Forwards Revised Fire Protection Analysis Post-Fire Safe Shutdown from Hot Full Power Operating Conditions, Dtd 861223.Mods Re post-fire Capability to Operate Containment Spray Pump & HPSI Pump in Tandem Will Be Implemented
ML18052A818
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/23/1986
From: Berry K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18052A819 List:
References
NUDOCS 8701020090
Download: ML18052A818 (2)


Text

consumers Power POW ERi Nii 11/llCHlliAN'S PROliRESS General Offices:

1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-1636 December 23, 1986

Director, Nu~lear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

ADDITIONAL EVALUATION OF THE USE OF A HPSI PUMP FOR APPENDIX R SAFE SHUTDOWN - FIRE PROTECTION Kenneth W Berry Director Nuclear Licensing Consumers Power Company letter dated October 4, 1985 stated that the exemption request for the charging pump room regarding the separation criteria of*

10CFR50 Appendix R was no longer necessary because, for a worst case fire in the 590' elevation corridor of the Auxiliary Building, high pressure safety injection (HPSI) pump P-66B is redundant to the charging pumps.

A description of the model used in the analysis showing that redundancy was included as Attachment A to the October 4, 1985 letter.

In a July 22, 1986 submittal, Consumers Power Company notified the NRC that since NRC review of the HPSI redundancy analysis was not completed, the exemption request regarding Appendix R separation criteria for the charging pump room was considered to be active.

Subsequently, on August 20, 1986, Consumers Power Company and NRC staff met to discuss the HPSI redundancy analysis and the methodology described in Consumers Power Company's October 4, 1985 submittal.

At that meeting, the NRC staff informed Consumers Power Company that the analysis used an improperly benchmarked computer code and that HPSI pump redundancy to the charging pumps should be re-analyzed using a properly benchmarked computer code or by using other methodology.

Consumers Power Company has performed the re-analysis using a hand calculation and the appropriate conservatisms.

Attachment No. 1 to this letter provides the revised analysis.

Appropriate modifications and/or procedure changes to ensure the post-fire capability to operate the containment spray pump and HPSI pump in tandem will be implemented and the exemption request regarding OC1286-0202-NL02

Director, Nuclear Reactor Regulation Palisades Plant Add'l Evaluation of the Use of a HPSI Pump for Appendix R Safe Shutdown - Fire Protection December 23, 1986 separation in the charging pump room will be withdrawn after the revised analysis is approved by the NRC.

Kenneth W Berry Director, Nuclear Licensing CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades Attachment OC1286-0202-NL02 2