Forwards Request for Tech Spec Changes Re Containment Spray Initiation Time
ML18046A189
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/24/1980
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Crutchfield D
Office of Nuclear Reactor Regulation
Shared Package
ML18046A190 List:
References
NUDOCS 8012010286
Download: ML18046A189 (1)


Text

.r..

consumers Power company General Offices: 212 West Michigan Avenue, Jackson, Michigan 49201 * (517) 788-0550 November 24, 1980 Director, Nuclear Reactor Regulation Att Mr Dennis M Crutchfield, Chief Operating Reactors Branch No_ 5 US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

PROPOSED TECHNICAL SPECIFICATIONS CHANGE RELATED TO CONTAINMENT. SPRAY INITIATION TIME Attached are three (3) original and thirty-seven (37) copies of a request for change to the Palisades Plant Technical Specifications. Licensee Event Report CLER)80-003, dated April 3,1980, reported that initiation times of the containment sprays and full load steam flow for the main steam line break analysis were in error. As a result of a reevaluation of this problem, it was noted that Technical Specifications changes may be needed. : Our LER update submitted on May 13, 1980 described the potential Technical Specifications changes and is the .basis for this request.

The requested changes involve a single issue; therefore, a check in the amount of $4,000 is attached pursuant to 10 CFR 170.22, Class III change.

David P Hoffman Nuclear Licensing Administrator

  • CC Director, Region III, USNRC NRC Resident Inspector-Palisades if

.~~.'

~

-~