ML18046A935

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-255/81-16 on 810717-20 & Notice of Violation
ML18046A935
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/11/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dewitt R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18046A936 List:
References
NUDOCS 8109280520
Download: ML18046A935 (2)


See also: IR 05000255/1981016

Text

' .

Docket No. 50-255

Consumers Power Company

ATTN:

Mr. R. B. DeWitt

Vice President

Nuclear Operations

212 West Michigan Avenue

Jackson, MI

49201

Gentlemen:

SEP 11 1981

This refers to the routine safety inspection conducted by Mr. M. M. Holzmer

of this office on August 17-20, 1981, of activities at Palisades Nuclear

Generating Plant authorized by NRC Operating License DPR-20 and to the dis-

cussion of our findings with Mr. R. Montross at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection.

Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in enclosed Appendix A.

A

written response, submitted under oath or affirmation, is required.

The item in the Notice of Violation enclosed with this letter is a recurrent

item (third occurrence identified within three years) and was discussed with

the plant manager, Mr. Montross during the exit interview held on August 20,

1981.

In your response to this letter, please give this matter your particular

attention.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report.will be placed in the NRC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation.

Section 2.790(b)(l) requires that any such application must be

( 8109280520 810911 '\\

  • PDR ADOCK 05000255 *

G.

PDR,

~

Consumers Power Company

- 2 -

SEP 11 1981

accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons which are the bases for the claim that the

information should be withheld from public disclosure.

This section further

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-255/81-16

cc w/encls:

D. P. Hoffman, Nuclear

Licensing Administrator

R. W. Montross, Manager

DMB/Document Control Desk (RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

Myron M. Cherry

Sincerely,

C. E. Norelius, Director

Division of Engineering and

Technical Inspection

RIII

?!A_'*1--

Holzmer /so

8/31/81

RIII

dJer

RI~

Boyd

RIII

(!_fl., A1

wiliiams