ML18046A736

From kanterella
Jump to navigation Jump to search
Forwards List & Status of SEP Program Phase II Topics Superseding Encl 3 of
ML18046A736
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/19/1981
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
TASK-***, TASK-RR LSO5-81-06-069, LSO5-81-6-69, NUDOCS 8106240148
Download: ML18046A736 (8)


Text

'*

    • ."..~

eo8ket N8.

50-2~5 s 5 6-069 Mr. David P. Hoffman Nuclear Licensing Administrator Consumers Power Company.

1945 w. Parna 11 Road Jackson, Michigan 49201

Dear Mr. Hoffman:

({

ifl...

SUBJECT:

  • PALISADES - LIST AND STATUS OF SYSTEMATIC EVALUATION PROGRAM, PHASE II, GENERIC TOPICS By letter dated May;, 1981 (Letter to all SEP Licensees from G.c. ~ainas}, we sent you the list of generic topics that will be addressed in the Systematic Evaluation Program integrated assessment (see Enclosure 3 of the letter).

The letter also-stated that you would be informed by separate correspondence of the statu*s of the generic topic;:s and what further action, if any, is needed. of this letter presents th.e status 9f these generic topics and sup-ersedes Enclosure 3 of the May 7, 1981 letter. ltie stat.l!.S code is identfcal to that used in NUREG-0485 and, *for convenience, is included-her-ewjth a~ Enclosure

2. There are no actions required by you at this time regarding Ute *9e.Qeric topics in Enclosure 1.

Enclosure:

As stated cc w/enclosure:

See next page 181106 24 0 \\"\\'\\ ('

  • See previous concurrence Sincerely, Dennis M. Crutchfield, Chief Operating Reactors *a ranch No. 5 Division of Licensing OFFICE* * ~~.~~ ****** ~....... ?.~~.~..... ~......... ~.~P.~...... ~... *...... 9H~#.. ~... ~........

-~...... A A:nL........................

SURNAME~ * ~~~~~~-~~.~~: ** ~.. ~.~~:.1.~.~.~~.~...... ~.~~.~~~.lJ........ ~~~~~?:~.~....... P.~...... ~~).~]..... ~.... rn~.~~... ::.......... ~.........

DATE..~(' (~.1.. * * *.. * * *.. ~!..r. (.~.1. * *" * """.~!..?. !.~.1............ ~((.C::(~ ],. *...... ~.~!1.7.t.~.1.......... ~1.\\1/.~;l~,... ::..............,,

NRC FORM 3181101801 NRCM 0240 OFFICIAL RECORD COPY*

-!> U~PO: 1980-329*824

... ~

.. --t~-*-.

Docket No. 50-255 Mr. David P. Hoffman Nuclear Licensing Administrator Consumers Power Company 1945 w. Parnall Road Jackson, Michigan 4920l

Dear Mr. Hoffman:

SUBJECT:

PALISADES - LIST AND STATUS OF SYSTEMATIC EVALUATION PROGRAM,..

PHASE II, GENERIC TOPICS By letter dated May 7, 1981 (Letter to all SEP Licensees from G.C. Lainas), we sent you the list of generic topics that will be addressed in the Systematic Evaluation Program integrated assessment (see Enclosure 3 of the letter).

The letter also st~te*d that you would be informed by. separate* ~orrespondence_ of the status of the generic top1cs*an.d what further action, 1f any, is needed;;*

.. -.: of this letter presents tffe* *status of these generic top1cs and sup;..

ersede_s* Enclosure 3 of the May 7, 1981 letter. *-.T.~ status code is identical to that used in NUREG-0485 and, fQr conv1~nence, 1s 1nclude.f!. herewith as EnclOsure

--*-~~-....... 2. There are.no actions re.quired by you at this time regifrd-1-n_g the generic

  • --t'ep4~c.s_ 1 n Enc 1 osu re l.
-~------....

~-.

Sincerely,

Enclosure:

As st'ated

  • cc w/enclosure:

~.""::...,,~.;.

...... '9,..i'.":.~~:r......... ~.

\\

Dennis M. Crutchfield, Chief Operating Reactors Branch No. 5 Division of Licensing See~ next page

- ___ _J

.. -... ~.

....r' '

  • i~;.~1.tt. /~:*:~~~~.. ~~~-s *~\\ i...... ~.. 9*::*!r~¥-.. 9-~m. "h"f j". "i...

