Forwards Monthly Operating Rept for June 1980
ML18045A888
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/09/1980
From: Snow B
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML18045A889 List:
References
NUDOCS 8007150584
Download: ML18045A888 (6)


Text

~;~*":.:'~*1

/

'\\

"{:'

NEW(,{

L.AllE ON f ARIO\\

~, J

)

(/!~\\-

YORK i

.<):i

\\,

/ -'\\

1--St*'rt :)

L_);.. _____.... ' --~ ' -* I ROCHESTER GAS AND ELECTRIC CORPORATION

  • 89 EAST AVENUE, ROCHESTER, N.Y. 14649

---~4 1

GINN!\\ STATION July 9' 1980 TELEPHONE AREA CODE 716 546-2700 Director, Office of Mmagement Information and Prcgrarn Control U.S. NUCLEAR REGUI.ATORY CCM1ISSION WashLngton, IC 20555

Subject:

Monthly Report for JUNE, 1980 Operating Status Infonnation R. E. Gi.nna Nuclear Power Plant lhlt No. 1 Docket No. 50-244

Dear Sir:

Pul::"suant to a..rr Technical Specification 6.9.1, attached here.vith is the monthly cperatir.g status report for Ginna Station for the rronth of June, 1980.

Very truly yours,

~

Bruce A. Snow Plant Superinterrlent BAS:mn Attachrnents B oo111so. SE1

~-- OPERA TING DAT A REPORT DOCKET NO.

50*244 DATE Ju~ 7 1980 COMPLETED BY £~.,;. ~."'lf~*** ~

Andrew E. McNamara OPERA TING ST A TUS

1. Unit Name:

GINNA STATION, UNIT #1

2. Reporting Period: *_J.:..u_n_e_l_O...il.,_l-"9-'8'--'0c.-________ _
3. Licensed Thermal Power (MWt):

-'-1~5=2-"-0 _______ _

4. Nameplate Rating (Gross MWe): ---'4=---9~0 _______ _
5. Design Electrical Rating (Net MWe): ---'4-'-7~0----~--
6. Maximum Dependable Capacity (Gross MWe): _4_9_0 ____ _
7. Maximum Dependable Capacity (Net MWe ): __

4~7_0 ____ _

TELEPHONE 1-315-524-4446, Ext. 205, 293 at Ginna Notes The Reactor Power Level averaged 100% in the Report Period, with a few minor exceptions detailed on Page 4.

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe): ---------------------

! 0. Reasons For Restrictions, If Any:

This Month Yr.-to-Date I I. I lours In Reporting Period 720 31027.25

12. Number of Hours Reactor Was Critical 720 31066.25
13. Reactor Reserve Shutdown Hours 0

0

14. Hours Generator On-Line 720 3,027.25 1 5. Unit Reserve Shutdown Hours 0

0

16. Gross. Thermal Energy Generated (MWH)

I 7. Gross Electrical. Energy Generated (MWH) 1,084,200 4,4412800 362,152 1,460,888

18. Ne.t Electrical Energy Generated (MWH) 344,844 113881807
19. Unit Service Factor 100.00%

69.32%

20. Unit Availability Factor 100.00%

69.32%

21. Unit Capacity Factor (Using MDC Net) 101.90%

67.66%

22. Unit Capacity Factor (Using.DER Net) 101.90%

67.66%

0%

0%

23. Unit F~rced Outage Rate 2L Shutdowns Scheduled Over Next.6 Months (Type, Date and Duration of Each):

Scheduled - Steam Generator Inspection and Modifications 10/24 thru 11/23.

25. If Shut Down At End Of Report.Period, Estimated Date of Startup:

26-Units In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast Cumulative 682983.88 70,746.02 1,621.57

  • 68,983.88 8 5 92,717,602 30,146,679 28,5501355 74.27%

74.28%

67.74%

67. 74%

9.52%

Achieved

  • Cumulative total commencing January 1, Corrected8£igure to rectify error made

. 00'1J. 3~

\\~C/ 0 1975 in March, 1980 calculations.

49-88 (REV.

1/781 AVERAGE DAILY UNIT POWER UNIT MONTH June, 1980 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) l 483 2

483 3

483 4

484 5

486 6

486 l

486 8

483 9

481 10 482 11 482 12 482 13 481 14.

480 15 479 16 481 INSTRUCTIONS DOCKETN0.~*5_0_-

2-4-

4 --------~-------

UNIT #1, Ginna Station DATE July 7, 1980 COMPLETED BY ~f.'").?fet.H.,._,,...

Andrew E. McNam~a TELEPHONE 1-315-524-4446 Ext. 293, 205 at Ginna DAY. AVERAGE DAILY POWER LEVEL (MWe-Net) 11 9-.17 18 478 19 481 20 482 21

!1;82 22 482 23 480 24 479 25 480 26 479 21 475 28 477 29 422 30 478 31 On this format, list the average daily unit pe>wer level in MWe-Net for each day in the reporting month.*

Compute to the nearest whole megawatt.

  • 49.57 (REV; 1/78)

Ho.

Date 1

2 F: Forced S: Scheduled 49-89 (REV. 1/78)

UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH June, 1980 GI a.

t-Reason:

c_

0 Ill

.. :I 0

I :c o-N c

0 Ill c

GI 0::

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction*

Licensee Event Report #

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 E..,..

~ "

Ill -a

>. 0.

V) u Method:

I-Manual c "Ill C

GI 0 -a

a. 0

~u u

2-Manual Scram.

3-Automatic Scram.

4-0ther (Explain)

DOCKET NO.

50-244 UNIT NAME

  1. 1,Ginna Station DATE July 7 ~ 1980 COMPLETED BY ~l.

llf ~t 111

  • 0

,J n rew E.

McNa ara TELEPHONE 1-315-524-4446 Ext. 205, 293 at Ginna Cause & Corrective Action to Prevent Recurrence No shutdowns or significant power reductions to report.

4 s

- 7 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit 1 - Same Source NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE UNIT Ginna Station DATE July 7, 1980 COMPLETED BY ~z

.°le~

Andrew E. McNamara TELEPHONE~~l--3~1~5~-~5~2~4_-4~4~4~6~,~~~~~

Ext. 205, 293 at Ginna MONTH June, 1980 The Reactor Power Level was maintained at 100% for the majority of the month, with the following exceptions of short duration:

6/17 - A power level reduction to /\\) 95% due to a turbine runback.

6/25 - A power level reduction to N 99% to perform a periodic test.

6/27 - A power level reduction to /U 97% to perform a periodic test.

6/29 - A power level reduction to N46% to perform Turbine Intercept, Reheat, Main Steam Stop Valves tests.

6/30 - A power level reduction to IV 97% to perform a periodic test.49-123 (1/781

L' f

\\

GINNA STATION MAINTENANCE REPORT FOR JUNE, 1980

  • D.n:'ing June, normal inspections and minor maintenance was perfm:med.

Maj or safety related maintenance included: 1.

Replacement of the pump and bowl assemblies on both fire service water pumps with a new style assembly that will increase discharge pressure above the required value at rated flow.