OPERA TING DAT A REPORT OPERATING STATUS I. Unit Name:

Palisades

2. Reportfog Period:

791101 - 791130

3. Licensed Thermal Power (MWt):

2530

  • 675
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

811. 7 805*

7. Maximum Dependable Capacity (Net MWe):

__ *_6""'3"-'5"-----

Notes DOCKET NO.

DATE COMPLETED BY TELEPHONE 50-255 12/5/79 PJBodtke.

616-764-8913

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date

11. Hours In Reporting Period 720 8016 5368.9
12. Number Of Hours Reactor Was Critkal 0
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 0

5244.5

15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy. Generated (MWH)

..::.0 ___ _

17. Gross Electrical Energy Generated (MWH) 0 12,046,848 3,640,590
18. Net Electrical Energy Generated (MWH) 0 3,433,264
19. Unit Service Factor 0

65.4

20. Unit Availability Factor 0

65.4

21. Unit Capacity Factor (Using MDC Net) 0
  • 67.4
22. Unit Capacity Factor (Using DER Net)

"0'-'0~---

53.2

23. Unit Forced Outage Rate 0;.__ __ _

12.7

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION.

  • Based on Condenser Backpressure Late December Forecast 7912130 Cµmulative 69,687.

39,564.8 37.4Z6.3 71,511,480 22,032,230 20,670, 775 53.7 53.7 46.7 36.8 36.3 Achieved (9/77) 299

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-255 UNIT Palisades DATE 12/5/79 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 MONTH November 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 0 17 o*

0 18 0

2 3

0 19 0

4 0

20 0

5 0

21 6

0 22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 Q.

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 i_~'

16 0

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

Nu.

13 (Contd F: Forced Date 791101 S: Scheduled (9 /77) 2 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORTMONTH Nov. 1979 s

720 c

Reason:

A-Equipment Failure (Explain)

B-Maintenance of Test C'-Refueling D-Regulatory RestriCtion Licensee Event

  • Report :it E-Operator Training & License Examination F-Administrative G-Opera ti on al Error (Explain)

H-Other (Explain) 3 Method:

I-Manual c

CUV) t:: cu 0 "O

.0. ':l Eu

':l u

2-Manual Scram.

3-Automatic Scram.

4-0ther (Explain)

DOCKET NO.

50-255 UNIT NAME DATE COMPLETED BY TELEPHONE Palisades 12/5/79 PJBodtke 616-764-8913 Cause & Corrective Action to Prevent Recurrence Refueling outage 4

5 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit I - Same Source

(

{... --

GENERAL

SUMMARY

OF OPERATING EXPERIENCE FOR NOVEMBER 1979 The unit remained shutdown the entire month of November for the continuation of the refueling outage.