OPERATING DATA REPORT DOCKET NO 50-255 DATE 12-04-87 COMPLETED BY GCPackard TELEPHONE (616)764-8913 OPERATING STATUS NOTES

1.

Unit Name: Palisades

~~~~~~~~~~~~~~~~~~

2.

Reporting Period:

871101-871130

3.

Licensed Thermal Power (MWt):

2530

4.

Nameplate Rating (Gross MWe):

811.7

5.

Design Electrical Rating (Net MWe):

805

6.

Maximum Dependable Capacity (Gross MWe):

~'*770

.* 7. _. Maximum Dependable Capacity (Net MWe):.

~-:.-730 0

  • ~~;8.:Z:'"i'Tf Changes* Occur iri: Gapacit-y'.'.Rati*ngs.(Hems Number:*3 *thr.ough.,-,7.) :since.last report, give reasons:
9.

Power Level to Which Restricted, if any (Net MWe):

10.

Reasons for Restrictions, if any:

Hours In Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 720.0 436.2 426.0 968,160 312,500 295,470 59.2 59.2 56.2 51.0 o.o Yr-to-Date 8,016.0 4,142.6 3,899.2 8,628,141 2, 735,600 2,574,198 48.6 48.6 44.0 39.9 44.2 Cumulative 139,815.0 73,933.0 70,182.3 146,990,781 45,849,530 43,156,802 50.2 50.2

  • 48.0 38.3 35.6
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.

Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of Each):

Scheduled April 1, 1988 - 60 Days

25.
26.

If Shut Down at End of Report Period, Estimated Date of Start Up:

Units in Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure Forecast
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

OC0185-0001B-OP03

,,. -- :a£fo1:i.30009 *a? 1130

~DR ADOCK 05000255 R

... DCD Achieved

REPORT MONTH NOVEMBER 1987

~~~~~~~~~~

No.

Date Type1 14 871001 s

1.
2.

F:

Forced S:

Scheduled OC0185-0001D-OP03 Duration Reason2 (Hours) 294.0 B

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test',

C-Refueling D-Regulatory Restriction E-Operator Training &'License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor3 Report #

1

3.

Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)

4.

System Component Code4 Code5 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) l'-

DOCKET NO.

50-255 UNIT NAME Palisades DATE 12-04-87 COMPLETED BY GCPackard TELEPHONE

{616}-764-8913 Cause & Corrective Action to Prevent Recurrence

5.

Exhibit I - Same Source

.VERAGE DAILY UNIT POWER LEVEL

  • DOCKET NO 50-255 UNIT Palisades DATE 12-04-87 COMPLETED BY GCPackard TELEPHONE (616)764-8913 MONTH November 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 753 2

_- 0 18 767 3

0 19 771 4

0 20 775 5

0 21 772 6

0 22 772 7

0 23 769 8

0 24 781 9

0 25 780 10 0

26 783 11 0

27 783 12 0

28 779 13 129 29 780 14 320 30 779 15 423 16 644 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

OC0185-0001C-OP03

SUMMARY

OF OPERATING EXPERIENCE FOR NOVEMBER 1987 The plant returned to critical at 1948 hours0.0225 days <br />0.541 hours <br />0.00322 weeks <br />7.41214e-4 months <br /> on November 12, 1987 and placed on line at 0558 hours0.00646 days <br />0.155 hours <br />9.22619e-4 weeks <br />2.12319e-4 months <br /> on November 13, 1987 completing a 43 day maintenance outage.

The plant escalated to approximately 99 percent power and on November 22, 1987 reduced power to 80 percent to adjust the #4 governor valve limiter switch.

The plant then escalated back up to approximately 100 percent power and remained at this power level through the end of the reporting period.

OC0185-0001E-OP03

consumers Power POW ERi Nii

  • MICHlliAN"S PRDliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 December 4, 1987 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

.:LlCENSE"'REPORT *OF ~MONTHLY OPERATING *nATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of November 1987' Dewey VanDenBerg Reactor Engineer cc: KMHaas, Palisades GHGoralski, Palisades ABDavis, USNRC KWBerry, P24-614B CSKozup, Palisades Resident Inspector, Palisades DLHackett, Pll-420B MALapinski, P21-332 GWBruckmann, Div of Radiological Health Services, Lansing, Michigan SLHall, Michigan Dept of Labor RCallen, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades LLBumb, P21-324 GBSzczotka, P-21-311B HRSnider, P-21-326 Administrator, USNRC Document Control, 950*22*35*10/L GCP87-031 OC0185-0001A-OP03 A CMS ENERGY COMPANY