Text
...
Docket No. 50-255 LS05-85-06-029 Mr. David J. VandeWa*lle ****- -
Director, Nutlear Licensing Consumer Power Company1 June 24, 198~{
Cllamerson
- Twambach JZwolinski ACRS ( 10) 1945 West Parnall Road\\
Jae ks on, Mi ch.. i ga n 492~1 DI STR IBUTI ON Docket File NRC PDR Local PDR HThompson DELO EJordan JJoyce, w/o enclosure JShea, w/o enclosure
Dear Mr. VandeWalle:
BG rimes JPartlow
SUBJECT:
SUPPLEMENT NO. 1 TO NUREG-0737, SECTION 6.2, CONFORMANCE TO
~EGULATORY GUIDE 1.97 Re:
Palisades Plant By 1 etter dated Apri 1 14, 1983 and September 13, 1983 you submitted*.
responses to our Generic Letter No. 82-33 to provide detailed description of how the Palisades Plant conformed to Regulatory Guide 1.97.
Based on our review of these submittals, we conclude that you have provided an explicit commitment to conformance to R.G. 1.97 with the exception of those items which you have identified.
Our contractor, EG&G Idaho, Inc., has written an interim report which is enclosed.
The report indicates that the exceptions you have taken to some
- items of R.G. 1.97 appear acceptable~, However, there are some items for which adequate justification had not been provided and these have been identified in the report as unjustified exceptions.
Please respond to the open items identified in the conclusions section of**
the enclosed report within 90 days of your receipt of this letter.
You should also provide any other comments regarding any incorrect assumptions*
or commitments which yoti" believe are beyond the intent of your prev.ious responses.
The reporting and/or,xee-ordl<eepi.~g requirements contained in this 1 etter affect fewer than**ten respondents; therefore, OMB clearance is not required*
~nder P.L..96-511.
Enclosure:
EG&G Report cc w/enclosure:*
See.next *page..
- Sincerely, Original signed by John A. Zwolinski, Chief Operating Reactor Branch No. 5 Division of L iCens*ing
' l 8506280010 8506204255 ;
~DR ADOCK 0500ED~
__ j _
_L.__.,
--=---
Re.typed by JBrande;jyJ£3.Y85.
~
DL:ORB#~
- DL:ORB#5 DL:ORB#5 C~amers*o TWambach:tm JZwolinski
. 06/J.\\ /85 06/J/f/85 06/--i.'1185
/
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 June 24, 1985 Docket No. 50-255 LS05-85-06-029 Mr. David 1..1.
Vande~'alle Director, Nuclear Licensing Consumer Power Company 1945 West Parnall Road Jackson, Michigan 49201
Dear Mr. VandeWalle:
SUBJECT:
SUPPLEMENT NO. 1 TO NUREG-0737, SECTION 6.2, CONFORMANCE TO REC;LfLP.TOPY GUIDE 1. 97 Re:
Palisades Plart By letter dated April 14, 1983 and Septernher 13, 1983 you submitted responses to our Generic Letter No. 82-33 to provide detailed description of how the *Palisades Plant conformed to P.eoulatorv Guide 1.97.
Based on our review of these submitt~ls, we conclude that you have provided an explicit commitment to conformance to R.G. l.97 with the exception of those items which you have identified.
Our contractor, EG&G Idaho, Inc., has written an interim reoort which is enclosed.
The report indicates that the exceptions you have taken to some itens of R.G. 1.97 appear acceptable.
However, there are some items for which adequate justification had not been provided and these have been identified in the report as unjustified exceptions.
Please respond to the open items identified in the conclusions section of the enclosed report within 90 days of your receipt of this letter.
You should also provide any other comments regarding any incorrect assumptions or commitments which you believe are beyond the intent of your previous responses.
The reporting and/or recordkeeping requirements contained in this letter affect: fewer than ten respondents; therefore, OMP. clearance is not reauirec:I under P.L.
96-~ll.
Enclosure:
EG&G Report cc w/enr.l!'sure:
See next page SincerJt* ~~11, J~. Zwolinski, Chief Operating Reactor Branch No.-5 n;vision of Licensing
Mr. David J. VandeWalle Consumers Power Company cc M. I. Miller, Esauire Isham, Lincoln & RealP.
51st Floor Three First National Plaza Chicago, Illinois 6060?
Mr. Thomas A. McNish, Secretary Consumers Power rompi'lny
?12 West Michiqi'ln Avenue Jackson, Michigan 49201 Judd L. Bacon, Esquire Consumers Power Comp~ny 212 West Michigan Avenue Jackson, Michiqan 49?.01 Palisades Plant Nuclear Facilities and Environmental Moritnrinq Section Office Division of-Radiological Health P. 0. Box 3003~
Lansin9, ~ichigan 48909 Regional Administrator Nuclear Regulatory Commission, RP.gion IIJ 799 Roosevelt Road Glen Ellyn, Illinois 60137 Llerry Sarno Township Supervisor Covert Township 36197 M140 Highway Covert, Michigan 49043 Office of the r,overnor Room 1 - Capitol Building Lansing, Michi92n 4R913 Paliscides Plant ATTN:
Mr. Joseph F. Firlit lieneral Manager
?.77Rfl Blue Ster Memorii'll Hwy.
Covert, Michigan 49r,43 Resident Inspector c/o ll.~. MP.C Palisades Plant.
27782 Blue Star Memorial Hwy.
Covert, Michiqan 4~043