ATTACHMENT Consumers Power Company Palisades Plant - Docket 50-255 RADIOACTIVE EFFLUENT AND WASTE DISPOSAL SEMIANNUAL REPORT JULY THROUGH DECEMBER 1983 February 1984 9403080206 831231 PDR ADOCK 05000255 9 Pages R PDR OC0284-0015B-NL02

PALISADES NUCLEAR PLANT SEHIANNUAL EFFLUENT REPORT JULY - DECEMBER 1983 This* report provides information relating to radioactive effluent releases and solid radioactive waste disposal operations of the Palisades Plant during the period of July through December 1983 in the format contained in Plant Technical Specification 6.9.3.1.A.

1. Supplemental Information
a. Batch Releases Information relating to batch releases of liquid and gaseous effluents is provided in Table 1.
b. Abnormal Releases - none.
2. Gaseous Effluents Table 2a presents a* summary of all gaseous radi.oactive effluents released during the period. Release totals for each radionuclide determined to be present in gaseous effluents are contained in Table 2b. The unidentified portion was 4.00E-6% of the total release.
3. Liquid Effluents Table 3a presents a summary of all liquid radioactive effluents released .

during the period. Release totals for each radionuclide determined to be present in liquid effluents are .contained in Table 3b. The unidentified portion was 6.05E-4r. of the total release. Laundry releases for 1983 were 41.6% of Technical Specification limits.

4. Solid Waste Quantities of solid waste shipped off site and the disposition of these shipments are presented in Table 4.
5. Radiological Impact on Man Potential doses to individuals and populations were calculated using GASPAR and LADTAP computer codes. The annual values for curies released were input for each nuclide.
a. Doses to individuals in unrestricted areas received from water related exposure pathways are 4.74E-2 mrem maximum total body dose (adult) and 7.51E-2 mrem maximum orgnn dose (teenage liver dose).
b. The maximum offsite air doses are l.50E-l mrads for beta and 5.0SE-2 mrads for gamma;
c. The most restrictive organ dose is the thyroid dose. The average thyroid dose to individuals within a distance of 50 miles of the site from radioactive iodine and radioactive material in particulate form from major pathways of exposure is l.23E-3 mrem.
d. Total body doses to the population and average doses to individuals in the population from receiving water related pathways to a distance of

.50 miles from the site are l.58E-l manrem and l.50E-4 mrem respectively.

e. Total body doses to the population and average doses to individuals in the population from gaseous effluents to a distance of 50 miles from the site are 7.37E-2 manrem and 7.02E-5 mrem respectively~

TABLE l PALISADES PLANT BATCH RELEASES JULY 1983 through DECEMBER 1983 A. GASEOUS Units Third Quarter Fourth Quarter Number of Releases 9 l Total Release Time Minutes 2.39E3 5.66E2 Maximum Release Time Minutes 6.30E2 5.66E?.

Average Release Time Minutes 2.65E2 5.66E2

~

Minimum Release Time Minutes l.50E2 5.66E2 B. LIQUID Number of Releases 49 50 Total Release Time Minutes 8.86E3 f 6.87E3 Maximum Release Time Minutes 9.76E2 5.50E2 Average Release Time Minutes l. 81E2 l.37E2 Minimum Release Time Minutes 37 40 MI0284-0026A-RSOJ

TABLE 2a PALISADES PLANT EFFLUENT AND WASTE DISPOSAL SEMIANNUAL.REPORT GASEOUS EFFLUENTS - SUNMATION OF ALL RELEASES JULY 1983 through DECEMBER 1983.

