~;~*":.:'~*1
/
'\\
"{:'
NEW(,{
L.AllE ON f ARIO\\
~, J
)
(/!~\\-
YORK i
.<):i
- \\,
/ -'\\
1--St*'rt :)
L_);.. _____.... ' --~ ' -* I ROCHESTER GAS AND ELECTRIC CORPORATION
- 89 EAST AVENUE, ROCHESTER, N.Y. 14649
---~4 1
GINN!\\ STATION July 9' 1980 TELEPHONE AREA CODE 716 546-2700 Director, Office of Mmagement Information and Prcgrarn Control U.S. NUCLEAR REGUI.ATORY CCM1ISSION WashLngton, IC 20555
Subject:
Monthly Report for JUNE, 1980 Operating Status Infonnation R. E. Gi.nna Nuclear Power Plant lhlt No. 1 Docket No. 50-244
Dear Sir:
Pul::"suant to a..rr Technical Specification 6.9.1, attached here.vith is the monthly cperatir.g status report for Ginna Station for the rronth of June, 1980.
Very truly yours,
~
Bruce A. Snow Plant Superinterrlent BAS:mn Attachrnents B oo111so. SE1
~-- OPERA TING DAT A REPORT DOCKET NO.
50*244 DATE Ju~ 7 1980 COMPLETED BY £~.,;. ~."'lf~*** ~
Andrew E. McNamara OPERA TING ST A TUS
- 1. Unit Name:
GINNA STATION, UNIT #1
- 2. Reporting Period: *_J.:..u_n_e_l_O...il.,_l-"9-'8'--'0c.-________ _
- 3. Licensed Thermal Power (MWt):
-'-1~5=2-"-0 _______ _
- 4. Nameplate Rating (Gross MWe): ---'4=---9~0 _______ _
- 5. Design Electrical Rating (Net MWe): ---'4-'-7~0----~--
- 6. Maximum Dependable Capacity (Gross MWe): _4_9_0 ____ _
- 7. Maximum Dependable Capacity (Net MWe ): __
4~7_0 ____ _
TELEPHONE 1-315-524-4446, Ext. 205, 293 at Ginna Notes The Reactor Power Level averaged 100% in the Report Period, with a few minor exceptions detailed on Page 4.
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Which Restricted, If Any (Net MWe): ---------------------
! 0. Reasons For Restrictions, If Any:
This Month Yr.-to-Date I I. I lours In Reporting Period 720 31027.25
- 12. Number of Hours Reactor Was Critical 720 31066.25
- 13. Reactor Reserve Shutdown Hours 0
0
- 14. Hours Generator On-Line 720 3,027.25 1 5. Unit Reserve Shutdown Hours 0
0
- 16. Gross. Thermal Energy Generated (MWH)
I 7. Gross Electrical. Energy Generated (MWH) 1,084,200 4,4412800 362,152 1,460,888
- 18. Ne.t Electrical Energy Generated (MWH) 344,844 113881807
- 19. Unit Service Factor 100.00%
69.32%
- 20. Unit Availability Factor 100.00%
69.32%
- 21. Unit Capacity Factor (Using MDC Net) 101.90%
67.66%
- 22. Unit Capacity Factor (Using.DER Net) 101.90%
67.66%
0%
0%
- 23. Unit F~rced Outage Rate 2L Shutdowns Scheduled Over Next.6 Months (Type, Date and Duration of Each):
Scheduled - Steam Generator Inspection and Modifications 10/24 thru 11/23.
- 25. If Shut Down At End Of Report.Period, Estimated Date of Startup:
26-Units In Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast Cumulative 682983.88 70,746.02 1,621.57
- 68,983.88 8 5 92,717,602 30,146,679 28,5501355 74.27%
74.28%
67.74%
- 67. 74%
9.52%
Achieved
- Cumulative total commencing January 1, Corrected8£igure to rectify error made
. 00'1J. 3~
\\~C/ 0 1975 in March, 1980 calculations.
49-88 (REV.
1/781 AVERAGE DAILY UNIT POWER UNIT MONTH June, 1980 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) l 483 2
483 3
483 4
484 5
486 6
486 l
486 8
483 9
481 10 482 11 482 12 482 13 481 14.
480 15 479 16 481 INSTRUCTIONS DOCKETN0.~*5_0_-
2-4-
4 --------~-------
UNIT #1, Ginna Station DATE July 7, 1980 COMPLETED BY ~f.'").?fet.H.,._,,...
Andrew E. McNam~a TELEPHONE 1-315-524-4446 Ext. 293, 205 at Ginna DAY. AVERAGE DAILY POWER LEVEL (MWe-Net) 11 9-.17 18 478 19 481 20 482 21
!1;82 22 482 23 480 24 479 25 480 26 479 21 475 28 477 29 422 30 478 31 On this format, list the average daily unit pe>wer level in MWe-Net for each day in the reporting month.*
Compute to the nearest whole megawatt.
- 49.57 (REV; 1/78)
Ho.
Date 1
2 F: Forced S: Scheduled 49-89 (REV. 1/78)
UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH June, 1980 GI a.
t-Reason:
c_
0 Ill
.. :I 0
- I :c o-N c
0 Ill c
GI 0::
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction*
Licensee Event Report #
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 E..,..
~ "
Ill -a
>. 0.
V) u Method:
I-Manual c "Ill C
GI 0 -a
- a. 0
~u u
2-Manual Scram.
3-Automatic Scram.
4-0ther (Explain)
DOCKET NO.
50-244 UNIT NAME
- 1,Ginna Station DATE July 7 ~ 1980 COMPLETED BY ~l.
llf ~t 111
- 0
,J n rew E.
McNa ara TELEPHONE 1-315-524-4446 Ext. 205, 293 at Ginna Cause & Corrective Action to Prevent Recurrence No shutdowns or significant power reductions to report.
4 s
- 7 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit 1 - Same Source NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE UNIT Ginna Station DATE July 7, 1980 COMPLETED BY ~z
.°le~
Andrew E. McNamara TELEPHONE~~l--3~1~5~-~5~2~4_-4~4~4~6~,~~~~~
Ext. 205, 293 at Ginna MONTH June, 1980 The Reactor Power Level was maintained at 100% for the majority of the month, with the following exceptions of short duration:
6/17 - A power level reduction to /\\) 95% due to a turbine runback.
6/25 - A power level reduction to N 99% to perform a periodic test.
6/27 - A power level reduction to /U 97% to perform a periodic test.
6/29 - A power level reduction to N46% to perform Turbine Intercept, Reheat, Main Steam Stop Valves tests.
6/30 - A power level reduction to IV 97% to perform a periodic test.49-123 (1/781
L' f
\\
GINNA STATION MAINTENANCE REPORT FOR JUNE, 1980
- D.n:'ing June, normal inspections and minor maintenance was perfm:med.
Maj or safety related maintenance included: 1.
Replacement of the pump and bowl assemblies on both fire service water pumps with a new style assembly that will increase discharge pressure above the required value at rated flow.