Proposed Tech Specs to Permit Monthly Tests of Containment High Radiation & Area/Process Monitors
ML18047A385
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/25/1982
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18047A383 List:
References
NUDOCS 8206290241
Download: ML18047A385 (3)


Text

f) - -

'/ 8206290241 820625 PROPOSED TECHNICAL SPECIFICATIONS CHANGE REQUEST

. PALISADES PLANT I',

\\

. ~

PDR ADOCK 05000255

.* P.

-.. 1 *...

_, *PDR. * *1_:, I

TABLE 4.1.2 Minimum Frequencies for Checks, Calibrations and Testing of Engineered Safety Feature Instrumentation Controls Channel Description

5.

Containment High Radiation Channels (Contd)

6.

Manual SIS Initiation

7.

Manual Containment Isolation Initiation

8.

Manual Initiation Contain-ment Spray Pumps and Valves

9.

OBA Sequencers

10.

Nbrmal Shutdown Sequencers

11.

Diesel Start

12.

SIRW Tank Leve-I Switch Interlocks nu0880-0003d-43-15l Surve i I I ance Function

c.

Test

d.

Test

a.

Test

a.

Test

b.

Check

a.

Test

a.

Test

a.

Test

a.

Test

b.

Test

c.

Test

a.. Test Frequency 4-7 M(2)

R R

R R

R Q.

R M

R p

R Surveillance Method

c.

Exposure to a radioactive source or con-firmation of a significant instrument reading above natural background by radiation field measurement is used to verify instrument operation.

d.

Simulation of CHR 2/4 logic trip with test switch to verify actuation relays, including containment isolation.

a.

Manual push-button test.

a.

Manual push-button test.

b.

Observe isolation valves closure.

a.

Manual switch operation~

a.

Proper operation wi 11 be verified during

  • SIS actuation test of Item 3(a) above.
a.

Simulate normal actuation with test-operate switch and verify equipment starting circuits.

a.

Manual initiation fol lowed by synchronizing and loading.

b.

Diesel start, load shed, synchronizing and loading wi I I be verified during Item 3(b) above.

c.

Diesel auto start initiating circuits.

a.

Level switches removed from fluid to verify actuation logic.

PROPOSED

. I

Channel Description

1.

Sta rt-Up Range Neutron

  • Monitors
2.

Primary Rod Position Indication System

3.

Secondary Rod Position Indication System

4.

Area and Process Monitors

5.

Emergency Plan Radiation Instruments

6.

Environmental Monitors 1:

Pressurizer Level Instruments nu0482-0149a-43-153 TABLE 4.1.3 Minimum Frequencies for Checks, Calibrations and Testing of Miscellaneous Instrumentation and Controls Su rve i I I a hce Function

a.

Check

b.

Test

a.

Check.

b.

Check

c.

Calibrate(l)

a.

Check

b.

Check

c.

Ca I i bra te ( 1 )

a.

Check b.

Ca I i bra te

c.

Test

a.

Ca I i bra te

b.

Test

a.

Check

b.

Ca I i bra te

a.

Check b.

Ca I i bra te

c.

Test Frequency s

p s

M R

s M

R D

R M

A M

M A

s R

M 4-10 Survei I lance Method

a.

Comparison of both channel count rate indications when in service.

b.

Internal test signals.

a.

Comparison of output data with secondary RPIS.

b.

Check of power dependent insertion I imits monitoring system.

c.

Physically measured rod drive position used to verify system accuracy.

Check rod position interlocks.

a.

Comparison of output data with primary RP IS.

b.

Same as 2(b) above.

c.

Same as 2(.c) above, inc I ud i ng out of sequence alarm function.

a.

Normal readings observed and internal test signals used to verify instrument operation.

b.

Exposure to known external radiation source.

c.

Exposure to a radioactive source or con-firmation of a significant instrument reading above natural background by radiation field measurement is used to verify instrument operatioh.

a.

Exposure to known radiation source.

b.

Battery check.

a.

Operational check.

b.

Verify airflow indicator.

a.

Compa~ison of six independent level readings.

b.

Known differential pressure applied to sensor.

c.

Signal to meter relay adjusted with test device.

PROPOSED

..