-~P.; -~~-; P.L... :............... >

.................................... 9...................................................O.Cr.v.tc...... ~... o.... J..9.1n~:i............................

DATE~ 6/ Y/81 6/~ /81.

.. 6/ /81 6//b/81

. 6/ /81 6/ /81

~... -.....

NRC FORM 318 110/801 NRCM 0240...

OFFICIAL RECORD COPY

'* n USGPO: 1980-329*824

Docket No. 50-255 LS05-81-06-069 Mr. David~P. Hoffman e

e UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 June 19, 1981 Nuclear Licensing Administrator Consumers Power Company 1945 w. Parnall Road Jackson, Michigan 49201

Dear Mr;* Hoffman:

SUBJECT:

PALISADES - LIST AND STATUS OF SYSTEMATIC EVALUATION PROGRAM, PHASE II, GENERIC TOPICS By letter dated May 7, 1981 (Letter to all SEP Licensees from.G.C. Lainas), we s'ent you the 1 i st of generic topics that wi 11 be addressed in the Systematic Evaluation Program integrated assessment (see* Enclosure 3 of the letter).

The letter also stated that you would be informed by separate corres.pondence of the status of the generic topics and what further action, if any, is needed.

. of this letter presents the status of these generic topics and sup.:.

ersedes Enclosure 3 of the May 7, 1981 letter. The status code is.identical to that used in NUREG-0485 and,* for convenience, is included herewith as Enclosure

2. There are no actions required by you at this time regarding the generic topics in Enclosure 1.

Enclosure:

As stated,

cc w/enclosure:

-See next page -

  • .Sincerely, D~M

.* c*."J//.t hf.

  • l.d.. c1*h*~. ~....,..

enn1s

  • ru c 1e 1

Operating Reactors Branch No. 5 Divisitin of licensing

)

_I Mr. David P. Hoffman cc M. I. Miller, Esquire Isham, Lincoln & Beale Suite 4200 One First National Plaza

  • Chicago,. Illinois 60670 Mr~ Paul A. Perry, Secretary Consumers Pm1er Co!T'pany 212 West Michigan Avenue Jackson, Michigan 49201 Judd L. Bacon, Esquire Consumers Power Corrpany 212 West Michigan Avenue Jackson, Michigan 49201 Myron M. Cherry, Esquire Suite 4501 One IBM Plaza Chicago, Illinois 60611 Ms. Mary P. Sinclair.

Great Lakes Energy A 11 i ance 5711 Summerset Drive Midland, Michigan 48640 Kalamazoo Public Library 315 South Rose Street Kalam~zoo, Michigan 49006

  • Township Supervisor
  • Covert Township Route 1, Box 10 Van Buren County, Michigan 49043 Offic¢ of the Governor (2)

Room 1 - Capitol Building Lansing; Michigan 48913 William J. Scanlon, Esquire.

2034 Pauline Boulevard Ann Arbor, Michigan 48103 Palisades Plant ATTN:

Mr. Robert Montross Plant Manager Covert, Michigan 49043 PALISADES Docket No. 50-255

u. s. Environmental Protection A1ency Federal Activities Branch Region V Office ATIN:

EIS COORDINATOR 230 South Dearborn Street Chicago, Illinois 60604 Charles Bechhoefer~ Esq., Chairman

. Atomic Safety and Licensing Board Panel

u. s. Nuclear Regulatory Corrmission Washington, D. C.

20555.

Dr. George c. Anderson Department of Oceanography University *of Washington Seattle, Washington 98195 Dr *. M. Stan 1 ey Li vi ngstoi'l

  • 1005 Calle Largo Santa Fe, New Mexico 87501 Resident Inspector c/o U. S. NRC P. o. Box 87 South Haven, Michigan 49090

'.l ENCLOSURE 1 PALISADES GENERIC TASK STATUS TOPIC 111-4.B - Turbine Missiles 1II-7~A - Inservice Inspectibn.-

Containments Ill-8.A..:. Loose Pa~ts Monifori~g and Core Barrel Vibrat7 ion Monitoring IV~3 -

BWR Jet Pumps Operating l~dicatibns STATUS Status 3 01/06/81 (Multi-Plant issue B-46-Analysis.of Turbine Disc Cracks)

Status 3 - 05/15/81

  • (NRR Generic Activity No. B-49'..:. *Jnservice *..
  • Inspection Criteria for Containments.

