Forwards Revised Page 4 & Attachment to NRC 830314 Order Confirming Commitments for NUREG-0737,Item II.F.1, Post-Accident Monitoring. Schedule Completion Date Changed to 830701
ML18051A373
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/14/1983
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Vandewalle D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18051A374 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.F.1, TASK-TM GL-82-05, GL-82-5, LSO5-83-04-031, LSO5-83-4-31, LSP5-83-4-31, NUDOCS 8304200010
Download: ML18051A373 (4)


Text

April 1 4, 1 983 DISTRIBUTION ORB Reading Docket NRC PDR Docket No. 50-255 LSOS-83-04-031 Mr. David J. Vandewalle Nuclear Licensing Administrator Consumers Power Compa.ny Local PDR NSIC DCrutchfield HSmith TWambach 1945 West Parnall Road Jackson, Michigan 49201

Dear Mr. VandeHal le:

SUBJECT:

CORRECTION -

CONFIRMATORY ORDER ON POST-nn RELf\\TED ISSUES Palisades Plant OELD ELJordan JMTaylor ACRS (10)

SEPB By letter dated March 14, 1983, we issued an order, which confirms commitments on Post-HU related issues. Enclosed \\vith this letter are a revised Page 4 and a revised Attachment 1 for that Order.

These revised pages correct erroneous dates appearing on the third line for Item II.F.1 (1-6), Post-Accident Monitoring, and in the column on completion status.

The March 1, 1983 has been changed to July 1, 1983.

He are sorry for any inconvenience caused by these inadvertent errors.

A Correction Notice~ which is being forwarded to the Office of the federal Register for publication, is enclosed for your information.

Enclosures:

1. Revised page 4
2.

Revised Attachment l

3. Correction Notice cc w/encl osures:

See next page

( 930420-0010-* 830414 1

PDR ADOCK 05000255 I

p PDR Si nee rely, Original signed by/

Dennis M. Crutchfield, Chief Operating Reactors Branch #5 Division of Licensing

... IYJ.aruR~fr......

.. J/il!. ~'f. !. ~ ~-....

04/ /83 NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO; 1981-335-960

Mr. David J. VandeWalle cc M *. I. Miller, Esqu.ire Isham, LincolR & Beale Suite 4200 * *.

One First National Plaza Chicago, Illinois 60670 Mr. Paul A. Perry, Secretary

.Consumers Power Company 212 West*Michigan Avenue Jackson, Michigan 49201

~ - - -

Judd L. Bacon, Esquire Consumers Power Co111t>any 212 West Michigan Avenue Jackson, Michigan 49201 James G. Keppler, Regional Administrator Nuclear Regulatory Conmission, Region Ill 799 Roosevelt Road Glen Ellyn, Illinois 60137 Township Supervisor Covert Townshi Route l, Box 10 Van Buren County, Michigan 49043

  • Office of the Governor (2)

Room l - Capitol Building Lansing, Michigan 4891~

Palisades Plant ATTN:

Mr*. *Robert *-Montross Plant Manager Covert, Michigan 49043 U. S. Environmental Protection Agency Federal Activit-ies Branch Region V Office ATTN:

Regional Radiation Representative 230 South Dearborn Street Chicago, Illinois 60604 Resident Inspector c/o U. S. NRC Palisades Plant Route 2, P. O. Box 155 Covert, Michigan 49043 April 14, 1983

(7590-01) e measures, plant procedures for handling and analyzing post-accident samples were. developed a_~d-~_!'1plemented using the existing NSSS sampling panel.

These will be utilized until the post-accident sampling equipment becomes opera ti ona l.

II.E.1.2 Auxiliary Feedwater (AFW) Initiation and Flow Indication This item is completed except for the electro-pneumatic converters for the auto-init_i_ation*of the auxiliary feecfylater.

Converte_!'S with safety grade certification were not available at the time this modification was installed but will be installed at the next refueling outage.

In the interim, the licensee has installed control grade converters_and the system is operational.

II.F.1 (1-6) Post-Accident Monitoring (6 items)

The licensee will delay four items, II.F.1(1), (2), (3), and (6). For Item

  • II.F.1(1), Noble Gas Effluent Radiological Monitor, the present schedule for completion is July 1, 1983. Faulty ~etectors were delivered with the monitor and the vendor has delayed sending replacement detectors.

In the interim, a collimated ion chamber which views the steam released from the atmospheric steam dump and code safety valves provides the cap a bi 1 i ty to monitor radio-acti ve releases from the secondary side steam system.

For Item II.F.1(2),

Continuous Sampling of Plant Effluents, the present schedule for completion is July 1, 1983 *. ::rhe equipment, as delivered, has some deficiencies including filter leakage which required ordering a new filter package from another vendor.

In the interim, the radioactivity of the gas released from the Plant Stack is monitored by a collimated ion chamber which views the stack. For

f 7 Item 1.A.3.* 1.

, Att,achrnent LICENSEE'S COMMITMENTS ON APPLICABLE NUREG-0737 ITEMS FROM GEN RIC LETTER 82-05 i*

Title Simulator Exams NUREG-0737 Schedule 10/01/81 Requirement Licensee's Completion Schedule (or status)*

Complete Include simulator exams in licensing examinations 11.B.2 Plant Shielding 01/01/82

  • Modify facili;ty to provide..

access to vital areas urider.*

accident conditions

,.Complete


~ ---~~--~-

-~---------------------

II.B.3 Post-Accident Sam~ling 01/01/82 Installed; being tested but isolat Install upgrade post-accident To be operational by 6/1/83 except


sa_m_._p_l_i n_,g..__c_a._pa_b_i_l_i_ty

--.id..u:;epen dent ad H2 Mon it or I I F J ( 6) 11.B.4 Training for Mitigating 10/Ql/81 Complete training pr,ogram

,.: Complete

__;.C_or'-e_D_am_a_..g._e _______ -----------* _____ _

e-II.E.1.2 II.E.4.2 Il.F.l Aux. Feedwater Initiation 07/01/81 Modify instrumentation to Replace converters 9/83*

& Flow Indication

_________ l_e_vel of *Safety grade

  • Containment Isolation 07/01/81 Part 5-lower containment Complete Dependability pressure setpoint.to level Accident Monitoring co_m....._p_ati b l~w/norma 1 opera ti on*--------------.-

07/01/81 01/01/82 Part 7-isolate purge & vent valves on radiation signal Complete *

(1) Install noble gas effluent Vendor delay Operational by 7/1/83 monitors.

Ol/Ol/82*---(....,.2..... )-, p*-r-ov_,i,_,d.-e-,c-a-p-.ability for Vendor delay Operational by 7/1/83 effluent monitoring of iodine Ol/Ol/82 Ol/01/82 (3) TriSfall incontainment- -

Vendor delay Operational by 6/1/83 radiation-level monitor~

(4) Provide continuous indi:.-- Complete cation of containment pressure 01701..... /"'"'82_. _ _,._...,..(=-5).--...P-roVlcle continuous indi- -

Complete cation of -containment water level.

Ol/Ol/82 --- (6) Provi_de continuous inai-cation of hydrogen concentra-tion in containment-~

  • Complete except isolated because valve removed for repair. Return to service at next outage ~reater than 15 days.

~where completion date refers to a refueling outage.(the estimated date when the outage begins), the item will be completed prior to the restart of the facility