Monthly Operating Rept for Oct 1980
ML18046A140
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/07/1980
From: Bodtke P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18046A139 List:
References
NUDOCS 8011120619
Download: ML18046A140 (4)


Text

,

OPERATING DATA REPORT DOCKET NO.

50-255 DATE COMPLETED BY TELEPHONE 11/7 /80 PJBodtke 616-764-8913 OPERATING STATUS I. Unit Name:

Palisades Notes

2. Reporting Period:

801001 -

801031

3. Licensed Thermal Power (MWt): --=2=-5.=.3..=.0 _______ _
4. Nameplate Rating (Gross MWe):

"'8_,,l'-"l'--'-._,_7 ______ _

5. Design Electrical Rating (Net MWe): _....::8:..:0:.:5:__ ____ _
6. Maximum Dependable Capacity (Gross MWe):
  • 675
7. Maximum Dependable Capacity (Net MWe):
  • 635
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:
11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical

.13. Reactor Reserve Shutdown Hours This Month Yr.-to-Date

    • 745 7320 706.2 3467.3
14. Hours Generator On-Line 699. 7 3346. 5
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) l, 663, 008 7, 2 71, 496
17. Gross Electrical Energy Generated (MWH) 5 24, 2 70 2, 24 7, 680
18. Net Electrical Energy Generated (MWH) 4 95, 055 2, 111, 648
19. UnitServiceFactor 93.9 45.7
20. Unit Availability Factor 9 3
  • 9
45. 7
21. Unit Capacity Factor (Using MDC Net) 104. 6
45. 4
22. Unit Capacity Factor (Using DER Net)
82. 5
35. 8
23. Unit Forced Outage Rate
3. 8
13. 4
24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):

TMI Mods, January 1981.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION.

  • Based on condenser backpressure.
  • )~o h

ne our extra because of r~tur:p t.o I \\

Eastern Standard Time.

~\\~.Jl.1.Jl..20 'C) C?{

11/ 13/80 Forecast Cumulative 77,751 43,032.1 40,772.8 78,782,976 24,279,910 22,7S2.,423 52.4 52.. 4 46.1 36.4 35.1 Achieved (Q/77) f 11 I

1!

I 11

'I

MONTII October 1980 AVERAGE DAILY UNIT POWER LEa DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-255 Palisades 11/7/80 PJBodtke 616-764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 626 17 682 2*'

645 18 692 3

682 19 707 4

724 20 730 5

733 21 730 6

735 -.

22 740 7

725 23 736 8

714 24 731 9

434 25 728

.JO 36 26 768 JJ 664 27 744 12 732 28 743 13 1

29 744 14 738 30 732 15 729 31 60 16 703 INS1RUCTIONS On this format, Jist the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

  • 1

!~'>i

\\

Dute 19 801009 20 801031 F: Forc.;ed S: Sched ul cd (9/77)

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Oct. 1980 F

27.3 A

3 s

18.0 B

1 Reason:

A-Equipment Failure (Explain)

B-Maintenance of Test C -Refueling.

Li<.:cnsec Event.

Report#

D-Rcgulatory Rcstrktion E-O'pcrator Truining & Lkcnsc Examination F -Ad min isl rn t ivc

. G-Opera tiunal Error (Explain)

I-I-Other (Explai11)

3.

Method:

I -Manual c

"'in t:: "'

0 "d

.o. ~

Eu 0 u 2-Manual Scram.

3-Autumatic Scram.

4-0ther (Explain)

DOCKET NO.

50-255 UNIT NAME Palisades DATE __ l_l~/_7~/8_0~~~

COMPLETED BY PJBodtke TELEPHONE 616-764-8913

  • cause & Corrective Ac.:tion to Prevent Rec.:urrern.:e Sev.ered caples *in switchyard resulting in plant trip.

Turbine inspection.

4 s

Exhibit G

  • Instructions for Preparation of Data Entry Sheets for U.:ensee Event Report (LER) File (NUREG-0161)

Exhibit I *Same Soun:t'

' *_)*.

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH OF OCTOBER 1980 Normal operation at 96% power the majority of month.

Loss of load tripped the plant on October 9.

Power production continued on October 10.

Plant taken off line the last day of the month for turbine inspection.