OPERA TING DAT A REPORT OPERATING STATUS

1. Unit Name:

PALISADES 8ll. 7

. 2. Reporting Period:

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe ):
5. Design Electrical Rating (Net MWe):
  • __

8_0_5_* ------

6. Maximum Dependable Capacity (Gross MWe): __
  • ._6.;..7_5_* ___ _
7. Maximum Dependable Capacity (Net MWe):

_. _*_6_3_5 ___ _

800301 -

800331 2530 Notes DOCKET NO. 50-255 DATE 4/ 1/80 COMPLETED BY PJBodtke.

TELEPHONE 616-7 64-8 913

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which.Restricted, If Any (Net MWe):
10. ~easons For Restrictions, If Any:

This Month

11. Hours In Reporting Period i2. Number Of Hours Reactor Was Critkal 744 0
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 0
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 0 0
18. Net Electrical Energy Generated (MWH) 0
19. Unit Service Factor 0
20. Unit Availability Factor 0
21. Unit Capacity Factor (Using MDC Net) 0
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0

0 Yr.-to-Date 2184 0

0 O*

0 0

0 0

0 0

0 Cumulative n,615 39,564.8

. 37,426:3 71,511,480 22,032,230 20,610;775 52.0 52.0 44.8 35.4.

36.3

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

~*:.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

  • Based on Condenser Backpressure April 28*, 1980 Forecast Achieved

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-255 UNIT Palisades DATE 4/1/80 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 MONTH March 1980 DAY AVERAGE DAILY POWER LEVEL DAY A VERA GE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 0 17 o*

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27

0.

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

16 0

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting mLJnth. Compute to the nearest whole megawatt.

(9/77)

Nu:

13 (Contd F: Forced Date 800301 S: Scheduled (9/77) 2 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH March 1980

-Q)

0.

I-.

s Reason:

744 H

A-Equipment Failure (Explain)

B-Maintenance or Test

(-Refueling D-Regulatory Rest riCtion Licensee Event Report#

E-Operator Training & License Examination F-Administrative G-Operational Errur (Explain)

H-Other (Explain) 3 Method:

I-Manual c

Q)Vl c

Q) 0 "O

.0. =>

Eu 0 u 2-Manual Scram.

3-Automatic Scram.

4-0ther (Explain)

DOCKET NO. _5_0_-_2_55 ___ _

UNIT NAME Palisades DATE 4/1/80 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 Cause & Corrective Action to Prevent Recurrence TMI Modifications and anchor bolt inspections/repairs according to IE Bulletin 79-02.

  • 4 5

Exhibit G - Inst ructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit I - Same Source

GENERAL

SUMMARY

OF OPERATING EXPERIENCE FOR MARCH 1980 Work continues on the seismic pipe hanger/anchor bolts inspections and repairs, and TMI modifications.