consumers Power company General Offices: 1945 West Parnall Raad, Jackson, Ml 49201 *:15171. 7SS*0550 March 5, 1986
- Director, Nuclear Reactor Regulation.
US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - L.ICENSE DPR PALISADES PLANT -
BACKLOG OF TECHNICAL SPECIFICATION CHANGE REQUESTS Consumers Power Company has re.cently reviewed each currently open Technical Specification Change Request for the.Palisades Plant.
Our review indicated approximately 40 open change requests dating back as far as 1979.
In order to promote continued refinement of the Palisades Technical Specifications as well as facilitate our own ability to propose further changes, we believe the backlog of change requests must be reduced.
Consequently, we have classified each change requ*est into one of three categories with respect to its suitability with our current Technical Specifications.
Attachments I, II, and III to this letter. list the change requests in their appropriate category, as follows:
I.
The change request remains appropriate; a Technical Specification Amendment is requested.
II.
The change request is no longer appropriate as submitted; further negotiation or revision is necessary.
III.
The change request is no longer necessary; Consumers Power Company, hereby, withdraws the change request.
The subject changes have been the topic of several conversations between Consumers Power Company staff and the NRC Palisades Project Manager.
We have agreed on an informal prioritization of work activities for the Attachment I and II change requests.
OC0186-0004-NL04
Director, Nuclear Reactor REgulation Palisades Plant Backlog of Technical Specification Change Requests March 5, 1986 2
The change requests listed in Attachment I require NRC action.
The change requests identified in Attachment II require extensive revision before they can be considered for approval.
For this reason, we request that change requests in Attachment II be put in a hold status, pending necessary revisions by Consumers Power Company.
For many of the withdrawn change requests identified in Attachment III, Consumers Power Company presumes little or no review time was expended by the NRC, due primarily to their relative low priority.
Consequently, we request a refund or credit for each fee paid in conjunction with submitting the change request, as indicated in Attachment HI.
~~~
VJames L Kuemin Staff Licensing Engineer CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades Attachment OC0186-0004-NL04
,~*
ATTACHMENTS Consumers Power Company Palisades Plant Docket 50-255 BACKLOG OF TECHNICAL SPECIFICATION CHANGE REQUESTS March 5, 1986 5 Pages IC0186-0004-NL04
ATTACHMENT I Consumers Power Company finds the following Technical Specification Change Requests for the Palisades Plant to be appropriate as submitted.
Consequently, a Technical Specification Amendment. is requested for each.
Submittal Date Subject August 20, 1979 H2 Recombiner Units July 6, 1981 Heat Balance Surveillance March 3, 1982 Air Lock Leak Test June 25, 1982 Emergency Power System Periodic Tests August 30, 1982.
Primary Coolant System (PCS) Gas Vent System April 10, 1984 Addition of 480V Distribution Buses and Redistribution of Motor Control Center July 9, 1984 Post Accident Sampling September 28, 1984 Steam Generator Augmented Inservice Inspection Program November 19, 1984 Control Room Habitability January 11, 1985 April 30, 1985 May 13, 1985 Administrative Controls Verification of Shutdown Cooling Pump and Heat Exchanger Operation during Refueling Operations Station Battery Service and Discharge Tests MI1285-0246A-LI01-NL04 Conunents References to Item 12 should now be Item 11.
None None None None
.Resubmittal forth-coming.
None None Changes to Specification 3.22 were superseded by a change request dated November 21, 1985.
A revised Section 3.14 was submitted February 28, 1986.
As updated by March 6, 1985 correction.
...J.
2 July 30, -1985 HPSI Flow Instruments None October 15, 1985 Delegation of Procedure Approval None Authority November 21, 1985 Core Exit Thermocouples None November 21, 1985 Alternate Shutdown and Emergency None Lighting Systems November 21, 1985 Inspection and Testing of Fire As corrected on Protection Devices and Assemblies November 22, 1985.
December 19, 1985 Minor Administrative Changes None February 10, 1986 Spent Fuel Pool Expansion None MI1285-0246A-LI01-NL04
ATTACHMENT II Consumers Power Company finds the following Technical Specification Change Requests for the Palisades Plant to no longer be appropriate as submitted.
Consequently, these proposed changes are requested to be placed in a "hold" status, pending necessary revis{ons.
Submittal Date August 21, 1980 November 24, 1980 December 3, 1980 June 25, 1982 November 5, 1982 May 23, 1985 Subject Redefine "Operability" Containment Spray Initiation Time Undervoltage Protection Instrumentation and Control Systems NUREG~0737 Items II.F.1.1, II.F.1.2, II.F.1.3, and I I. F. 1. 6 Leakage Detection System MI1285~0246A-LI01-NL04 Connnents None Awaiting re-evalua-tion of LOCA & MSLB analysis None None None None 3
. '.~
4 ATTACHMENT III Consumers Power Company finds the following Technical Specification Change Requests to no longer be necessary or applicable.
Consequently, each change request is, hereby, withdrawn.
Submittal Date August 3, 1979 October 31, 1979 February 1, 1980 May 5, 1980 May 14,.1980 December 3, 1980 November 12, 1981 November 17, 1981 June 25, 1982 Subject Administrative Controls Administrative Controls Administrative Controls Concentrated Boric Acid Tank Level Miscellaneous Additions and Corrections Administrative Controls NUREG-0737 Action Item III. D. 1. 1 Equipment and Sampling Tests Primary Coolant Boron Concentration MI1285-0246A-LI01-NL04 Comments Obsolete; superceded by January 11, 1985 submittal Obsolete; superseded by January 11, 1985 submittal.
Request refund of $1,200 fee Obsolete; superseded by January 11, 1985 submittal Request refund of
$4,000 fee Request refund of
$12,300 fee Obsolete; superseded by January 11, 1985 submittal The issue was addressed by Amendment 67, October 8, 1981.
Request refund of
$4,000 fee Request refund of
$4,000 fee Letter of clarifi-cation currently exists.
Request refund of
$4,000 fee
'J June 25, 1982
- June 29, 1982 February 5, 1985 Fire*Protection System Surveillance Requirements for Containment Air Cooling System Minimum Conditions for Criticality MI1285-0246A-LI01-NL04 5
Obsolete; Superseded by November 21, 1985 submittal.
Request refund of $4,000 fee Request refund of
$1,200 fee No longer necessary since the addition of Section 3.0.3