OPERATING DATA REPORT OPERA TING STATUS
- 1. Unit Name:
Palisades Notes
- 2. Reporting Period:
791201 - 791231
- 3. Licensed Thermal Power (MWt):
2530
- 4. Nameplate Rating (Gross MWe ):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
- 675*
811. 7 805
- *635 DOCKET NO.
DATE COMPLETED BY TELEPHONE 50-255 1/4/80 PJBodtke.
616-764-8913
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date 8760
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critieal 744 0
5368.9
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 0
5244. 5
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 0 12, 046, 848
- 17. Gross Electrical Energy Generated (MWH) 0 3, 640, 590
- 18. Net Electrical Energy Generated (MWH) 0 3, 433, 264
- 19. Unit Service Factor 0
5 9. 9 *.
- 20. Unit Availability Factor 0.
5 9. 9
- 21. Unit Capacity Factor (Using MDC Net) 0
- 61. 7
- 22. Unit Capacity Factor (Using DER Net) 0
- 48. 7
- 23. Unit Forced Outage Rate 0
- 12. 7
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
Cµmulative
. 70,431 39,564.8 37,426~*3 71,511,480 22,032,230 20,670~775 53.l 53.1
'4.6.'2 36~5*
36.3
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
February 15, 1980
- 26. Units In Test Status (Prior to Commercial Operation}:
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION.
- Based on Condenser Backpressure Forecast Achieved.
(--.
(':_.,.._
l
~-
A'RAGE DAILY UNIT POWER LEVEL DOCKET NO.. 50;..255 UNIT Palisades DATE 1/4/80 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 MONTH December 1979 DAY A VERA GE DAILY POWER LEVEL DAY A VERA GE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 0 17 o*
2 0
18 0
3*
0 19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27
- 0.
12 0
28 0
13 0
29 0
14 0
30 0
IS 0
31 0
16 0
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
No:
Date
.e 13 791201 (Contd F: Forced S: Scheduled (lJ/77)
\\
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Dec. 197 9 rr,....
0 r-1
- '5 eo....,
'J
.s ~
OJ 0
"'O *= "'
- 0.
- l
~ -
QJ
"' ~
..c:; 0:::
~ :e:
f-..
'!)
- ~...c =
e:::
o-
- _;; c
- n. :?;
0 0
s 744 c
~
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C'-Refueling D-Regulatory Restriction
'Licensee Event Repo~t *#
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 c
Ev QJV) t:
QJ OJ QJ 0 "O
.,Vi~
.o. :::i
- . >. ~.
Eu c:n u 0 u Method:
I-Manual 2-Manual Scram.
3-Automatic Scram.
4-0ther (Explain)
DOCKET NO.
50-255 UNIT NAME DATE COMPLETED BY TELEPHONE Palisades 1/4/80 PJBodtke 616-764-8913 Refueling 4
5 Cause & Corrective Action to Prevent Recurrence Outage Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit I - Same Smm:e
r
l GENERAL
SUMMARY
OF OPERATING EXPERIENCE FOR DECEMBER 1979 The unit remained shutdown the entire month of December for the continuation of the refueling outage.