THIRD FOURTH EST TOTAL A. FISSION & ACTIVATION GASES UNITS QUARTER QUARTER ERROR %

I. Total release Ci 8.14E2 l.32E-2 4.01

2. Average release rate for period µCi/sec l.02E2 I. 66E-3
3. Percent.of Technical Specification Limit  % 6.82E-2 1. llE-6 B. IODINES
1. Total Iodine-131 Ci l.80E-2 8.15E-4 5.20 I
2. Average release rate for period (I-131) µCi/sec 2.26E-3 l.03E-4
3. Percent of Technical Specification Limit (I-131)  % 1. 58E-1 7.20E-3
c. PARTICULATES
1. Particulates with half-life >8 days Ci 1.SOE-4 l.OSE-3

. 29.2 I

2. Average release rate for period µCi/sec 1.88E-5 l.32E-4
3. Percent of Technical Specification Limit  % 1. 34E-4 1.07E-4
4. Gross alpha radioactivity Ci l.68E-6 l. 19E-6 D. TRITIUM ..
1. Total release Ci 1. 78 2.38
2. Average release rate for period µCi/sec 2.24E-l 2.99E-l
3. Percent of Technical Specification Limit  % 2.24E-4 2.99E-4 t . . PERCENT OF GASEOUS EFFLUENTS OF
APPENDIX I VALUES  % 1. 12 5.89E-2 MI0294-0026TI-RS01

TABLE 2b PALISADES PLANT EFFLUENT AND WASTE DISPOSAL SEMIANNUAL REPORT GASEOUS EFFLUENTS - GROUND LEVEL RELEASES JULY 1983 through DECEMBER 1983

1. FISSION GASES Units Third Quarter Fourth Quarter Krypton-85 Ci 2.15 l.32E-2 Krypton-85m Ci l.06E-2 --

Krypton-87 Ci l.29E-3 --

Krypton-88 Ci 1.57E-2 --.

- Xenon-13lm Ci 1.33 --

Xenon-133 Ci 8.10E2 --

Xenon-133m Ci -4. 31E-2 --

' Xenon-135 Ci 9.24E-2 --

Xenon-135m Ci 8.34E-2 --  :

Argon-41 Ci 3.86E-3 --

Total for period Ci 8.14E2 1. 32E-2

. 1. IODINES Iodine-131 Ci 1.80E-2 8.15E.:.4 Iodine-132

  • Ci l.55E-3 --

Iodine-133 Ci 4.54E-3 --

Iodine-135 Ci 1. 99E-3 --

Total for period Ci 2. 61E-2 8.lSE-4 MI0284-0026C-RS01

TABLE 2b (continued)

PALISADES PLANT EFFLUENT AND WASTE DISPOSAL SEMIANNUAL REPORT GASEOUS EFFLUENTS - GROUND LEVEL RELEASES

  • JULY 1983 through DECEMBER 1983.
  • 3. *PARTICULATES Units Third Quarter Fourth. Quarter Chromium-51 Ci -- --

Manganese-54 Ci -- --

Cobalt-58 . Ci . 3.08E-5 3.53E-5 Cobalt-60 Ci 2.73E-5 1. 79E-5 Zinc-65 Ci -- --

Silver-llOm Ci -- --

Cesium-134 Ci 1. 72E-6 --

Cesium-137 Ci 1.56E-5 9.39E-6.

Barium-140 Ci -- --  :

Mercury-203 Ci -- --

Selenium-75 Ci 4.57E-5 9~84E-4 Net unidentified beta Ci 2.87E-5 3.76E-6 Total l.50E-4 l.05E-3

  • Particulates with half live >8 days.

MI0284-0026D-RS02

TABLE 3a PALISADES PLANT EFFLUENT AND WASTE DISPOSAL SEMIANNUAL REPORT LIQUID EFFLUENTS - SUMMATION OF ALL RELEASES JULY 1983 through DECEMBER 1983*

THIRD FOURTH EST TOTAL A. FISSION & ACTIVATION PRODUCTS UNITS QUARTER QUARTER ERROR %

1. Total release* (not including tritium, gases, alpha) Ci 2.57E-2 4.BOE-2 7.24
2. Average diluted concentration during period µCi/ml 9. 38E-10 2.81E-9
3. Percent of applicable limit Liquid

- Waste System 1% of MPC  % 1.21 1.17 B. TRITIUM

1. Total Release Ci 4.79El 4.86El 4-.1 I
2. Average diluted concentration during period µCi/ml 1. 75E-6 2.84E-6
3. Percent*of applicable limit Liquid Waste System 1% of*MPC  % 5.83 9.47
c. DISSOLVED & ENTRAINED GASES
1. Total release Ci 6.75E-3 -- 10.4 .

