Monthly Operating Rept for Oct 1979
ML18044A220
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/01/1979
From: Bodtke P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18044A219 List:
References
NUDOCS 7911090436
Download: ML18044A220 (4)


Text

.---

(

OPERATING DATA REPORT OPERA TING STATUS I. Unit Name:

Palisades

2. Reporting Period:
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe ):
5. Design Electrical Rating (Net MWe):

791001 - 791031 2530 811. 7 805

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

Notes

~6.75

  • 635 DOCKET NO.

DATE COMPLETED BY TELEPHONE 50-255 11/1/79 PJBodtke.

616-764-8913

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which.Restricted, If Any (Net MWe):

IO. Reasons For Restrictions, If Any:

This Month

11. Hours In Reporting Period 744
12. Number Of Hours Reactor Was Critieal 0
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 0
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 0
17. Gross Electrical Energy Generated (MWH) 0
18. Net Electrical Energy Generated (MWH).
  • 0
19. Unit Service Factor 0
20. Unit Availability Factor 0
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 0 0
23. Unit Forced Outage Rate 0

Yr.-to-Date 7295 5368.9 5244.5 12,046,848 3,640,590 3,433,264

71. 9.
71. 9 74.1 58.5 12.7 Cµmulative 68*,966.

.39,564.8

.~.

37,426~3 "1

~

  • J...

71,511,480 22,032,230 20,670,775 54.3 54.3 47,2 37.2*

36.3

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION.

  • Based on Condenser Backpressure Early December Forecast Achieved (Q/77) 7911090 ~~

I\\

e e

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-255 UNIT Palisades DATE 11/ 1/79 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 MONTH October 1979 DAY A VERA GE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 0 17 o*

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 Q.

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

16 0

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77) 1

Nll:

Date

\\

13 791001 (Contd F: Forced S: Scheduled (9/77)

L UNIT SHUTDOWNS AND POWER REDUCTIONS REPORTMONTH Oct. 1979 rr:_

0

  • ~ ~u

~ "'

'1)

  • = ~

0

0.

~ ;'~

~

I-..

3 ::C o--

~

~ Cil.~

0 0

s 744 c

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C'-Refueling D-Regulatory Restrktion Licensee Event

  • Report*#

E-Operator Training & License Examination F-Administrative G-Opera ti on al Error (Explain)

H-Other (Explain) 3 c:

Ev II.IV) c:

II.I

'1)

II.I

.. ~~

0 "'

.o. 0

[/) u Eu 0 u Method:

I-Manual 2-Manual Scram.

3-Automatic Scram.

4-0ther (Explain)

Refueling DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-255 Palisades 11/1/79 PJBodtke 616-764-8913 Cause & Corrective Action to Prevent Recurrence outage 4

5 Exhibit G *Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit I

  • Same Soun:e 9*

SUMMARY

OF SHUTDOWN EXPERIENCE FOR OCTOBER 1979 GENERAL The unit remained shutdown the entire month of October for the continuation of the refueling outage.