OPERA TING DAT A REPORT OPERATING STATUS I. Unit Name:
Palisades
- 2. Reportfog Period:
791101 - 791130
- 3. Licensed Thermal Power (MWt):
2530
- 675
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
811. 7 805*
- 7. Maximum Dependable Capacity (Net MWe):
__ *_6""'3"-'5"-----
Notes DOCKET NO.
DATE COMPLETED BY TELEPHONE 50-255 12/5/79 PJBodtke.
616-764-8913
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date
- 11. Hours In Reporting Period 720 8016 5368.9
- 12. Number Of Hours Reactor Was Critkal 0
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 0
5244.5
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy. Generated (MWH)
..::.0 ___ _
- 17. Gross Electrical Energy Generated (MWH) 0 12,046,848 3,640,590
- 18. Net Electrical Energy Generated (MWH) 0 3,433,264
- 19. Unit Service Factor 0
65.4
- 20. Unit Availability Factor 0
65.4
- 21. Unit Capacity Factor (Using MDC Net) 0
- 67.4
- 22. Unit Capacity Factor (Using DER Net)
"0'-'0~---
53.2
- 23. Unit Forced Outage Rate 0;.__ __ _
12.7
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION.
- Based on Condenser Backpressure Late December Forecast 7912130 Cµmulative 69,687.
39,564.8 37.4Z6.3 71,511,480 22,032,230 20,670, 775 53.7 53.7 46.7 36.8 36.3 Achieved (9/77) 299
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-255 UNIT Palisades DATE 12/5/79 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 MONTH November 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 0 17 o*
0 18 0
2 3
0 19 0
4 0
20 0
5 0
21 6
0 22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 Q.
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 i_~'
16 0
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
Nu.
13 (Contd F: Forced Date 791101 S: Scheduled (9 /77) 2 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORTMONTH Nov. 1979 s
720 c
Reason:
A-Equipment Failure (Explain)
B-Maintenance of Test C'-Refueling D-Regulatory RestriCtion Licensee Event
- Report :it E-Operator Training & License Examination F-Administrative G-Opera ti on al Error (Explain)
H-Other (Explain) 3 Method:
I-Manual c
CUV) t:: cu 0 "O
.0. ':l Eu
':l u
2-Manual Scram.
3-Automatic Scram.
4-0ther (Explain)
DOCKET NO.
50-255 UNIT NAME DATE COMPLETED BY TELEPHONE Palisades 12/5/79 PJBodtke 616-764-8913 Cause & Corrective Action to Prevent Recurrence Refueling outage 4
5 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit I - Same Source
(
{... --
GENERAL
SUMMARY
OF OPERATING EXPERIENCE FOR NOVEMBER 1979 The unit remained shutdown the entire month of November for the continuation of the refueling outage.