ML18044A614

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1980
ML18044A614
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/03/1980
From: Bodtke P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18044A613 List:
References
NUDOCS 8003110480
Download: ML18044A614 (4)


Text

/

I

\\

-~.

OPERATING DATA REPORT DOCKET NO.

DATE COMPLETED BY TELEPHONE 50-255 3/3/80 PJBodtke 616-764-8913 OPERATING STATUS

1. Unit Name:

Palisades Notes

. 2. Reporting Period:

800201 - 800229 805

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

2530 811. 7

6. Maximum Dependable Capacity (Gross MWe):
  • 6 75
7. Maximum Dependable Capacity (Net MWe):
  • 635
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date

11. Hours In Reporting Period 696 1440
12. Number Of Hours Reactor Was Critieal 0

0

13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 0

0

15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 0 0
17. Gross Electrical Energy Generated (MWH) 0 0
18. Net Electrical Energy Generated (MWH).

0 0

19. Unit Service Factor 0

0

20. Unit Availability Factor 0.

0

21. Unit Capacity Factor (Using MDC Net) 0 0
22. Unit Capacity Factor (Using DER Net) 0 0
23. Unit Forced Outage Rate 0

0 *.

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Cµmulative 71,871.

39,564.8 71, 511, 480 22.~032 t230 2 0 ' 6 7 0 *, 77 5 52.1 52.1 45.3

35. 7*

36.3

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

April 25, 1980

26. Units In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

  • Based on Condenser Backpressure Forecast Achieved.

s oos11 o '{fo (Q/77)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-255 UNIT Palisades DATE 3/3/80 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 MONTH February 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 0 17 o*

0 18 0

2 3

0 19 0

4 0

20 0

5 0

21 0

6 0

22 0

0 23 0

7 8

0 24 0

9 0

25 0

10 0

26 0

11 0

27 O*

12 0

28 0

13 0

29 0

14 0

30 15 0

31 16 0

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

No:

Date 13 800201 Contd)

F: Forced S: Scheduled (9/77)

  • /

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORTMONTH Feb. 1980

""L

~

)

r-1

.:) ::o-

- ~

'J

.3 ~

'1J

)

-0 *= '"'

0.
l

~ ~>~

E ~

I-.

l :I:

OJ cc:

OJ -

c o--

~ VJ.;i:

8 s

696 H

Reason:

A-Equipment Failure (Explain)

B-Maintenance of Test

('-Refueling D-Regulatury Rest rii:tiun Licensee Event Report :Ji:

E-Operatur Training & License Examination F-Administrative G-Opera tiunal Error (Explain)

H-Other (Explain) 3 c

E"""

<!JV) c

'1J

'1J

'1J

.~~

0 "Cl

  • E-:)

VJU OU u

Method:

I-Manual 2-Manual Scram.

3-Autumatic Scram.

4-0ther (Explain)

TMI DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-255 Palisades 3/3/80 PJBodtke 616-764-8913 Cause & Corrective At:tiun tu Prevent Recurrence Modifications and anchor bolt inspections/repairs according to IE Bulletin 4

5 79-02...

~

Exhibit G

  • Instructions fur Prepara tiun of Data Entry Sheets fur Licensee Event Report (lER) File (NUREG-0161)

Exhibit I - Same Source

GENERAL

SUMMARY

OF OPERATING EXPERIENCE FOR FEBRUARY 1980 Work continues on the seismic pipe hanger/anchor bolts inspections and repairs, and TMI modifications.