 Slue Star Memorial Highway, Covert, Ml 49043 June 8, 1988 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of May, 1988.

  • ~~

George Goralski Reactor Engineer CC: KMHaas, Palisades A8Davis, USNRC KW8erry, P24-6148 CSKozup, Palisades Resident Inspector, Palisades DLHackett, Pll-4208 MALapinski, P21-332 GW8ruckmann, Div of Radiological Health Services, Lansing, Michigan SLHall, Michigan Dept of Labor RCallen, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades LL8umb, P21-324 G8Szczotka, P-21-3118 HRSnider, P-21-326 Administrator, USNRC Document Control, 950*22*35*10/L GCP88-021 OC0185-0001A-OP03 A CMS ENERGY COMPANY