Text
(""
OPERATING DATA REPORT OPERATING STATUS I. Unit Name:
Palisades
- 2. Reporting Period:
800101 800131 811. 7
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe ):
2530
- 5. Design Electrical Rating (Net MWe): --=8=0=-5-* ------
- 6. Maximuni Dependable Capacity (Gross MWe):
. *675
- 7. Maximum Dependable Capacity (Net MWe):
- 635 Notes DOCKET NO.
DATE COMPLETED BY TELEPHONE
- 50-255 2/8/80
- PJBodtke, 616-764-8913
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
IO. Reasons For Restrictions, If Any:
This Month Yr.-to-Date
- 11. Hours In Reporting Period 744 744 i2. Number Of Hours Reactor Was Critical 0
0
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 0
0
- 15. Unit Reserve Shutdown Hours 0
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 0
0 0
0 0
0 0
- 20. Unit Availability Factor 0
0
- 21. Unit Capacity Factor (Using MDC Net) 0 0
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0
0 0
- o.
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on Condenser Backpressure March 1 1980 Forecast Cµmulative 71,175 39,564.8 3 7' 426". 3 71,511,480 22,032,230 20' 670", 77 5 52.6 52.6
.45.7
- 36. l*
36.3 Achieved
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-255 UNIT Palisades DATE 2/8/80 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 MONTH January 1980 DAY AVERAGE DAILY POWER LEVEL DAY A VERA GE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 0 17 o*
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27
- o.
12 0
28 0
13 0
29 0
14 0
30 0
IS 0
31 0
16
- o INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
I..
L Nu:
13 (Contd' F: Forced Date 800101 S: Scheduled
. (9/77)
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Jan. 1980
.-cu
- 0.
f-.
s Reason:
744 H
A-Equipment Failure (Explain)
B-Maintenance oi Test C -Refueling D-Regulatory Restriction Licensee Event Report :it E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
Ii-Other (Explain) 3 i::
<UV) c: cu 0 "O
.o. ~
Eu 8
Method:
- I-Manual 2-Manual Scram.
3-Automatic Scram.
4-0ther (Explain)
DOCKET NO.
50-255 UNIT NAME DATE COMPLETED BY TELEPHONE Palisades 2/8/80 PJBodtke 616-764-8913 Cause & Corrective At:tion to Prevent Recurrcnt:e TMI Modifications and anchor bolt inspections/repairs according to IE Bulletin 7 9-02 *..
4 5
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit I - Same Source
GENERAL
SUMMARY
OF OPERATING EXPERIENCE FOR JANUARY 1~80 Work continues on the seismic pipe hanger/anchor bolts inspections and repairs, and TMI modifications.