OPERATING DATA REPORT OPERATING STATUS I. Unit Name:

Palisades

2. Reporting Period:

800101 800131 811. 7

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe ):

2530

5. Design Electrical Rating (Net MWe): --=8=0=-5-* ------
6. Maximuni Dependable Capacity (Gross MWe):

. *675

7. Maximum Dependable Capacity (Net MWe):
  • 635 Notes DOCKET NO.

DATE COMPLETED BY TELEPHONE

  • 50-255 2/8/80
PJBodtke, 616-764-8913
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):

IO. Reasons For Restrictions, If Any:

This Month Yr.-to-Date

11. Hours In Reporting Period 744 744 i2. Number Of Hours Reactor Was Critical 0

0

13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 0

0

15. Unit Reserve Shutdown Hours 0
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 0

0 0

0 0

0 0

20. Unit Availability Factor 0

0

21. Unit Capacity Factor (Using MDC Net) 0 0
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0

0 0

o.
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

  • Based on Condenser Backpressure March 1 1980 Forecast Cµmulative 71,175 39,564.8 3 7' 426". 3 71,511,480 22,032,230 20' 670", 77 5 52.6 52.6

.45.7

36. l*

36.3 Achieved

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-255 UNIT Palisades DATE 2/8/80 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 MONTH January 1980 DAY AVERAGE DAILY POWER LEVEL DAY A VERA GE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 0 17 o*

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27

o.

12 0

28 0

13 0

29 0

14 0

30 0

IS 0

31 0

16

  • o INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

I..

L Nu:

13 (Contd' F: Forced Date 800101 S: Scheduled

. (9/77)

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Jan. 1980

.-cu

0.

f-.

s Reason:

744 H

A-Equipment Failure (Explain)

B-Maintenance oi Test C -Refueling D-Regulatory Restriction Licensee Event Report :it E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

Ii-Other (Explain) 3 i::

<UV) c: cu 0 "O

.o. ~

Eu 8

Method:

3-Automatic Scram.

4-0ther (Explain)

DOCKET NO.

50-255 UNIT NAME DATE COMPLETED BY TELEPHONE Palisades 2/8/80 PJBodtke 616-764-8913 Cause & Corrective At:tion to Prevent Recurrcnt:e TMI Modifications and anchor bolt inspections/repairs according to IE Bulletin 7 9-02 *..

4 5

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit I - Same Source

GENERAL

SUMMARY

OF OPERATING EXPERIENCE FOR JANUARY 1~80 Work continues on the seismic pipe hanger/anchor bolts inspections and repairs, and TMI modifications.