Implementation position has not been de-.*

. veloped,.however, guidance exists for pre-s tressed concrete.containments in Regulatory Guide 1.35, and a review will be performed

  • using this guide as a reference.)
    • .
  • loose Parts Monitoring.
  • Status 0 (NRR Generic Act,ivity No~. B Loos*e. *..

Parts* Monitoring* Systems..

Implementation * :

.: position has been developed in Revis.ion 1.fo R~gulatory Guide 1.133 "Loose-Part Detect.ion Program for th.e Primary System *of Light-*

  • Water-Cooled Reactors.

11 Letters will be sent to licensees requesting that a review.

. be* conducted and t.hat a loose-parts detect-ion program be prepared and avail able for * *

. inspection 6 months after the effective. is-

.. :.. suance date of the guide~ *Rev. 1 was is-'

  • sued May 28, 1981.)

Core Barrel Vibration Monitoring Status 7 - 06/04/80 (NRR Generic Activity No.

C~12 - Prfmary*

System Vibration Assessment.

Implementation.

position has not been developed. *However, "design*_changes have been.developed for Com-bustion Engineering design and hav~*been im- *

plemented at Palisades.)

I,

~--........... --

~eleted - 11/16/79

)

d TOPIC -

V Compliance with Codes and Standards V Reactor Coolant Pump Overs peed VI Containment Leak Testing __

  • VI-7.A.2 - Upp_er Plenum Injection VI-7.A *. 4 - Core Spray Nozzle, Effectiveness VI-7.D ~ Long Term Cooling Passive Failures VII-l~B - Trip Uncertainty.and Setpoint Analysis Review V II Frequency Decay * *
  • VI II-1.* A - Degraded Gr.id Voltage PALISADES STATUS Inservjce Inspection Status 7 - 10/15/79 (Multi-Plant* issue A Inservice In-spection)

Inservice Testing Status 4 - Valves - 07/24/80 and 01/09/81 Status 7 - Pumps

- 10/15/79 (Multi-Plant issue A Inser.vice Testing)

Status 0 -

(NRR Generic Activity No. B-68 -*Pump Overspeed during a LOCA.

Implementation position has not been developed.)

Status 3 - 09/11/75 (Multi-Plant issue A Appendix J Leak Testing)

Deleted. - 1_1/16/79 Deleted. - 11/16/79 Complete - 08/17/78 (Multi-Plant isstie B-11, Flood of Equip-ment Important to Safety, is not applic-abl~ to this topic.).

Complete - 08/17/78 Complete - 05/19/81 Status 1 - 05/27/81 (Multi-Plant issue B Degraded Grid Voltage)

ENCLOSURE 1

TOPIC IX rire Protection XI Appendix I XI Radiological Monitoring Systems XIII Safeguards/Industrial Security XVII - Operational QA Program

  • P /\\LI Sf\\O ES ST/\\TUS Sta~us 7 - 09/01/78, 03/19/80 and 02/10/81 (Fiie,Protcction SER)

Status 3 - 05/19/81 - {Safe Shutdown Cap-ability - /\\ppcndix R reviews)

{Multi-Plant Issue B-02 Fire Protection)

Status 3 - 01/15/79

{Multi-Plant Issue A Appendix I -

Alara)

Status 0

    • 4

{NRR Generic Activity No. B Effluent and Process Monitoring.

Implementation Position has not been developed for operating plants. A new Appendix A to Standard Re-view Plan fl.5 has been developed, which prescribes design and quality assurance criteria.

Complete - 04/10/79 and 10/01/80

.Complete - 08/17/78 ENCLOSURE 1

)

(i

  • I'

~*

.:J "i:.'

1*

~*

.ENCLOSURE 2 KEY FOR STATUS CODES*

0 -TOPIC NOT STARTED 1 -

QUESTIONS RECEIVED -

.FROM REVIEW BRANCH 2 -

QUESTIONS SENT TO UTILITY 3 -

QUESTION. RESPONSE:

RECEIVED BY NRC 4 -

DRAFT SE RECEIVF.0 FROM REVIEW BRANCH 5 -

DRAFT SE SENT TO UTILITY 6 -

SE RESPONSE RECEIVED BY NRC..

. 7 -

TOPIC COMPLETE.

  • Date following a status code in Enclosure 1 refers to either
  • a letter from the NRC to Licensee or from the Licensee to NRC.