ML18051B149

From kanterella
Jump to navigation Jump to search
Summary of Changes and Analysis for Revision 49 of PPM 13.1.1 Classifying the Emergency, Revision 33 of PPM 13.1.1A Classifying the Emergency - Technical Bases, Revision 38 of PPM 13.8.1 Emergency Dose Projection System.
ML18051B149
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/20/2018
From: Gregoire D
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML18059A617 List:
References
GO2-18-029
Download: ML18051B149 (2)


Text

Donald W. Gregoire Columbia Generating Station P.O. Box 968, PE20 Richland, WA 99352-0968 Ph. 509.377.8616 l F. 509.377.4674 dwgregoire@energy-northwest.com February 20, 2018 GO2-18-029 10 CFR 50.54(q)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 205551

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397;

SUMMARY

OF CHANGES AND ANALYSIS FOR REVISION 49 OF PPM 13.1.1 CLASSIFYING THE EMERGENCY, REVISION 33 OF PPM 13.1.1A CLASSIFYING THE EMERGENCY - TECHNICAL BASES, REVISION 38 OF PPM 13.8.1 EMERGENCY DOSE PROJECTION SYSTEM OPERATIONS, AND EMERGENCY RESPONSE DATA SYSTEM

Dear Sir or Madam:

Enclosed is the summary of changes for the following EPlan Implementing Procedures (EPIP) which were implemented on January 17, 2018:

Revision 49 of PPM 13.1.1 Classifying The Emergency Revision 33 of PPM 13.1.1A Classifying The Emergency - Technical Bases Revision 38 of PPM 13.8.1 Emergency Dose Projection System Operations Emergency Response Data System (ERDS) data point update.

The changes to these EPIPs have been evaluated in accordance with 10 CFR 50.54(q) and 10 CFR 72.44(f). The EPIPs, as revised, continue to meet the standards of 10 CFR 50.47(b) and the requirements of 10 CFR 50 Appendix E.

One ERDS data point for the Reactor Building Process Radiation Monitoring has been replaced with a new data point and units updated from counts per second (cps) to Ci/cc. ERDS continues to meet the standards of 10 CFR 50, Appendix E, Section VI.3.

The Enclosure contains a summary of changes. Each change was evaluated in accordance with the stations 10 CFR 50.54(q) evaluation process. These changes do not create a reduction in effectiveness of the approved EPlan and listed EPIPs.

G02-18-029 Page 2 of 2 This submittal contains no new or revised regulatory commitments. Should you have any questions or desire additional information regarding these matters, please contact Sean E. Clizbe at (509) 377-4398.

Executed on the JJtt'day of ~brv~r--/

, 2018.

I Respectfully, D. W. Gregoire Manager, Regulatory Affairs and Performance Improvement

Enclosure:

Summary of Changes cc:

NRG Region IV Administrator NRG NRR Project Manager NRC Sr. Resident Inspector/ 988C Director - Spent Fuel Storage & Transportation, NMSS CD Sonoda, BPA / 1399 ( email)

WA Horin -Winston & Strawn (email)