Text
/
I
\\
-~.
OPERATING DATA REPORT DOCKET NO.
DATE COMPLETED BY TELEPHONE 50-255 3/3/80 PJBodtke 616-764-8913 OPERATING STATUS
- 1. Unit Name:
Palisades Notes
. 2. Reporting Period:
800201 - 800229 805
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
2530 811. 7
- 6. Maximum Dependable Capacity (Gross MWe):
- 6 75
- 7. Maximum Dependable Capacity (Net MWe):
- 635
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date
- 11. Hours In Reporting Period 696 1440
- 12. Number Of Hours Reactor Was Critieal 0
0
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 0
0
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 0 0
- 17. Gross Electrical Energy Generated (MWH) 0 0
- 18. Net Electrical Energy Generated (MWH).
0 0
- 19. Unit Service Factor 0
0
- 20. Unit Availability Factor 0.
0
- 21. Unit Capacity Factor (Using MDC Net) 0 0
- 22. Unit Capacity Factor (Using DER Net) 0 0
- 23. Unit Forced Outage Rate 0
0 *.
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Cµmulative 71,871.
39,564.8 71, 511, 480 22.~032 t230 2 0 ' 6 7 0 *, 77 5 52.1 52.1 45.3
- 35. 7*
36.3
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
April 25, 1980
- 26. Units In Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on Condenser Backpressure Forecast Achieved.
s oos11 o '{fo (Q/77)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-255 UNIT Palisades DATE 3/3/80 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 MONTH February 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 0 17 o*
0 18 0
2 3
0 19 0
4 0
20 0
5 0
21 0
6 0
22 0
0 23 0
7 8
0 24 0
9 0
25 0
10 0
26 0
11 0
27 O*
12 0
28 0
13 0
29 0
14 0
30 15 0
31 16 0
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
No:
Date 13 800201 Contd)
F: Forced S: Scheduled (9/77)
- /
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORTMONTH Feb. 1980
""L
~
- )
r-1
.:) ::o-
- ~
'J
.3 ~
'1J
- )
-0 *= '"'
- 0.
- l
~ ~>~
E ~
I-.
- l :I:
OJ cc:
OJ -
c o--
~ VJ.;i:
8 s
696 H
Reason:
A-Equipment Failure (Explain)
B-Maintenance of Test
('-Refueling D-Regulatury Rest rii:tiun Licensee Event Report :Ji:
E-Operatur Training & License Examination F-Administrative G-Opera tiunal Error (Explain)
H-Other (Explain) 3 c
E"""
<!JV) c
'1J
'1J
'1J
- .~~
0 "Cl
- E-:)
VJU OU u
Method:
I-Manual 2-Manual Scram.
3-Autumatic Scram.
4-0ther (Explain)
TMI DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-255 Palisades 3/3/80 PJBodtke 616-764-8913 Cause & Corrective At:tiun tu Prevent Recurrence Modifications and anchor bolt inspections/repairs according to IE Bulletin 4
5 79-02...
~
Exhibit G
- Instructions fur Prepara tiun of Data Entry Sheets fur Licensee Event Report (lER) File (NUREG-0161)
Exhibit I - Same Source
GENERAL
SUMMARY
OF OPERATING EXPERIENCE FOR FEBRUARY 1980 Work continues on the seismic pipe hanger/anchor bolts inspections and repairs, and TMI modifications.