I

2. Average diluted concentration during period µCi/nil 2.46E-10 --
3. Percent of applicable limit Liquid Waste System 1% of MPC  % 1.07E-2 --
  • n. GROSS ALPHA RADIOACTIVITY (total release) Ci <2.74E-2 <1. 71E-2 E. VOLUl'iE OF WASTE RELEASED (prior to dilution) liters 2.04E6 1.52E6 F. VOLUME OF DILUTION WATER USED DURING PERIOD liters 2. 74E10 1.71E10 G. PERCENT "OF APPENDIX I ANNUAL LIMIT  % 6.74E-1 1. 02 MI02S4-000~E-RS01

TABLE 3b PALISADES PLANT EFFLUENT AND WASTE DISPOSAL SEMIANNUAL REPORT LIQUID EFFLUENTS JULY 1983 through DECEMBER 1983 NUCLIDES RELEASED Units Third Quarter Fourth Quarter Cesium-137 Ci 6.59E-3 7.75E-3 Cobalt-58 Ci 7.92E-3 2.87E-2 Manganese-54 Ci 1. OlE-3 2. 14E-3 Cobalt-60 Ci 7 .15E-3 3.99E-3 Cesium-134 Ci l.94E-3 5.28E-3 Barium-140 Ci 1.58E-4 --

Lanthanum-140 Ci 9.36E-5 --

Chromium-51 Ci

Cesium-136 Ci 2. llE-5 --

Niobium-95 Ci l.89E-8 7.06E-6 Iodine-131 Ci 3.04E-4 --

Silver-llOm Ci 2.98E-5 --

Zirconium-95 Ci 2.26E-6 --

Net unidentified beta Ci 4.19E-4 1.65E-4 Subtotal for Period (above) Ci 2.57E-2 4.80E-2 Xenon-133 Ci 6.75E-3 --

Tritium Ci 4.79El 4.86El Grand Totals 4.79El 4.86El MI0284-0026F-RS01

TABLE 4

.PALISADES PLANT EFFLUENT AND WASTE DISPOSAL SEMIANNUAL.REPORT SOLID WASTE AND IRRADIATED FUEL SHIPMENTS JULY 1983 through DECEMBER 1983 A. SOLID WASTE SHIPPED OFFSITE FOR BURIAL OR DISPOSAL (not irradiated fuel) UNITS

1. Spent resins, filter sludges, evaporator m3 9.25El bottoms, etc. Ci 2.39E2
2. Dry compressible waste, contaminated m3 2.89E2 equipment, etc. Ci 6.39 3 Irradiated components, control rods, etc. m3 3.30E-l (In-cores) Ci 2.53E4
4. Other (describe) ms --

Ci --

B. SOLID WASTE SHIPMENT DISPOSITION Date of Shipments Mode of Transportation Destination 8/25/83, 9/1/83, 9/9/83, Truck Richlanrl, WA 9/16/83, 10/3/83, 10/7/83, 10/12/83, 10/18/83, 10/21/83, 10/27/83, 11/4/83, 11/22/83, 12/1/83, 12/7/83,-12/13/83 7/18/83, 9/24/83, 11/3/83 Truck Barnwell, SC 11/10/83, 12/9/83 .

C. IRRADIATED FUEL SHIPMENTS (DISPOSITION)

Date of Shipments Mode of Transportation Destination NONE

  • MI0284-0026G-RS01

General Offices: 1945 West Parnall Road, Jackson, Ml 49201 * (517) 788-0550 February 29, 1984 James G Keppler, Administrator Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - SEMIANNUAL RADIOACTIVE EFFLUENT RELEASE AND WASTE DISPOSAL REPORT - JULY THROUGH DECEMBER 1983 Attached is the Semiannual Radioactive Effluent Release and Waste Disposal Report for the Palisades Plant covering the period from July through December 1983. This is submitted in accordance with 10 CFR 50.63a(2) and Technical Specification Section 6.9.3.

Brian D Johnson Staff Licensing Engineer CC Direct.or, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Palisades Attachment 5 ino.i1

/~l OC0284-0015AA-NL02