ML18051A354

From kanterella
Jump to navigation Jump to search
Submits Supplemental Response to 830920 Generic Ltr 82-16 Requesting Review of Tech Specs Re NUREG-0737,Items II.K.2.13,II.K.3.3 & II.K.3.12.Items Not Applicable or Resolved Per NRC
ML18051A354
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/29/1983
From: Johnson B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.2.13, TASK-2.K.3.03, TASK-2.K.3.12, TASK-TM GL-82-16, NUDOCS 8304040189
Download: ML18051A354 (2)


Text

consumers Power*

company General Offices: 212 West Michigan Avenue, Jackson, Ml 49201 * (517) 788-0550 March 29, 1983 Dennis M Crutchfield, Chief Operating Reactor Branch No 5 Nuclear Reactor Regulation US Nuclear Regulatory Collllllission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

SUPPLEMENTAL RESPONSE TO NRC GENERIC LETTER 82-16 "NUREG-0737 TECHNICAL SPECIFICATIONS" NRC Generic Letter 82-16 dated September 20, 1983 requested that Consumers Power Company review the Palisades Plant Technical Specifications to determine if they were consistent with the guidance provided in Generic Letter 82-16.

Consumers Power Company's letter dated January 20, 1983 provided our response for items 1 through 9. This letter provides Consumers Power Company's response for item 11 through 13.

(11)

B & W Thermal-Mechnical Report (II.K.2.13)

This item relates to B & W plants only and therefore is not applicable to the Palisades Plant.

(12)

Reporting SV and RV Failures and Challenges (II.K.3.3)

Consumers Power Company's letter dated December 19, 1980 stated that the Palisades Plant Technical Specifications require that challenges and failures of safety valves and relief valves be reported.

NRC letter of June 30, 1982 states that the NRC IP

considers this item resolved for the Palisades Plant.

7t;>

8304040189-830329 PDR ADOCK 05000255 p

PDR OC0383-0025A-NL02

DMCrutchfield, Chief Palisades Plant SUPPLEMENTAL RESPONSE March 29, 1983 TO GENERIC LETTER 82-16 (13)

Anticipatory Trip on Turbine Trip (II.K.3.12) 2 This item relates to Westinghouse plants only and therefore is not applicable to the Palisades Plant.

~~

Brian D Johnson Staff Licensing Engineer CC Administr~tor, Region III, USNRC NRC Resident Inspector - Palisades OC0383-0025A-NL02